PageSourceSearch

https://www.ronigroup.ca/js/projects-new.js?v=1.7

js ronigroup.ca collected 2026-10-09 23:24:11 UTC 59,082 bytes, 1,872 lines download raw bytes

1const projects= {
2    'trillium':{
3        divisions:{
4            roni: [
5                //'excavating'
6            ],
7            orin: [
8                // 'demolition',
9                'civil',
10                // 'landscaping',
11            ],
12            iron:[
13                'shoring',
14                // 'forming',
15                // 'waterproofing',
16            ]
17        },
18        // url:"/orin/demolition",
19        title:'Trillium Long Term Care Facility',
20        loc: ' Mississauga, ON',
21        desc: {
22            //excavating:'Spoil removal of structural casissons, loading, hauling and disposal off site, Asphalt removal and disposal off site, bulk excavation, detailed excavation.',
23            civil:'Site Servicing, Supply and installation of Sanitary Services, Storm Services, Watermain services. Remove & replace existing 1500mm manhole on North Sheridan Way including new drop structure. Temporary restoration of existing asphalt,  Permanent restoration of existing asphalt',
24            shoring:'Drilling over 300 structural caissons with 1500m diameter including supply and placing concrete and rebar cages',
25        },
26        //date:'2021',
27        thumb: '/img/projects/trillium-long-term/1.jpg',
28        gallery:{
29            //excavating:[
30            //    '/img/projects/trillium-long-term/excavating-1.jpg',
31            //],
32            civil:[
33                '/img/projects/trillium-long-term/civil-1.jpg',
34                '/img/projects/trillium-long-term/civil-2.jpg',
35            ],
36            shoring:[
37                '/img/projects/trillium-long-term/shoring-1.jpg',
38                '/img/projects/trillium-long-term/shoring-2.jpg',
39            ],
40        }
41    },
42	'35-Patterson':{
43        divisions:{
44            roni: [
45                //'excavating'
46            ],
47            orin: [
48                // 'demolition',
49                //'civil',
50                // 'landscaping',
51            ],
52            iron:[
53                'shoring',
54                // 'forming',
55                // 'waterproofing',
56            ]
57        },
58        // url:"/orin/demolition",
59        title:'Kingsley Square',
60        loc: 'Newmarket, ON',
61        desc: {
62            //excavating:'Second Project Excavating Description',
63            //civil:'Second Project Civil Description',
64            shoring:'Design/Build - 140,000 sf below grade, 280,000 sf above grade',
65        },
66        //date:'2021',
67        thumb: '/img/projects/Iron-shoring/35-Patterson/1.png',
68        gallery:{
69            shoring:[
70                '/img/projects/Iron-shoring/35-Patterson/1.png',
71            ],
72        }
73    },
74	'340-Mill-Rd':{
75        divisions:{
76            roni: [
77                //'excavating'
78            ],
79            orin: [
80                'demolition',
81                //'civil',
82                // 'landscaping',
83            ],
84            iron:[
85                'shoring',
86                // 'forming',
87                // 'waterproofing',
88            ]
89        },
90        // url:"/orin/demolition",
91        title:'340 Mill Rd',
92        loc: 'Etobicoke, ON',
93        desc: {
94            shoring:'Vertical Drilling, lagging, tieback',
95            demolition:'Removal of existing building parking structure, concrete slabs, footing and foundations',
96        },
97        //date:'2021',
98        thumb: '/img/projects/Iron-shoring/340-Mill-Rd/1.png',
99        gallery:{
100            shoring:[
101                '/img/projects/Iron-shoring/340-Mill-Rd/1.png',
102            ],
103			demolition:[
104                '/img/projects/Orin-Demolition/340-Mill-Rd/340-Mill-Rd.jpg',
105            ],
106        }
107    },
108	'844-Don-Mills':{
109        divisions:{
110            roni: [
111                //'excavating'
112            ],
113            orin: [
114                // 'demolition',
115                //'civil',
116                // 'landscaping',
117            ],
118            iron:[
119                'shoring',
120                // 'forming',
121                // 'waterproofing',
122            ]
123        },
124        // url:"/orin/demolition",
125        title:'Crosstown',
126        loc: 'Toronto, ON',
127        desc: {
128            //excavating:'Second Project Excavating Description',
129            //civil:'Second Project Civil Description',
130            shoring:'Drilling solder piles and caisson of 5 level underground parking, includes lagging, tiebacks, corner bracing',
131        },
132        //date:'2021',
133        thumb: '/img/projects/Iron-shoring/844-Don-Mills/1.png',
134        gallery:{
135            shoring:[
136                '/img/projects/Iron-shoring/844-Don-Mills/1.png',
137            ],
138        }
139    },
140	'300-Bloor':{
141        divisions:{
142            roni: [
143                'excavating'
144            ],
145            orin: [
146                'demolition',
147                //'civil',
148                // 'landscaping',
149            ],
150            iron:[
151                'shoring',
152                // 'forming',
153                // 'waterproofing',
154            ]
155        },
156        // url:"/orin/demolition",
157        title:'Cielo Condos',
158        loc: 'Toronto, ON',
159        desc: {
160            shoring:'Vertical drilling, structural caissons, 4 rows of tiebacks, excavation above TTC Tunnel. ',
161            demolition:'Structural Demolition, Retention System, Heritage, Salvage, Abatement of the united church. ',
162			excavating:'Bulk and Detailed Excavation above TTC Tunnel down to P4 level',
163        },
164        //date:'2021',
165        thumb: '/img/projects/Iron-shoring/300-Bloor/1.png',
166        gallery:{
167            shoring:[
168                '/img/projects/Iron-shoring/300-Bloor/1.png',
169				'/img/projects/Iron-shoring/300-Bloor/2.png',
170            ],
171			demolition:[
172                '/img/projects/Orin-Demolition/300-Bloor/300-bloor.jpg',
173            ],
174			excavating:[
175                '/img/projects/Roni-Excavating/300-Bloor/300-bloor.jpg',
176            ],
177        }
178    },
179	'500-Wilson':{
180        divisions:{
181            roni: [
182                //'excavating'
183            ],
184            orin: [
185                'demolition',
186                // 'civil',
187                // 'landscaping',
188            ],
189            iron:[
190                'shoring',
191                // 'forming',
192                // 'waterproofing',
193            ]
194        },
195        // url:"/orin/demolition",
196        title:'Nørdic Condos',
197        loc: 'North York, ON',
198        desc: {
199            shoring:'Installation of interlocking caisson wall and soldier piles for one level underground parking ',
200            demolition:'Demolition and abatement of 5-storey commercial building, two 3-storey apartment buildings with basement, total of 60 units, decommissioning of elevators and AC units and removal of all debris off site and proper disposal of spoils generated from abatement work.',
