PageSourceSearch

https://lakelure.ai/assets/Highway50Construction-Do_Wj_gc.js

js lakelure.ai collected 2026-10-05 13:34:14 UTC 20,951 bytes, 1 lines download raw bytes

1import{a as y,r as v,j as e,L as S,a5 as k,H as C,t as M,w as l,B as i,D as c,M as m,C as s,c as a,v as B,d as P,o as x,S as H,I,h as W,a0 as A,F as G}from"./index-PtGACUVf.js";import{A as D,a as L,b as R,c as F}from"./accordion-C0Ur54yv.js";import{C as h,H as T}from"./hard-hat-CRzC0aeW.js";import{C as d}from"./car-CwtEGtS5.js";import{T as u}from"./triangle-alert-CWbsuvxh.js";import{C as p}from"./circle-check-CH_kw0yO.js";import{P as E}from"./phone-BQCs-BzB.js";import{E as O}from"./external-link-ByXnn-Nj.js";import{U as Z}from"./utensils-BuEONXy9.js";import{S as q}from"./shopping-bag-gZyOBMkQ.js";import{L as J}from"./landmark-DJBQ3_6n.js";import{B as V}from"./bed-CBE_cWO1.js";import{W as Y}from"./wrench-gawjUYu4.js";import"./index-BoiDcb2D.js";const g=[{q:"When does the Highway 50 construction start in Lake Geneva?",a:"Construction is expected to begin as early as February 2027, weather permitting. The project will span two construction seasons through fall 2028."},{q:"Will Main Street be completely closed during construction?",a:"The section from Forest Street to Warren Street will have a full closure in 2027 with a detour route. The downtown core will maintain one lane of traffic in each direction throughout construction."},{q:"Where can I park during the Highway 50 construction?",a:"Main Street parking will not be available during active construction phases. The city is exploring alternative parking solutions including shuttle/trolley service from remote lots. Check back for updates on specific parking locations."},{q:"Are downtown Lake Geneva businesses still open during construction?",a:"Yes! All downtown restaurants, shops, and attractions remain open throughout the construction project. Browse our directory at lakegeneva.ai to find businesses and get directions."},{q:"What is the detour route during construction?",a:"For the western section (Forest Street to Warren Street), the detour uses Forest Street, Dodge Street, and Broad Street. The downtown core maintains two-way traffic with one lane in each direction."},{q:"How long will the Highway 50 construction last?",a:"The project is scheduled for two construction seasons — 2027 and 2028. Each season runs approximately March through November."},{q:"Will the speed limit change after construction?",a:"No. Posted speed limits within the project area (25-45 MPH) will remain the same."}],z={"@context":"https://schema.org","@type":"FAQPage",mainEntity:g.map(n=>
1({"@type":"Question",name:n.q,acceptedAnswer:{"@type":"Answer",text:n.a}}))},U=[{name:"Restaurants",href:"/restaurants",icon:Z,color:"bg-orange-500"},{name:"Shopping",href:"/shopping",icon:q,color:"bg-pink-500"},{name:"Attractions",href:"/attractions",icon:J,color:"bg-blue-500"},{name:"Hotels & Lodging",href:"/lodging",icon:V,color:"bg-emerald-500"},{name:"Services",href:"/services",icon:Y,color:"bg-purple-500"}],Q=[{year:"2027",title:"Forest Street to Cook Street",badge:"Season 1",items:["Pavement replaced from Forest Street to Warren Street, resurfaced from Warren Street to Cook Street","New sanitary sewer and water main installation","FULL CLOSURE from Forest Street to Warren Street with local traffic access only","Detour route: Forest Street → Dodge Street → Broad Street"],alert:"Full closure — Forest St to Warren St"},{year:"2027 & 2028",title:"Wells Street to Hwy 120/Edwards Blvd",badge:"Both