BAM Gold Project

 Located on the Junior Lake Property, with 45+km potential strike length over a highly prospective Archean greenstone belt, in the flourishing gold mining jurisdiction of Ontario in Eastern Canada

History of BAM

Initial drilling intersected broad zones of near-surface gold mineralisation, marking the first recognition of the deposit. Following this discovery, successive drilling campaigns rapidly expanded the footprint of the mineralised system along strike and at depth.

Since then, BAM has developed into the Company’s flagship asset, with ongoing work focused on increasing the resource and advancing the project, doing technical studies to improve the confidence in the resource, and advancing it toward potential development.

2024

  • June

    Raised £4.28m to advance BAM; commenced geological work to increase understanding of BAM’s mineralisation ahead of drilling programme

  • July

    Alexander Shaw appointed as CEO of Landore

2025

  • March

    Results of 2024 Infill drill core sampling programme indicate gold upside at Junior Lake

  • 3,500m diamond drilling programme commences at BAM

  • Acquisition of a number of mineral claims known as Willet Lake, east of BAM and Toronto Lake

  • June

    Spring 2025 drilling programme confirms additional mineralisation to east and west of existing resource and grade consistency at BAM

2026

  • January

    New MRE completed by SLR Consulting for BAM confirms 622,300 oz Au Indicated & 33,700 oz Inferred, increasing confidence in the mineralisation.

0 Ounces gold

Indicated

0 Grade (g/t Au)

Inferred

0 Grade (g/t Au)

Indicated

0 (oz)

Inferred

0 (oz)

BAM Gold Mineralisation

The 2026 BAM Gold Project MRE was compiled by SLR Consulting Canada, in accordance with the 2019 Canadian Institute of Mining (CIM) Best Practices Guidelines.

It provides a robust understanding of Landore’s Junior Lake deposits, principally the BAM Gold Project, and significantly increases confidence in the asset’s ore bodies.

With approximately 656,000 ounces of Indicated (622.3koz at 1.1g/t) and Inferred (33.7koz at 0.96 g/t) gold at an overall cut-off grade of 0.21g/t within an optimised pit shell in one of the most mining friendly jurisdictions in the world, the 2026 MRE update has outlined a solid platform to develop BAM against a backdrop of an increasingly strong gold prices. SLR’s updated CIM-compliant MRE within an optimised pit shell (effective as of 16 January 2026) at a 0.21 g/t gold cut-off grade using a long-term gold price of US$3,000/oz is outlined below:

BAM Gold Deposit Mineral Resource Statement

ClassTonnes
(Mt)
Au
(g/t)
Au
(koOz)
Indicated19.11.01622.3
Inferred1.10.9633.7

The majority of BAM’s resource at the Junior Lake Property is in the Indicated category, which increases confidence in the mineralisation and further derisks our flagship asset.

The updated MRE also incorporated the Spring 2025 drilling campaign which comprised of 14 HQ diameter drill holes totalling of 3,549 metres, as well as the infill sampling programmes from summer and winter 2025.

Landore’s B-47 Nickel-Copper-Cobalt-PGE Deposit and VW Nickel-Copper-Cobalt Deposit located within 2 kilometres of BAM at Junior Lake, were also updated in the MRE report.

Click here for more information on Landore’s critical minerals assets.

B4-7 Nickel Copper Cobalt PGE Deposit Total Mineral Resources

Total Mineral ResTonnes
(‘000s)
Ni
(%)
Cu
(%)
Co
(%)
Pt
(g/t)
Pg
(g/t)
Au
(g/t)
NiEq
(%)
Ni
(kt)
Cu
(kt)
Co
(kt)
Pt
(koz)
Pd
(koz)
Au
(koz)
Indicated3,4280.600.410.050.130.530.031.2520,707.314,062.41,799.814.358.23.3
Inferred1,0690.370.360.030.060.350.030.893,996.33,850.6350.92.212.10.9

VW Nickel-Copper-Cobalt Deposit Total Mineral Resources

Total Mineral ResTonnes
(‘000s)
Ni
(%)
Cu
(%)
Co
(%)
Pt
(g/t)
Pd
(g/t)
Au
(g/t)
NiEq
(%)
Ni
(kt)
Cu
(kt)
Co
(kt)
Pt
(koz)
Pd
(koz)
Au
(koz)
Indicated3,5740.400.050.020.030.040.010.4714,413.71,913.3585.63.44.41.2
Inferred5380.430.050.020.020.030.010.502,300.2284.193.00.40.60.2

BAM Gold Project, Ontario

BAM Exploration

Landore’s exploration team, under the leadership of CEO Alexander Shaw, has developed a data-focused strategy to advance the BAM project and other highly prospective targets on Junior Lake.

The team, along with external consultants, commenced technical studies in early 2025 to deepen its understanding of BAM’s geological model and to support a carefully targeted 3,500metre drilling program.

Following this work, Landore updated the BAM resource estimate (MRE), a key milestone that helps to derisk the flagship asset and confirm its strong potential. Improved economics, supported by the current gold price environment, significantly enhance the value proposition for Landore.

This update also highlights the substantial associated value within the project’s critical base and platinum group metal deposits at B47 and BNW, aligning closely with global demand for essential minerals.

The geological team is currently leveraging an extensive and systematicaly compiled dataset to refine the geological model and improve the understanding of where other targets and higher-grade mineralisation are concentrated.

These results will be followed up by infill core sampling and drilling as part of the planned expansion program.

The focus is also on strike extensions east of the existing BAM deposit, while continuing to build on the project’s established geological knowledge.

Ontario

The Ontario region of Canada is home to the country’s largest producing gold mine – Agnico Eagle’s Detour Lake, along with some of Canada’s top producing gold mines, both underground and open pits.

One of the World’s top mining jurisdictions

1Red Lake Gold
2Musselwhite Gold
3Rainy River Gold
4Hemlo Gold
5Detour Lake Gold
6Porcupine Gold
7Macassa Gold
8Young-Davidson Gold
9 Greenstone Gold

Top gold-producing mines in Ontario:

MineProd
Oz/pa
OwnershipNotes
1Detour Lake Gold678k ozAgnico EagleO/P
2Greenstone Gold390k oz – AuEquinox GoldOG
3Macassa Gold228k ozAgnico EagleU/G
4Porcupine Gold223k oz – AuNewmontU/G
5Young-Davidson Gold180k oz – AuAlamosUG/OG
6Musselwhite Gold173k ozNewmontUG
7Hemlo Gold141k oz – AuBarrickUG
8Red Lake Gold112k ozEvolution MiningUG
9Rainy River Gold20k oz – Au/Cu/AgNew GoldUG/OG

Proven gold jurisdiction of Ontario

Geology

The BAM Gold Deposit is interpreted as an Archean-aged orogenic gold deposit.

Findings from drilling to-date on the BAM Gold deposit revealed a lithological sequence consisting of leucogabbro and gabbro of the Grassy Pond Sill to the south, metasedimentary rocks of the BAM Sequence in the central portion, to mafic volcanics to the north.

All lithological units have been subjected to variable shearing and deformation, markedly the metasedimentary unit.

The deposit consists of gold mineralisation that is hosted by sheared and altered rocks of the Grassy Pond Sill and the BAM Sequence.

The gold mineralisation is commonly observed in drill core to exist as visible gold that is hosted by very thin, foliation-parallel quartz-rich veinlets, hosted by highly fissile ultramafic sediments of the BAM Sequence, or by foliated rocks of the Grassy Pond Sill.

Bam 1

Logo Dark
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.