201        },
202        //date:'2021',
203        thumb: '/img/projects/Iron-shoring/500-Wilson/1.png',
204        gallery:{
205            shoring:[
206                '/img/projects/Iron-shoring/500-Wilson/1.png',
207            ],
208			demolition:[
209                '/img/projects/Orin-Demolition/nordic-condos/nordic-condos.jpg',
210            ],
211        }
212    },
213	'Humber-River-Hospital':{
214        divisions:{
215            roni: [
216                //'excavating'
217            ],
218            orin: [
219                // 'demolition',
220                //'civil',
221                // 'landscaping',
222            ],
223            iron:[
224                'shoring',
225                // 'forming',
226                // 'waterproofing',
227            ]
228        },
229        // url:"/orin/demolition",
230        title:'Humber  River Hospital',
231        loc: 'North York, ON',
232        desc: {
233            //excavating:'Second Project Excavating Description',
234            //civil:'Second Project Civil Description',
235            shoring:'Drilling over 140 structural caissons with 1800mm diameter including supply & placing concrete & rebar cages',
236        },
237        //date:'2021',
238        thumb: '/img/projects/Iron-shoring/Humber-River-Hospital/1.png',
239        gallery:{
240            shoring:[
241                '/img/projects/Iron-shoring/Humber-River-Hospital/1.png',
242            ],
243        }
244    },
245	'908-St-Clair-W':{
246        divisions:{
247            roni: [
248                'excavating'
249            ],
250            orin: [
251                // 'demolition',
252                //'civil',
253                // 'landscaping',
254            ],
255            iron:[
256                'shoring',
257                // 'forming',
258                // 'waterproofing',
259            ]
260        },
261        // url:"/orin/demolition",
262        title:'908 St Clair',
263        loc: 'Toronto, ON',
264        desc: {
265            excavating:'Bulk Excavation',
266            //civil:'Second Project Civil Description',
267            shoring:'Vertical Drilling, Tieback, strats/corner bracing/walers, wooder rackers, demolition, additional support at grade for excavator location when double handling bottom of excavating soils',
268        },
269        //date:'2021',
270        thumb: '/img/projects/Iron-shoring/908-Clair/1.png',
271        gallery:{
272            shoring:[
273                '/img/projects/Iron-shoring/908-Clair/1.png',
274            ],
275			excavating:[
276                '/img/projects/Roni-Excavating/908-St-Clair/908-St-Clair.jpg',
277            ],
278        }
279    },
280	'Buck-Bin':{
281        divisions:{
282            roni: [
283                //'excavating'
284            ],
285            orin: [
286                // 'demolition',
287                //'civil',
288                // 'landscaping',
289            ],
290            iron:[
291                'shoring',
292                // 'forming',
293                // 'waterproofing',
294            ]
295        },
296        // url:"/orin/demolition",
297        //title:'Scarborough Muck Bin',
298        title:'Tunnel Soil Disposal Muck Bin at Scarborough LRT',
299        loc: 'Scarborough, ON',
300        desc: {
301            //excavating:'Second Project Excavating Description',
302            //civil:'Second Project Civil Description',
303            shoring:'Caisson cut-off wall shoring system (3m cut) designed in cantilever for holding TBM cuttings. 82 secant piles and 240 filler piles. ',
304        },
305        //date:'2021',
306        thumb: '/img/projects/Iron-shoring/Buck-Bin/1.png',
307        gallery:{
308            shoring:[
309                '/img/projects/Iron-shoring/Buck-Bin/1.png',
310				'/img/projects/Iron-shoring/Buck-Bin/2.png',
311            ],
312        }
313    },
314	'Sheppard-Ave-W':{
315        divisions:{
316            roni: [
317                //'excavating'
318            ],
319            orin: [
320                // 'demolition',
321                //'civil',
322                // 'landscaping',
323            ],
324            iron:[
325                'shoring',
326                // 'forming',
327                // 'waterproofing',
328            ]
329        },
330        // url:"/orin/demolition",
331        title:'NorthCore Condos',
332        loc: 'Toronto, ON',
333        desc: {
334            //excavating:'Second Project Excavating Description',
335            //civil:'Second Project Civil Description',
336            shoring:'Vertical Drilling, S&I tiebacks, walers, raker, lagging, winter heat, design platform, top waler for excavator, vertical posts',
337        },
338        //date:'2021',
339        thumb: '/img/projects/Iron-shoring/Sheppard-Ave-W/1.png',
340        gallery:{
341            shoring:[
342                '/img/projects/Iron-shoring/Sheppard-Ave-W/1.png',
343            ],
344        }
345    },
346	'278-Hillmount':{
347        divisions:{
348            roni: [
349                //'excavating'
350            ],
351            orin: [
352                // 'demolition',
353                //'civil',
354                // 'landscaping',
355            ],
356            iron:[
357                'shoring',
358                // 'forming',
359                // 'waterproofing',
360            ]
361        },
362        // url:"/orin/demolition",
363        title:'The Dylan',
364        loc: 'North York, ON',
365        desc: {
366            //excavating:'Second Project Excavating Description',
367            //civil:'Second Project Civil Description',
368            shoring:'shoring system consisting of all secant piles, filler piles, soldier piles, tiebacks, lagging and corner braces, and structural caissons',
369        },
370        //date:'2021',
371        thumb: '/img/projects/Iron-shoring/278-Hillmount/1.png',
372        gallery:{
373            shoring:[
374                '/img/projects/Iron-shoring/278-Hillmount/1.png',
375            ],
376        }
377    },
378	'McGibbon':{
379        divisions:{
380            roni: [
381                //'excavating'
382            ],
383            orin: [
384                // 'demolition',
385                //'civil',
386                // 'landscaping',
387            ],
388            iron:[
389                'shoring',
390                // 'forming',
391                // 'waterproofing',
392            ]
393        },
394        // url:"/orin/demolition",
395        title:'McGibbon on Main',
396        loc: 'Halton Hills, ON',
397        desc: {
398            //excavating:'Second Project Excavating Description',
399            //civil:'Second Project Civil Description',
400            shoring:'Design and construct shoring platform. Vertical drilling, tieback, lagging, shotcrete, vertical for guardrails, destressing tiebacks.',
401        },
402        //date:'2021',
403        thumb: '/img/projects/Iron-shoring/McGibbon/1.png',
404        gallery:{
405            shoring:[
406                '/img/projects/Iron-shoring/McGibbon/1.png',
407            ],
408        }
409    },
410	'TTC-Russel-Carhouse':{
411        divisions:{