Seasons",items:["Road remains open for two-lane, two-way traffic","Work completed in halves","One lane each direction maintained through downtown","NO parking on Main Street during construction","Parking restored after completion with minor modifications for pedestrian crossings"],alert:null},{year:"2028",title:"Cook Street to Wells Street",badge:"Season 2",items:["Road remains open for two-lane, two-way traffic","Work completed in halves","One lane each direction maintained through downtown","NO parking on Main Street during construction"],alert:null},{year:"2028",title:"Hwy 120/Edwards Blvd to Grand Geneva Way",badge:"Season 2",items:["Pavement resurfaced","Road open with single lane closures during milling/paving","Some night work possible","Sidewalk construction under shoulder closure","Intersection improvements at Highway 120/Edwards Boulevard"],alert:null}],X=["Pavement replacement and resurfacing across 2.5 miles","Traffic signal replacement at 6 intersections: Cook St, Wells St, Broad St, Hwy 120/Edwards Blvd, Center St, and US Hwy 12 Interchange","ADA-compliant curb ramp reconstruction","New 10-foot wide shared-use path (north side, Curtis St to Edwards Blvd)","Rectangular Rapid Flashing Beacons (RRFB) at 7 side roads","Drainage improvements","New pavement markings","Speed limits remain unchanged (25–45 MPH within project limits)"],$=[{date:"Wednesday, June 10, 2026",time:"6:00 – 7:00 PM"},{date:"Wednesday, September 16, 2026",time:"6:00 – 7:00 PM"},{date:"Wednesday, December 9, 2026",time:"6:00 – 7:00 PM"}];function xe(){const{city:n,isLoading:b}=y(),[o,j]=v.useState("");if(b)return e.jsx("div",{className:"min-h-screen flex items-center justify-center bg-background",children:e.jsx(S,{className:"h-8 w-8 animate-spin text-primary"})});if(!n||n.slug!=="lake-geneva")return e.jsx(k,{to:"/",replace:!0});const f=t=>{t.preventDefault(),o.trim()&&(window.location.href=`/directory?q=${encodeURIComponent(o)}`)};return e.jsxs("div",{className:"min-h-screen bg-background",children:[e.jsxs(C,{children:[e.jsx("title",{children:"Highway 50 Construction Lake Geneva | Main Street Project 2027-2028"}),e.jsx("meta",{name:"description",content:"Everything you need to know about the Highway 50 / Main Street reconstruction in Lake Geneva, WI. Construction timeline, detour routes, parking alternatives, and how to find downtown businesses during the 2027-2028 project."}),e.jsx("link",{rel:"canonical",href:"https://lakegeneva.ai/highway-50-construction"}),e.jsx("meta",{property:"og:title",content:"Highway 50 Construction Lake Geneva | Main Street Project 2027-2028"}),e.jsx("meta",{property:"og:description",content:"Everything you need to know about the Highway 50 / Main Street reconstruction in Lake Geneva, WI. Construction timeline, detour routes, and parking alternatives."}),e.jsx("meta",{property:"og:url",content:"https://lakegeneva.ai/highway-50-construction"}),e.jsx("meta",{property:"og:type",content:"website"}),e.jsx("script",{type:"application/ld+json",children:JSON.stringify(z)})]}),e.jsx(M,{}),e.jsxs("section",{className:"relative bg-gradient-to-br from-amber-600 via-amber-700 to-orange-800 text-white",children:[e.jsx("div",{className:"absolute inset-0 bg-[url('data:image/svg+xml;base64,PHN2ZyB3aWR0aD0iNDAiIGhlaWdodD0iNDAiIHhtbG5zPSJodHRwOi8vd3d3LnczLm9yZy8yMDAwL3N2ZyI+PGRlZnM+PHBhdHRlcm4gaWQ9ImEiIHBhdHRlcm5Vbml0cz0idXNlclNwYWNlT25Vc2UiIHdpZHRoPSI0MCIgaGVpZ2h0PSI0MCI+PHBhdGggZD0iTTAgMGg0MHY0MEgweiIgZmlsbD0ibm9uZSIvPjxwYXRoIGQ9Ik0wIDBoMjB2MjBIMHoiIGZpbGw9InJnYmEoMCwwLDAsMC4wNSkiLz48cGF0aCBkPSJNMjAgMjBoMjB2MjBIMjB6IiBmaWxsPSJyZ2JhKDAsMCwwLDAuMDUpIi8+PC9wYXR0ZXJuPjwvZGVmcz48cmVjdCBmaWxsPSJ1cmwoI2EpIiB3aWR0aD0iMTAwJSIgaGVpZ2h0PSIxMDAlIi8+PC9zdmc+')] opacity-30"}),e.jsxs("div",{className:"container