412            roni: [
413                //'excavating'
414            ],
415            orin: [
416                // 'demolition',
417                //'civil',
418                // 'landscaping',
419            ],
420            iron:[
421                'shoring',
422                // 'forming',
423                // 'waterproofing',
424            ]
425        },
426        // url:"/orin/demolition",
427        title:'TTC Russel Carhouse',
428        loc: 'Toronto, ON',
429        desc: {
430            //excavating:'Second Project Excavating Description',
431            //civil:'Second Project Civil Description',
432            shoring:'Supply and install 7 soldier piles, 189 secant piles and 532 filler files for soldier pile, lagging and caisson wall shoring system.',
433        },
434        //date:'2021',
435        thumb: '/img/projects/Iron-shoring/TTC-Russell-Carhouse/1.png',
436        gallery:{
437            shoring:[
438                '/img/projects/Iron-shoring/TTC-Russell-Carhouse/1.png',
439            ],
440        }
441    },
442	
443	'Andrew-McCandless-Park':{
444        divisions:{
445            roni: [
446                //'excavating'
447            ],
448            orin: [
449                //'demolition',
450                //'civil',
451                'landscaping',
452            ],
453            iron:[
454                //'shoring',
455                // 'forming',
456                // 'waterproofing',
457            ]
458        },
459        // url:"/orin/demolition",
460        title:'Andrew McCandless Park',
461        loc: 'Brampton, ON',
462        desc: {
463			landscaping: 'Development of 23-acre park including site clearing and grubbing, sediment c
463ontrol including construction of sediment basins, silt fence, rock check dams, ditches,  wet parkland features, strip topsoil, screen, and prepare onsite sports mix, built 2,500 sq. ft washroom building. ',
464            //excavating:'Second Project Excavating Description',
465            //civil:'Second Project Civil Description',
466            //shoring:'Supply and install 7 soldier piles, 189 secant piles and 532 filler files for soldier pile, lagging and caisson wall shoring system.',
467        },
468        //date:'2021',
469        thumb: '/img/projects/Orin-Landscaping/Andrew-McCandless-Park/Andrew_McCandless.jpg',
470        gallery:{
471            landscaping:[
472                '/img/projects/Orin-Landscaping/Andrew-McCandless-Park/Andrew_McCandless.jpg',
473                '/img/projects/Orin-Landscaping/Andrew-McCandless-Park/Andrew_McCandless_2.jpg',
474            ],
475        }
476    },
477	'Azura-Park':{
478        divisions:{
479            roni: [
480                //'excavating'
481            ],
482            orin: [
483                //'demolition',
484                //'civil',
485                'landscaping',
486            ],
487            iron:[
488                //'shoring',
489                // 'forming',
490                // 'waterproofing',
491            ]
492        },
493        // url:"/orin/demolition",
494        title:'Azura Park',
495        loc: '15-21 Holmes',
496        desc: {
497			landscaping: 'Complete build of parkland landscape work including site prep, site servicing, hardscape, shade structure, site furnishings, playground, soft landscaping, lighting and electrical, irrigation. ',
498            //excavating:'Second Project Excavating Description',
499            //civil:'Second Project Civil Description',
500            //shoring:'Supply and install 7 soldier piles, 189 secant piles and 532 filler files for soldier pile, lagging and caisson wall shoring system.',
501        },
502        //date:'2021',
503        thumb: '/img/projects/Orin-Landscaping/Azura-Park/Azura_Park.jpg',
504        gallery:{
505            landscaping:[
506                '/img/projects/Orin-Landscaping/Azura-Park/Azura_Park.jpg',
507                '/img/projects/Orin-Landscaping/Azura-Park/Azura_Park_2.jpg',
508                '/img/projects/Orin-Landscaping/Azura-Park/Azura_Park_3.jpg',
509            ],
510        }
511    },
512	'Confederation-Beach-Park':{
513        divisions:{
514            roni: [
515                //'excavating'
516            ],
517            orin: [
518                //'demolition',
519                //'civil',
520                'landscaping',
521            ],
522            iron:[
523                //'shoring',
524                // 'forming',
525                // 'waterproofing',
526            ]
527        },
528        // url:"/orin/demolition",
529        title:'Confederation Beach Park',
530        loc: 'Hamilton, ON',
531        desc: {
532			landscaping: 'Work completed in 2 stages, Stage 1  include site preparation, demolition and removals; excavation, rough grading; site servicing;
532 access road, erosion and sediment control, sports fields and Pickleball courts, and parking lot preparation. Stage 2 include the parking lot storm sewer and bioretention swale system that discharges into Stoney Creek Pond via concrete headwall, as well as parking lot finishing.',
533            //excavating:'Second Project Excavating Description',
534            //civil:'Second Project Civil Description',
535            //shoring:'Supply and install 7 soldier piles, 189 secant piles and 532 filler files for soldier pile, lagging and caisson wall shoring system.',
536        },
537        //date:'2021',
538        thumb: '/img/projects/Orin-Landscaping/Confederation-Beach-Park/Confederation_Beach_Park.jpg',
539        gallery:{
540            landscaping:[
541                '/img/projects/Orin-Landscaping/Confederation-Beach-Park/Confederation_Beach_Park.jpg',
542            ],
543        }
544    },
545	'Lilian-McGregor-Park':{
546        divisions:{
547            roni: [
548                //'excavating'
549            ],
550            orin: [
551                //'demolition',
552                //'civil',
553                'landscaping',
554            ],
555            iron:[
556                //'shoring',
557                // 'forming',
558                // 'waterproofing',
559            ]
560        },
561        // url:"/orin/demolition",
562        title:'Dr Lilian McGregor Park',
563        loc: 'Toronto, ON',
564        desc: {
565			landscaping: 'Brand new condominium park with shad structure, soft landscape, climbing structures, play services.',
566            //excavating:'Second Project Excavating Description',
567            //civil:'Second Project Civil Description',
568            //shoring:'Supply and install 7 soldier piles, 189 secant piles and 532 filler files for soldier pile, lagging and caisson wall shoring system.',
569        },
570        //date:'2021',
571        thumb: '/img/projects/Orin-Landscaping/Dr-Lillian-McGregor-Park/Lilian_McGregor_Park.jpg',
572        gallery:{
573            landscaping:[
574                '/img/projects/Orin-Landscaping/Dr-Lillian-McGregor-Park/Lilian_McGregor_Park.jpg',
575            ],
576        }
577    },
578	'King_West_Life_Condos':{
579        divisions:{
580            roni: [
581                //'excavating'
582            ],
583            orin: [
584                //'demolition',
585                //'civil',
586                'landscaping',
587            ],
588            iron:[
589                //'shoring',
590                // 'forming',
591                // 'waterproofing',
592            ]
593        },
594        // url:"/orin/demolition",
595        title:'King West Life Condos',
596        loc: 'Toronto, ON',
597        desc: {
598			landscaping: 'King West Life Condos consists of 2 towers, in Liberty Village. Complete ground floor landscaping, planting, retaining walls, interlocking, site furnishings. Multiple courtyards on the 4th and 6th floor, including 25th floor penthouse furnishings. ',
599            //excavating:'Second Project Excavating Description',
600            //civil:'Second Project Civil Description',
601            //shoring:'Supply and install 7 soldier piles, 189 secant piles and 532 filler files for soldier pile, lagging and caisson wall shoring system.',
602        },
603        //date:'2021',
604        thumb: '/img/projects/Orin-Landscaping/King-West-Life-Condos/King_West_Life_Condos.jpg',
605        gallery:{
606            landscaping:[
607                '/img/projects/Orin-Landscaping/King-West-Life-Condos/King_West_Life_Condos.jpg',
608            ],
609        }
610    },
611	'Hot-Condominiums':{
612        divisions:{
613            roni: [
614                //'excavating'
615            ],
616            orin: [
617                //'demolition',
618                //'civil',
619                'landscaping',
620            ],
621            iron:[
622                //'shoring',
623                // 'forming',
624                // 'waterproofing',
625            ]
626        },
627        // url:"/orin/demolition",
628        title:'Hot Condominiums',
629        loc: 'Mississauga, ON',
630        desc: {
631			landscaping: '4 Towers area completed all hardscape, playground, artificial turf, planting, asphalt paving, concrete curbs, water features, wood fencing on the ground floor and entrance.',
632            //excavating:'Second Project Excavating Description',
633            //civil:'Second Project Civil Description',
634            //shoring:'Supply and install 7 soldier piles, 189 secant piles and 532 filler files for soldier pile, lagging and caisson wall shoring system.',
635        },
636        //date:'2021',
637        thumb: '/img/projects/Orin-Landscaping/Hot-Condominiums/Hot_Condominiums.jpg',
638        gallery:{
639            landscaping:[
640                '/img/projects/Orin-Landscaping/Hot-Condominiums/Hot_Condominiums.jpg',
641            ],
642        }
643    },
644	'Pier-8-Promenade':{
645        divisions:{
646            roni: [
647                //'excavating'
648            ],
649            orin: [
650                //'demolition',
651                //'civil',
652                'landscaping',
653            ],
654            iron:[
655                //'shoring',
656                // 'forming',
657                // 'waterproofing',
658            ]
659        },
660        // url:"/orin/demolition",
661        title:'Pier 8 Promenade Park',
662        loc: 'Hamilton, ON ',
663        desc: {
664			landscaping: '1.4-hecatres of new park space and is comprised of a 30-meter wide accessible walkway, multiple art installations, a playground, beach and board game areas as well as a performance stage. ',
665            //excavating:'Second Project Excavating Description',
666            //civil:'Second Project Civil Description',
667            //shoring:'Supply and install 7 soldier piles, 189 secant piles and 532 filler files for soldier pile, lagging and caisson wall shoring system.',
668        },
669        //date:'2021',
670        thumb: '/img/projects/Orin-Landscaping/Pier-8-Promenade/Pier_8_Promenade.jpg',
671        gallery:{
672            landscaping:[
673                '/img/projects/Orin-Landscaping/Pier-8-Promenade/Pier_8_Promenade.jpg',
674            ],
675        }
676    },
677	'Rickard-Neighbourhood-Park':{
678        divisions:{
679            roni: [
680                //'excavating'
681            ],
682            orin: [
683                //'demolition',
684                //'civil',
685                'landscaping',
686            ],
687            iron:[
688                //'shoring',
689                // 'forming',
690                // 'waterproofing',
691            ]
692        },
693        // url:"/orin/demolition",
694        title:'Rickard Neighbourhood Park',
695        loc: 'Clarington, ON',
696        desc: {
697			landscaping: 'Complete build out of Neighbourhood Park in Clarington. ',
698            //excavating:'Second Project Excavating Description',
699            //civil:'Second Project Civil Description',
700            //shoring:'Supply and install 7 soldier piles, 189 secant piles and 532 filler files for soldier pile, lagging and caisson wall shoring system.',
701        },
702        //date:'2021',
703        thumb: '/img/projects/Orin-Landscaping/Rickard-Neighbourhood-Park/Rickard_Neighbourhood_Park.jpg',
704        gallery:{
705            landscaping:[
706                '/img/projects/Orin-Landscaping/Rickard-Neighbourhood-Park/Rickard_Neighbourhood_Park.jpg',
707            ],
708        }
709    },
710	'Frenchman-Bay-Park':{
711        divisions:{
712            roni: [
713                //'excavating'
714            ],
715            orin: [
716                //'demolition',
717                //'civil',
718                'landscaping',
719            ],
720            iron:[
721                //'shoring',
722                // 'forming',
723                // 'waterproofing',
724            ]
725        },
726        // url:"/orin/demolition",
727        title:"Rotary Frenchman's Bay West Park",
728        loc: 'Pickering, ON ',
729        desc: {
730			landscaping: 'Complete build of waterfront Park included removal of granular, signage debris, fence, posts, trees, understory vegetation removals, topsoil stripping and stockpiling and beach sand stripping and earthworks, 
730Coastal and shoreline works. ',
731            //excavating:'Second Project Excavating Description',
732            //civil:'Second Project Civil Description',
733            //shoring:'Supply and install 7 soldier piles, 189 secant piles and 532 filler files for soldier pile, lagging and caisson wall shoring system.',
734        },
735        //date:'2021',
736        thumb: '/img/projects/Orin-Landscaping/Frenchman-Bay-Park/Frenchman_Bay_Park_2.jpg',
737        gallery:{
738            landscaping:[
739				'/img/projects/Orin-Landscaping/Frenchman-Bay-Park/Frenchman_Bay_Park_2.jpg',
740                '/img/projects/Orin-Landscaping/Frenchman-Bay-Park/Frenchman_Bay_Park.jpg',
741            ],
742        }
743    },
744	'Rouge-Valley-Trail':{
745        divisions:{
746            roni: [
747                //'excavating'
748            ],
749            orin: [
750                //'demolition',
751                //'civil',
752                'landscaping',
753            ],
754            iron:[
755                //'shoring',
756                // 'forming',
757                // 'waterproofing',
758            ]
759        },
760        // url:"/orin/demolition",
761        title:"Rouge Valley Trail",
762        loc: 'Markham, ON',
763        desc: {