mx-auto px-4 py-16 md:py-24 relative",children:[e.jsxs("div",{className:"flex items-center gap-3 mb-4",children:[e.jsx("div",{className:"p-2 bg-white/20 rounded-lg",children:e.jsx(h,{className:"h-8 w-8"})}),e.jsx(l,{className:"bg-white/20 text-white border-white/30 text-sm",children:"2027–2028 Project"})]}),e.jsxs("h1",{className:"text-4xl md:text-5xl lg:text-6xl font-display font-bold mb-4 leading-tight",children:["Highway 50 / Main Street",e.jsx("br",{}),"Construction"]}),e.jsx("p",{className:"text-lg md:text-xl text-white/90 max-w-2xl mb-8",children:"What You Need to Know About Lake Geneva's 2027–2028 Road Reconstruction Project"}),e.jsxs("div",{className:"flex flex-wrap gap-3",children:[e.jsxs(i,{size:"lg",className:"bg-white text-amber-800 hover:bg-white/90 font-semibold",onClick:()=>{var t;return(t=document.getElementById("timeline"))==null?void 0:t.scrollIntoView({behavior:"smooth"})},children:[e.jsx(c,{className:"mr-2 h-5 w-5"})," View Timeline"]}),e.jsxs(i,{size:"lg",variant:"outline",className:"border-2 border-white text-white hover:bg-white hover:text-amber-800",onClick:()=>{var t;return(t=document.getElementById("businesses-open"))==null?void 0:t.scrollIntoView({behavior:"smooth"})},children:[e.jsx(m,{className:"mr-2 h-5 w-5"})," Find Open Businesses"]})]})]})]}),e.jsx("section",{className:"container mx-auto px-4 py-12 md:py-16",children:e.jsxs("div",{className:"max-w-4xl mx-auto",children:[e.jsx("h2",{className:"text-3xl font-display font-bold mb-6",children:"Project Overview"}),e.jsxs("div",{className:"prose prose-lg max-w-none text-muted-foreground",children:[e.jsxs("p",{children:["The Wisconsin Department of Transportation is reconstructing approximately ",e.jsx("strong",{className:"text-foreground",children:"2.5 miles of Wisconsin Highway 50 (Main Street)"})," from Forest Street to Grand Geneva Way. The project includes pavement replacement, new traffic signals at 6 intersections, ADA curb ramp reconstruction, drainage improvements, and a new shared-use path between Curtis Street and Edwards Boulevard."]}),e.jsxs("p",{children:["Construction spans ",e.jsx("strong",{className:"text-foreground",children:"two seasons: 2027 and 2028"})," (approximately March through November each year). Highway 50 carries approximately 16,600 vehicles per day."]})]}),e.jsxs("div",{className:"grid grid-cols-1 sm:grid-cols-3 gap-4 mt-8",children:[e.jsx(s,{className:"border-amber-200 bg-amber-50 dark:bg-amber-950/20 dark:border-amber-800",children:e.jsxs(a,{className:"p-5 text-center",children:[e.jsx(B,{className:"h-8 w-8 text-amber-600 mx-auto mb-2"}),e.jsx("p",{className:"text-2xl font-bold text-foreground",children:"2 Seasons"}),e.jsx("p",{className:"text-sm text-muted-foreground",children:"2027 & 2028"})]})}),e.jsx(s,{className:"border-amber-200 bg-amber-50 dark:bg-amber-950/20 dark:border-amber-800",children:e.jsxs(a,{className:"p-5 text-center",children:[e.jsx(h,{className:"h-8 w-8 text-amber-600 mx-auto mb-2"}),e.jsx("p",{className:"text-2xl font-bold text-foreground",children:"2.5 Miles"}),e.jsx("p",{className:"text-sm text-muted-foreground",children:"Forest St to Grand Geneva Way"})]})}),e.jsx(s,{className:"border-amber-200 bg-amber-50 dark:bg-amber-950/20 dark:border-amber-800",children:e.jsxs(a,{className:"p-5 text-center",children:[e.jsx(d,{className:"h-8 w-8 text-amber-600 mx-auto