764			landscaping: "Completed multi-use trail's asphalt re-paving of a section of pathway and  granular pathway extension. Installation of a steel pedestrian bridge crossing is included in the section east of Markham Rd, over Rouge River.",
765            //excavating:'Second Project Excavating Description',
766            //civil:'Second Project Civil Description',
767            //shoring:'Supply and install 7 soldier piles, 189 secant piles and 532 filler files for soldier pile, lagging and caisson wall shoring system.',
768        },
769        //date:'2021',
770        thumb: '/img/projects/Orin-Landscaping/Rouge-Valley-Trail/Rouge_Valley_Trail.jpg',
771        gallery:{
772            landscaping:[
773				'/img/projects/Orin-Landscaping/Rouge-Valley-Trail/Rouge_Valley_Trail.jpg',
774            ],
775        }
776    },
777	'St-Thomas-Outdoor-Park':{
778        divisions:{
779            roni: [
780                //'excavating'
781            ],
782            orin: [
783                //'demolition',
784                //'civil',
785                'landscaping',
786            ],
787            iron:[
788                //'shoring',
789                // 'forming',
790                // 'waterproofing',
791            ]
792        },
793        // url:"/orin/demolition",
794        title:"St Thomas Outdoor Recreation Sports Park",
795        loc: 'St. Thomas, ON',
796        desc: {
797			landscaping: "Complete build out of a 65-acre sports park including concrete vehicular bridge, steel pedestrian bridge, 2km asphalt road, 7km of asphalt trails, 34 soccer fields, CFL regulation football field with artificial turf, splash pads playgrounds and extensive tree planting. ",
798            //excavating:'Second Project Excavating Description',
799            //civil:'Second Project Civil Description',
800            //shoring:'Supply and install 7 soldier piles, 189 secant piles and 532 filler files for soldier pile, lagging and caisson wall shoring system.',
801        },
802        //date:'2021',
803        thumb: '/img/projects/Orin-Landscaping/St-Thomas/St_Thomas_Outdoor_Park.jpg',
804        gallery:{
805            landscaping:[
806				'/img/projects/Orin-Landscaping/St-Thomas/St_Thomas_Outdoor_Park.jpg',
807            ],
808        }
809    },
810	'Wetlands':{
811        divisions:{
812            roni: [
813                //'excavating'
814            ],
815            orin: [
816                //'demolition',
817                //'civil',
818                'landscaping',
819            ],
820            iron:[
821                //'shoring',
822                // 'forming',
823                // 'waterproofing',
824            ]
825        },
826        // url:"/orin/demolition",
827        title:"Wetlands",
828        loc: 'Waterfront, Toronto',
829        desc: {
830			landscaping: "Wetland construct and install habitat protection, irrigation system, temporary flooding, planting and seeding of trees, shrubs and mulch. ",
831            //excavating:'Second Project Excavating Description',
832            //civil:'Second Project Civil Description',
833            //shoring:'Supply and install 7 soldier piles, 189 secant piles and 532 filler files for soldier pile, lagging and caisson wall shoring system.',
834        },
835        //date:'2021',
836        thumb: '/img/projects/Orin-Landscaping/Wetlands/Wetlands.jpg',
837        gallery:{
838            landscaping:[
839				'/img/projects/Orin-Landscaping/Wetlands/Wetlands.jpg',
840				'/img/projects/Orin-Landscaping/Wetlands/Wetlands_2.jpg',
841				'/img/projects/Orin-Landscaping/Wetlands/Wetlands_3.jpg',
842            ],
843        }
844    },
845	
846	
847	'highland-commons':{
848        divisions:{
849            roni: [
850                //'excavating'
851            ],
852            orin: [
853                //'demolition',
854                //'civil',
855                // 'landscaping',
856            ],
857            iron:[
858				'forming',
859                //'shoring',
860                // 'waterproofing',
861            ]
862        },
863        // url:"/orin/demolition",
864        title:"Highland Commons",
865        loc: 'Scarborough, ON',
866        desc: {
867			forming: 'Formwork and placement of concrete, including placing of concrete, rebar, and precast stairs.',
868			//landscaping: "Wetland construct and install habitat protection, irrigation system, temporary flooding, planting and seeding of trees, shrubs and mulch. ",
869            //excavating:'Second Project Excavating Description',
870            //civil:'Second Project Civil Description',
871            //shoring:'Supply and install 7 soldier piles, 189 secant piles and 532 filler files for soldier pile, lagging and caisson wall shoring system.',
872        },
873        //date:'2021',
874        thumb: '/img/projects/Iron-Forming/highland-commons/highland-commons.png',
875        gallery:{
876            forming:[
877				'/img/projects/Iron-Forming/highland-commons/highland-commons.png',
878            ],
879        }
880    },
881	'metro-freezer':{
882        divisions:{
883            roni: [
884                //'excavating'
885            ],
886            orin: [
887                //'demolition',
888                'civil',
889                // 'landscaping',
890            ],
891            iron:[
892				'forming',
893                //'shoring',
894                // 'waterproofing',
895            ]
896        },
897        // url:"/orin/demolition",
898        title:"Metro Freezer",
899        loc: 'Etobicoke, ON',
900        desc: {
901			forming: 'Formwork for a parking structure for Metro',
902            civil: 'Storm servicing, sanitary servicing, watermain, road connection, backfill.',
903        },
904        //date:'2021',
905        thumb: '/img/projects/Iron-Forming/metro-freezer/metro-freezer.png',
906        gallery:{
907            forming:[
908				'/img/projects/Iron-Forming/metro-freezer/metro-freezer.png',
909            ],
910			civil:[
911				'/img/projects/Orin-Civil/Metro-Freezer/metro-freezer.jpg',
912            ],
913        }
914    },
915	'pinnacle-toronto-east':{
916        divisions:{
917            roni: [
918                //'excavating'
919            ],
920            orin: [
921                //'demolition',
922                //'civil',
923                // 'landscaping',
924            ],
925            iron:[
926				'forming',
927                //'shoring',
928                // 'waterproofing',
929            ]
930        },
931        // url:"/orin/demolition",
932        title:"Pinnacle Toronto East",
933        loc: 'Toronto, ON',
934        desc: {
935			forming: '30, 30, 11 and 3, 3 and 3-storey mixed-use condominium and townhouse buildings with p4 underground parking',
936        },
937        //date:'2021',
938        thumb: '/img/projects/Iron-Forming/pinnacle-toronto-east/pinnacle-toronto-east-1.png',
939        gallery:{
940            forming:[
941				'/img/projects/Iron-Forming/pinnacle-toronto-east/pinnacle-toronto-east-1.png',
942				'/img/projects/Iron-Forming/pinnacle-toronto-east/pinnacle-toronto-east-2.png',
943            ],
944        }
945    },
946	
947	'queen-central-condos':{
948        divisions:{
949            roni: [
950                //'excavating'
951            ],
952            orin: [
953                //'demolition',
954                //'civil',
955                // 'landscaping',
956            ],
957            iron:[
958				'forming',
959                //'shoring',
960                // 'waterproofing',
961            ]
962        },
963        // url:"/orin/demolition",
964        title:"Queen Central Condos",
965        loc: 'Toronto, ON',
966        desc: {
967			forming: '35 storey condominium tower with three levels of underground parking.',
968        },
969        //date:'2021',
970        thumb: '/img/projects/Iron-Forming/queen-central-condos/queen-central-condos-1.png',
971        gallery:{
972            forming:[
973				'/img/projects/Iron-Forming/queen-central-condos/queen-central-condos-1.png',
974				'/img/projects/Iron-Forming/queen-central-condos/queen-central-condos-2.png',
975            ],
976        }
977    },
978	'stride-condos':{
979        divisions:{
980            roni: [
981                //'excavating'
982            ],
983            orin: [
984                //'demolition',
985                //'civil',
986                // 'landscaping',
987            ],
988            iron:[
989				'forming',
990                //'shoring',
991                // 'waterproofing',
992            ]
993        },
994        // url:"/orin/demolition",
995        title:"Stride Condos",
996        loc: ' Mississauga, ON',
997        desc: {
998			forming: 'Formwork for condo tower 13 storey, seven blocks of townhomes, with 1 level underground parking',
999        },
1000        //date:'2021',
1001        thumb: '/img/projects/Iron-Forming/stride-condos/stride-condos.png',
1002        gallery:{
1003            forming:[
1004				'/img/projects/Iron-Forming/stride-condos/stride-condos.png',
1005            ],
1006        }
1007    },
1008	'the-clarkson':{
1009        divisions:{
1010            roni: [
1011                //'excavating'
1012            ],
1013            orin: [
1014                //'demolition',
1015                //'civil',
1016                // 'landscaping',
1017            ],
1018            iron:[
1019				'forming',
1020                //'shoring',
1021                // 'waterproofing',
1022            ]
1023        },
1024        // url:"/orin/demolition",
1025        title:"The Clarkson",
1026        loc: ' Mississauga, ON',
1027        desc: {
1028			forming: 'Concrete formwork for two buildings and underground parking.',
1029        },
1030        //date:'2021',
1031        thumb: '/img/projects/Iron-Forming/the-clarkson/the-clarkson.png',
1032        gallery:{
1033            forming:[
1034				'/img/projects/Iron-Forming/the-clarkson/the-clarkson.png',
1035            ],
1036        }
1037    },
1038	'the-twelve-hundred':{
1039        divisions:{
1040            roni: [
1041                //'excavating'
1042            ],
1043            orin: [
1044                //'demolition',
1045                //'civil',
1046                // 'landscaping',
1047            ],
1048            iron:[
1049				'forming',
1050                //'shoring',
1051                // 'waterproofing',
1052            ]
1053        },
1054        // url:"/orin/demolition",
1055        title:"The Twelve Hundred",
1056        loc: 'Toronto, ON',
1057        desc: {
1058			forming: 'Concrete formwork for an 8 storey mixed used condominium.',
1059        },
1060        //date:'2021',
1061        thumb: '/img/projects/Iron-Forming/the-twelve-hundred/the-twelve-hundred.png',
1062        gallery:{
1063            forming:[
1064				'/img/projects/Iron-Forming/the-twelve-hundred/the-twelve-hundred.png',
1065            ],
1066        }
1067    },
1068	'vic-towns':{
1069        divisions:{
1070            roni: [
1071                //'excavating'
1072            ],
1073            orin: [
1074                //'demolition',
1075                //'civil',
1076                // 'landscaping',
1077            ],
1078            iron:[
1079				'forming',
1080                //'shoring',
1081                // 'waterproofing',
1082            ]
1083        },
1084        // url:"/orin/demolition",
1085        title:"The Vic Towns",
1086        loc: 'Toronto, ON',
1087        desc: {
1088			forming: 'Townhouses Forming',
1089        },
1090        //date:'2021',
1091        thumb: '/img/projects/Iron-Forming/vic-towns/vic-towns.png',
1092        gallery:{
1093            forming:[
1094				'/img/projects/Iron-Forming/vic-towns/vic-towns.png',
1095            ],
1096        }
1097    },
1098	'welling-of-whitby':{
1099        divisions:{
1100            roni: [
1101                //'excavating'
1102            ],
1103            orin: [
1104                //'demolition',
1105                //'civil',
1106                // 'landscaping',
1107            ],
1108            iron:[
1109				'forming',
1110                //'shoring',
1111                // 'waterproofing',
1112            ]
1113        },
1114        // url:"/orin/demolition",
1115        title:"Welling of Whitby",
1116        loc: ' Whitby, ON',
1117        desc: {
1118			forming: '19 storey twin towers with 3 level underground parking',
1119        },
1120        //date:'2021',
1121        thumb: '/img/projects/Iron-Forming/Wellings-of-Whitby/welling-of-whitby-1.png',
1122        gallery:{
1123            forming:[
1124				'/img/projects/Iron-Forming/Wellings-of-Whitby/welling-of-whitby-1.png',
1125				'/img/projects/Iron-Forming/Wellings-of-Whitby/welling-of-whitby-2.png',
1126            ],
1127        }
1128    },
1129	'181-east':{
1130        divisions:{
1131            roni: [
1132                //'excavating'
1133            ],
1134            orin: [
1135                //'demolition',
1136                //'civil',
1137                // 'landscaping',
1138            ],
1139            iron:[
1140				//'forming',
1141                //'shoring',
1142                'waterproofing',
1143            ]
1144        },
1145        // url:"/orin/demolition",
1146        title:"181 East",
1147        loc: 'North York, ON',
1148        desc: {
1149			waterproofing: 'Green Roof, waterproofing, metal flashing, insulation',
1150        },
1151        //date:'2021',
1152        thumb: '/img/projects/Iron-waterproofing/181-east/181-east.png',
1153        gallery:{
1154            waterproofing:[
1155				'/img/projects/Iron-waterproofing/181-east/181-east.png',
1156            ],
1157        }
1158    },
1159	'no-31':{
1160        divisions:{
1161            roni: [
1162                //'excavating'
1163            ],
1164            orin: [
1165                //'demolition',
1166                //'civil',
1167                // 'landscaping',
1168            ],
1169            iron:[
1170				//'forming',
1171                //'shoring',
1172                'waterproofing',
1173            ]
1174        },
1175        // url:"/orin/demolition",
1176        title:"No. 31 Condos",
1177        loc: 'Toronto, ON',
1178        desc: {
1179			waterproofing: 'Foundation Wall, Garage Deck Waterproofing',
1180        },
1181        //date:'2021',
1182        thumb: '/img/projects/Iron-waterproofing/no-31/no-31-1.jpg',
1183        gallery:{
1184            waterproofing:[
1185				'/img/projects/Iron-waterproofing/no-31/no-31-1.jpg',
1186				'/img/projects/Iron-waterproofing/no-31/no-31-2.jpg',
1187            ],
1188        }