mb-2"}),e.jsx("p",{className:"text-2xl font-bold text-foreground",children:"16,600"}),e.jsx("p",{className:"text-sm text-muted-foreground",children:"Vehicles per day"})]})})]}),e.jsx(s,{className:"mt-6 border-blue-200 bg-blue-50 dark:bg-blue-950/20 dark:border-blue-800",children:e.jsxs(a,{className:"p-5 flex items-start gap-3",children:[e.jsx(c,{className:"h-5 w-5 text-blue-600 mt-0.5 shrink-0"}),e.jsxs("p",{className:"text-sm text-muted-foreground",children:[e.jsx("strong",{className:"text-foreground",children:"Bidding expected October 2026"}),", awarded December 2026, construction may begin as early as February 2027."]})]})})]})}),e.jsx("section",{id:"timeline",className:"bg-muted/50 py-12 md:py-16",children:e.jsx("div",{className:"container mx-auto px-4",children:e.jsxs("div",{className:"max-w-4xl mx-auto",children:[e.jsx("h2",{className:"text-3xl font-display font-bold mb-2",children:"Year-by-Year Timeline"}),e.jsx("p",{className:"text-muted-foreground mb-8",children:"Phased construction to minimise disruption"}),e.jsx("div",{className:"space-y-6",children:Q.map((t,r)=>e.jsxs(s,{className:"overflow-hidden",children:[e.jsxs("div",{className:"flex items-center gap-3 px-6 py-4 bg-muted/60 border-b",children:[e.jsx(l,{variant:"secondary",className:"font-mono",children:t.badge}),e.jsx("div",{children:e.jsxs("p",{className:"font-bold text-foreground",children:[t.year," — ",t.title]})})]}),e.jsxs(a,{className:"p-6",children:[t.alert&&e.jsxs("div",{className:"flex items-center gap-2 p-3 mb-4 bg-red-50 dark:bg-red-950/20 border border-red-200 dark:border-red-800 rounded-lg text-red-700 dark:text-red-400 text-sm",children:[e.jsx(u,{className:"h-4 w-4 shrink-0"}),e.jsx("span",{className:"font-semibold",children:t.alert})]}),e.jsx("ul",{className:"space-y-2",children:t.items.map((w,N)=>e.jsxs("li",{className:"flex items-start gap-2 text-sm text-muted-foreground",children:[e.jsx(P,{className:"h-4 w-4 text-amber-500 mt-0.5 shrink-0"}),e.jsx("span",{children:w})]},N))})]})]},r))})]})})}),e.jsx("section",{className:"container mx-auto px-4 py-12 md:py-16",children:e.jsxs("div",{className:"max-w-4xl mx-auto",children:[e.jsx("h2",{className:"text-3xl font-display font-bold mb-6",children:"What's Being Improved"}),e.jsx("div",{className:"grid grid-cols-1 md:grid-cols-2 gap-3",children:X.map((t,r)=>e.jsxs("div",{className:"flex items-start gap-3 p-4 rounded-lg bg-muted/50",children:[e.jsx(p,{className:"h-5 w-5 text-emerald-500 mt-0.5 shrink-0"}),e.jsx("span",{className:"text-sm text-muted-foreground",children:t})]},r))})]})}),e.jsx("section",{className:"bg-muted/50 py-12 md:py-16",children:e.jsx("div",{className:"container mx-auto px-4",children:e.jsxs("div",{className:"max-w-4xl mx-auto",children:[e.jsxs("h2",{className:"text-3xl font-display font-bold mb-6 flex items-center gap-3",children:[e.jsx(d,{className:"h-8 w-8 text-primary"}
1),"Parking & Getting Around"]}),e.jsxs("div",{className:"space-y-4",children:[e.jsx(s,{children:e.jsxs(a,{className:"p-5 flex items-start gap-3",children:[e.jsx(u,{className:"h-5 w-5 text-amber-500 mt-0.5 shrink-0"}),e.jsxs("div",{children:[e.jsx("p",{className:"font-semibold text-foreground mb-1",children:"Main Street Parking Unavailable"}),e.jsx("p",{className:"text-sm text-muted-foreground",children:"Main Street parking will NOT be available during active construction phases."})]})]})}),e.jsx(s,{children:e.jsxs(a,{className:"p-5 flex items-start gap-3",children:[e.jsx(p,{className:"h-5 w-5 text-emerald-500 mt-0.5 shrink-0"}),e.jsxs("div",{children:[e.jsx("p",{className:"font-semibold text-foreground mb-1",children:"Traffic Maintained Downtown"}),e.jsx("p",{className:"text-sm text-muted-foreground",children:"One lane of traffic in each direction will be maintained through the downtown core."})]})]})}),e.jsx(s,{children:e.jsxs(a,{className:"p-5 flex items-start gap-3",children:[e.jsx(m,{className:"h-5 w-5 text-blue-500 mt-0.5 shrink-0"}),e.jsxs("div",{children:[e.jsx("p",{className:"font-semibold text-foreground mb-1",children:"Detour Route (Western Section)"}),e.jsx("p",{className:"text-sm text-muted-foreground",children:"Forest Street → Dodge Street → Broad Street"})]})]})}),e.jsx(s,{children:e.jsxs(a,{className:"p-5 flex items-start gap-3",children:[e.jsx(d,{className:"h-5 w-5 text-purple-500 mt-0.5 shrink-0"}),e.jsxs("div",{children:[e.jsx("p",{className:"font-semibold text-foreground mb-1",children:"Shuttle/Trolley Service"}),e.jsx("p",{className:"text-sm text-muted-foreground",children:"The city is considering trolley/shuttle service to help visitors reach downtown businesses during construction."})]})]})})]})]})})}),e.jsx("section",{id:"businesses-open",className:"py-12 md:py-20",children:e.jsx("div",{className:"container mx-auto px-4",children:e.jsxs("div",{className:"max-w-5xl mx-auto text-center",children:[e.jsx(l,{className:"bg-emerald-100 text-emerald-700 dark:bg-emerald-900/30 dark:text-emerald-400 mb-4 text-sm",children:"Open for Business"}),e.jsx("h2",{className:"text-3xl md:text-4xl font-display font-bold mb-4",children:"Downtown Lake Geneva Is Open for Business"}),e.jsx("p",{className:"text-lg text-muted-foreground max-w-2xl mx-auto mb-10",children:"Construction may change how you get here, but every restaurant, shop, and attraction is open and ready to welcome you."}),e.jsx("div",{className:"grid grid-cols-2 sm:grid-cols-3 md:grid-cols-5 gap-4 mb-10",children:U.map(t=>e.jsxs(x,{to:t.href,className:"group flex flex-col items-center gap-3 p-5 rounded-xl bg-card border border-border hover:border-primary/30 hover:shadow-lg transition-all",children:[e.jsx("div",{className:`p-3 rounded-full ${t.color} text-white group-hover:scale-110 transition-transform`,children:e.jsx(t.icon,{className:"h-6 w-6"})}),e.jsx("span",{className:"text-sm font-semibold text-foreground",children:t.name})]},t.name))}),e.jsx(s,{className:"max-w-xl mx-auto border-primary/20",children:e.jsxs(a,{className:"p-6",children:[e.jsx("p",{className:"text-sm font-semibold text-foreground mb-3",children:"Find any business in Lake Geneva"}),e.jsxs("form",{onSubmit:f,className:"flex gap-2",children:[e.jsxs("div",{className:"relative flex-1",children:[e.jsx(H,{className:"absolute left-3 top-1/2 -translate-y-1/2 h-4 w-4 text-muted-foreground"}),e.jsx(I,{placeholder:"Search businesses...",value:o,onChange:t=>j(t.target.value),className:"pl-10"})]}),e.jsx(i,{type:"submit",variant:"accent",children:"Search"})]})]})})]})})}),e.jsx("section",{className:"bg-muted/50 py-12 md:py-16",children:e.jsx("div",{className:"container mx-auto px-4",children:e.jsxs("div",{className:"max-w-4xl mx-auto",children:[e.jsx("h2",{className:"text-3xl font-display font-bold mb-6",children:"Public Information Meetings"}),e.jsxs("p",{className:"text-muted-foreground mb-6",children:["All meetings held at ",e.jsx("strong",{className:"text-foreground",children:"Lake Geneva City Hall"}),", 626 Geneva Street, 6:00 – 7:00 PM"]}),e.jsx("div",{className:"grid grid-cols-1 sm:grid-cols-3 gap-4 mb-8",children:$.map((t,r)=>e.jsx(s,{children:e.jsxs(a,{className:"p-5 text-center",children:[e.jsx(c,{className:"h-6 w-6 text-primary