1189    },
1190	'georgian':{
1191        divisions:{
1192            roni: [
1193                //'excavating'
1194            ],
1195            orin: [
1196                //'demolition',
1197                //'civil',
1198                // 'landscaping',
1199            ],
1200            iron:[
1201				//'forming',
1202                //'shoring',
1203                'waterproofing',
1204            ]
1205        },
1206        // url:"/orin/demolition",
1207        title:"The Georgian",
1208        loc: 'Toronto, ON',
1209        desc: {
1210			waterproofing: 'Below Grade Waterproofing, ground floor deck waterproofing, traffic topping',
1211        },
1212        //date:'2021',
1213        thumb: '/img/projects/Iron-waterproofing/georgian/georgian.jpg',
1214        gallery:{
1215            waterproofing:[
1216				'/img/projects/Iron-waterproofing/georgian/georgian.jpg',
1217            ],
1218        }
1219    },
1220	
1221	'patricia':{
1222        divisions:{
1223            roni: [
1224                //'excavating'
1225            ],
1226            orin: [
1227                //'demolition',
1228                'civil',
1229                // 'landscaping',
1230            ],
1231            iron:[
1232				//'forming',
1233                //'shoring',
1234                //'waterproofing',
1235            ]
1236        },
1237        // url:"/orin/demolition",
1238        title:"Park Place on Patricia",
1239        loc: 'Toronto, ON',
1240        desc: {
1241			civil: 'Site preparation, retaining wall, storm sewers, sanitary sewers, watermain, primary roads, secondary roads.',
1242        },
1243        //date:'2021',
1244        thumb: '/img/projects/Orin-Civil/patricia/patricia.jpg',
1245        gallery:{
1246            civil:[
1247				'/img/projects/Orin-Civil/patricia/patricia.jpg',
1248            ],
1249        }
1250    },
1251	'sloane-trafford':{
1252        divisions:{
1253            roni: [
1254                //'excavating'
1255            ],
1256            orin: [
1257                //'demolition',
1258                'civil',
1259                // 'landscaping',
1260            ],
1261            iron:[
1262				//'forming',
1263                //'shoring',
1264                //'waterproofing',
1265            ]
1266        },
1267        // url:"/orin/demolition",
1268        title:"The Sloane & The Trafford",
1269        loc: 'Toronto, ON',
1270        desc: {
1271			civil: 'Supply and install sanitary manholes, sanitary sewers, catch basins, asphalt pavements, storm sewer connection, watermains, street signs. ',
1272        },
1273        //date:'2021',
1274        thumb: '/img/projects/Orin-Civil/sloane-trafford/sloane-trafford.jpg',
1275        gallery:{
1276            civil:[
1277				'/img/projects/Orin-Civil/sloane-trafford/sloane-trafford.jpg',
1278            ],
1279        }
1280    },
1281	'sloane-trafford':{
1282        divisions:{
1283            roni: [
1284                //'excavating'
1285            ],
1286            orin: [
1287                'demolition',
1288                'civil',
1289                // 'landscaping',
1290            ],
1291            iron:[
1292				//'forming',
1293                //'shoring',
1294                //'waterproofing',
1295            ]
1296        },
1297        // url:"/orin/demolition",
1298        title:"The Sloane & The Trafford",
1299        loc: 'Toronto, ON',
1300        desc: {
1301			civil: 'Supply and install sanitary manholes, sanitary sewers, catch basins, asphalt pavements, storm sewer connection, watermains, street signs. ',
1302			demolition: 'Demolition of Holiday Inn buildings with the 2nd highest reach excavator in Canada',
1303        },
1304        //date:'2021',
1305        thumb: '/img/projects/Orin-Civil/sloane-trafford/sloane-trafford.jpg',
1306        gallery:{
1307            civil:[
1308				'/img/projects/Orin-Civil/sloane-trafford/sloane-trafford.jpg',
1309            ],
1310			demolition:[
1311				'/img/projects/Orin-Demolition/sloane-trafford/sloane-trafford-1.jpg',
1312				'/img/projects/Orin-Demolition/sloane-trafford/sloane-trafford-2.jpg',
1313            ],
1314        }
1315    },
1316	'westwood-gardens':{
1317        divisions:{
1318            roni: [
1319                //'excavating'
1320            ],
1321            orin: [
1322                //'demolition',
1323                'civil',
1324                // 'landscaping',
1325            ],
1326            iron:[
1327				//'forming',
1328                //'shoring',
1329                //'waterproofing',
1330            ]
1331        },
1332        // url:"/orin/demolition",
1333        title:"Westwood Gardens",
1334        loc: 'Toronto, ON',
1335        desc: {
1336			civil: 'Supply and install sanitary manholes, sanitary sewers, catch basins, asphalt pavements, storm sewer connection, watermains, street signs. ',
1337        },
1338        //date:'2021',
1339        thumb: '/img/projects/Orin-Civil/westwood-gardens/westwood-gardens-1.jpg',
1340        gallery:{
1341            civil:[
1342				'/img/projects/Orin-Civil/westwood-gardens/westwood-gardens-1.jpg',
1343				'/img/projects/Orin-Civil/westwood-gardens/westwood-gardens-2.jpg',
1344            ],
1345        }
1346    },
1347	
1348	'11-yv':{
1349        divisions:{
1350            roni: [
1351                //'excavating'
1352            ],
1353            orin: [
1354                'demolition',
1355                //'civil',
1356                // 'landscaping',
1357            ],
1358            iron:[
1359				//'forming',
1360                //'shoring',
1361                //'waterproofing',
1362            ]
1363        },
1364        // url:"/orin/demolition",
1365        title:"11 Yorkville",
1366        loc: 'Toronto, ON',
1367        desc: {
1368			demolition: 'Demolition of 4 existing buildings including abatement and interior gutting.',
1369        },
1370        //date:'2021',
1371        thumb: '/img/projects/Orin-Demolition/11-yv/11-yv.jpg',
1372        gallery:{
1373            demolition:[
1374				'/img/projects/Orin-Demolition/11-yv/11-yv.jpg',
1375            ],
1376        }
1377    },
1378	'1845-birchmount':{
1379        divisions:{
1380            roni: [
1381                //'excavating'
1382            ],
1383            orin: [
1384                'demolition',
1385                //'civil',
1386                // 'landscaping',
1387            ],
1388            iron:[
1389				//'forming',
1390                //'shoring',
1391                //'waterproofing',
1392            ]
1393        },
1394        // url:"/orin/demolition",
1395        title:"1845 Birchmount",
1396        loc: 'Toronto, ON',
1397        desc: {
1398			demolition: 'Structural Demolition, Hazardous removals,  of the industrial  building  278,000 SF.',
1399        },
1400        //date:'2021',
1401        thumb: '/img/projects/Orin-Demolition/1845-birchmount/1845-birchmount.jpg',
1402        gallery:{
1403            demolition:[
1404				'/img/projects/Orin-Demolition/1845-birchmount/1845-birchmount.jpg',
1405            ],
1406        }
1407    },
1408	'1845-birchmount':{
1409        divisions:{
1410            roni: [
1411                //'excavating'
1412            ],
1413            orin: [
1414                'demolition',
1415                //'civil',