mx-auto mb-2"}),e.jsx("p",{className:"font-semibold text-foreground text-sm",children:t.date}),e.jsx("p",{className:"text-xs text-muted-foreground",children:t.time})]})},r))}),e.jsx(s,{className:"border-primary/20",children:e.jsxs(a,{className:"p-5",children:[e.jsx("p",{className:"font-semibold text-foreground mb-2",children:"Contact: Chris Bennett, Assistant City Administrator"}),e.jsxs("div",{className:"flex flex-col sm:flex-row gap-4",children:[e.jsxs("a",{href:"mailto:[email protected]",className:"flex items-center gap-2 text-sm text-primary hover:underline",children:[e.jsx(W,{className:"h-4 w-4"})," [email protected]"]}),e.jsxs("a",{href:"tel:2622489465",className:"flex items-center gap-2 text-sm text-primary hover:underline",children:[e.jsx(E,{className:"h-4 w-4"})," (262) 248-9465"]})]})]})})]})})}),e.jsx("section",{className:"container mx-auto px-4 py-12 md:py-16",children:e.jsxs("div",{className:"max-w-4xl mx-auto",children:[e.jsx("h2",{className:"text-3xl font-display font-bold mb-6",children:"Official Resources"}),e.jsx("div",{className:"space-y-3",children:[{label:"City of Lake Geneva Hwy 50 Construction Page",url:"https://www.cityoflakegeneva.gov/349/Hwy-50-Construction"},{label:"Wisconsin DOT Project Page",url:"https://wisconsindot.gov/Pages/projects/by-region/se/50geneva/default.aspx"},{label:"Wisconsin DOT Small Business Help Guide",url:"https://wisconsindot.gov/Pages/projects/in-together/default.aspx"}].map(t=>e.jsxs("a",{href:t.url,target:"_blank",rel:"noopener noreferrer",className:"flex items-center justify-between p-4 rounded-lg border border-border hover:border-primary/30 hover:bg-muted/50 transition-all group",children:[e.jsx("span",{className:"text-sm font-medium text-foreground group-hover:text-primary",children:t.label}),e.jsx(O,{className:"h-4 w-4 text-muted-foreground group-hover:text-primary shrink-0"})]},t.url))})]})}),e.jsx("section",{className:"bg-muted/50 py-12 md:py-16",children:e.jsx("div",{className:"container mx-auto px-4",children:e.jsxs("div",{className:"max-w-4xl mx-auto",children:[e.jsx("h2",{className:"text-3xl font-display font-bold mb-6",children:"Frequently Asked Questions"}),e.jsx(D,{type:"single",collapsible:!0,className:"w-full",children:g.map((t,r)=>e.jsxs(L,{value:`faq-${r}`,children:[e.jsx(R,{className:"text-left hover:no-underline text-foreground",children:t.q}),e.jsx(F,{className:"text-muted-foreground",children:t.a})]},r))})]})})}),e.jsx("section",{className:"py-12 md:py-16",children:e.jsx("div",{className:"container mx-auto px-4",children:e.jsxs("div",{className:"max-w-3xl mx-auto text-center",children:[e.jsx("div",{className:"p-2 bg-amber-100 dar
1k:bg-amber-900/30 rounded-full w-fit mx-auto mb-4",children:e.jsx(T,{className:"h-8 w-8 text-amber-600"})}),e.jsx("h2",{className:"text-3xl font-display font-bold mb-4",children:"Own a Business on Main Street?"}),e.jsx("p",{className:"text-lg text-muted-foreground mb-6",children:"Make sure visitors can find you during construction. Claim your listing on LakeGeneva.ai to update your hours, parking directions, and contact info."}),e.jsx(i,{size:"lg",variant:"accent",asChild:!0,children:e.jsxs(x,{to:"/pricing",children:["Claim Your Business ",e.jsx(A,{className:"ml-2 h-5 w-5"})]})})]})})}),e.jsx(G,{cityName:n.name,citySlug:n.slug})]})}export{xe as default};

Line numbers count LF bytes from the start of the resource, as the search results do. Vendor segments are library code the classifier recognised; they are stored but not indexed. Bytes are shown as Latin1 characters, one per byte.