1416                // 'landscaping',
1417            ],
1418            iron:[
1419				//'forming',
1420                //'shoring',
1421                //'waterproofing',
1422            ]
1423        },
1424        // url:"/orin/demolition",
1425        title:"1845 Birchmount",
1426        loc: 'Toronto, ON',
1427        desc: {
1428			demolition: 'Structural Demolition, Hazardous removals,  of the industrial  building  278,000 SF.',
1429        },
1430        //date:'2021',
1431        thumb: '/img/projects/Orin-Demolition/1845-birchmount/1845-birchmount.jpg',
1432        gallery:{
1433            demolition:[
1434				'/img/projects/Orin-Demolition/1845-birchmount/1845-birchmount.jpg',
1435            ],
1436        }
1437    },
1438	'first-ave':{
1439        divisions:{
1440            roni: [
1441                //'excavating'
1442            ],
1443            orin: [
1444                'demolition',
1445                //'civil',
1446                // 'landscaping',
1447            ],
1448            iron:[
1449				//'forming',
1450                //'shoring',
1451                //'waterproofing',
1452            ]
1453        },
1454        // url:"/orin/demolition",
1455        title:"First Ave",
1456        loc: 'Oshawa, ON',
1457        desc: {
1458			demolition: 'Demolition of 398,000 sqft existing industrial warehouse located in Oshawa including hazardous removals.',
1459        },
1460        //date:'2021',
1461        thumb: '/img/projects/Orin-Demolition/first-ave/first-ave.jpg',
1462        gallery:{
1463            demolition:[
1464				'/img/projects/Orin-Demolition/first-ave/first-ave.jpg',
1465            ],
1466        }
1467    },
1468	'Hudson-Bay':{
1469        divisions:{
1470            roni: [
1471                //'excavating'
1472            ],
1473            orin: [
1474                'demolition',
1475                //'civil',
1476                // 'landscaping',
1477            ],
1478            iron:[
1479				//'forming',
1480                //'shoring',
1481                //'waterproofing',
1482            ]
1483        },
1484        // url:"/orin/demolition",
1485        title:"Hudson's Bay Company",
1486        loc: 'Brampton, ON',
1487        desc: {
1488			demolition: "Demolition of former Hudson's Bay Headquarters and CSCB National office commercial buildings.",
1489        },
1490        //date:'2021',
1491        thumb: '/img/projects/Orin-Demolition/Hudson-Bay/Hudson-Bay-1.jpg',
1492        gallery:{
1493            demolition:[
1494				'/img/projects/Orin-Demolition/Hudson-Bay/Hudson-Bay-1.jpg',
1495				'/img/projects/Orin-Demolition/Hudson-Bay/Hudson-Bay-2.jpg',
1496            ],
1497        }
1498    },
1499	'Line-5-Condos':{
1500        divisions:{
1501            roni: [
1502                //'excavating'
1503            ],
1504            orin: [
1505                'demolition',
1506                //'civil',
1507                // 'landscaping',
1508            ],
1509            iron:[
1510				//'forming',
1511                //'shoring',
1512                //'waterproofing',
1513            ]
1514        },
1515        // url:"/orin/demolition",
1516        title:"Line 5 Condos",
1517        loc: 'Toronto, ON',
1518        desc: {
1519			demolition: "Demolition and abatement of existing houses, two apartment buildings of 3 stories, 10-storey apartment building, removal of interior foundation walls, tree protection, leveling to grade. Disposal off site of debris and proper disposal of spoils generated from abatement work. Recycling of materials.",
1520        },
1521        //date:'2021',
1522        thumb: '/img/projects/Orin-Demolition/Line-5-Condos/Line-5-Condos-1.jpg',
1523        gallery:{
1524            demolition:[
1525				'/img/projects/Orin-Demolition/Line-5-Condos/Line-5-Condos-1.jpg',
1526				'/img/projects/Orin-Demolition/Line-5-Condos/Line-5-Condos-2.jpg',
1527            ],
1528        }
1529    },
1530	'Luxy':{
1531        divisions:{
1532            roni: [
1533                //'excavating'
1534            ],
1535            orin: [
1536                'demolition',
1537                //'civil',
1538                // 'landscaping',
1539            ],
1540            iron:[
1541				//'forming',
1542                //'shoring',
1543                //'waterproofing',
1544            ]
1545        },
1546        // url:"/orin/demolition",
1547        title:"Former Luxy Nightclub",
1548        loc: 'Vaughan, ON',
1549        desc: {
1550			demolition: "Demolition of existing 2 storey commercial building.",
1551        },
1552        //date:'2021',
1553        thumb: '/img/projects/Orin-Demolition/luxy/luxy.jpg',
1554        gallery:{
1555            demolition:[
1556				'/img/projects/Orin-Demolition/luxy/luxy.jpg',
1557            ],
1558        }
1559    },
1560	'towns-of-islington':{
1561        divisions:{
1562            roni: [
1563                //'excavating'
1564            ],
1565            orin: [
1566                'demolition',
1567                //'civil',
1568                // 'landscaping',
1569            ],
1570            iron:[
1571				//'forming',
1572                //'shoring',
1573                //'waterproofing',
1574            ]
1575        },
1576        // url:"/orin/demolition",
1577        title:"Towns of Islington Village
1577",
1578        loc: 'Etobicoke, ON',
1579        desc: {
1580			demolition: "Demolition of existing residential homes. ",
1581        },
1582        //date:'2021',
1583        thumb: '/img/projects/Orin-Demolition/towns-of-islington/towns-of-islington.jpg',
1584        gallery:{
1585            demolition:[
1586				'/img/projects/Orin-Demolition/towns-of-islington/towns-of-islington.jpg',
1587            ],
1588        }
1589    },
1590	'valhalla':{
1591        divisions:{
1592            roni: [
1593                'excavating'
1594            ],
1595            orin: [
1596                'demolition',
1597                //'civil',
1598                // 'landscaping',
1599            ],
1600            iron:[
1601				//'forming',
1602                //'shoring',
1603                //'waterproofing',
1604            ]
1605        },
1606        // url:"/orin/demolition",
1607        title:"Valhalla Town Square",
1608        loc: 'Etobicoke, ON',
1609        desc: {
1610			demolition: "Structural Demolition and hazardous material removal of 3 existing commercial buildings, standing at 6,7 and 9 storey.",
1611			excavating: "Bulk Excavation",
1612        },
1613        //date:'2021',
1614        thumb: '/img/projects/Orin-Demolition/valhalla/valhalla.jpg',
1615        gallery:{
1616            demolition:[
1617				'/img/projects/Orin-Demolition/valhalla/valhalla.jpg',
1618            ],
1619			excavating:[
1620				'/img/projects/Roni-Excavating/valhalla/valhalla.jpg',
1621            ],
1622        }
1623    },
1624	'wellesley-station':{
1625        divisions:{
1626            roni: [
1627                //'excavating'
1628            ],
1629            orin: [
1630                'demolition',
1631                //'civil',
1632                // 'landscaping',
1633            ],
1634            iron:[
1635				//'forming',
1636                //'shoring',
1637                //'waterproofing',
1638            ]
1639        },
1640        // url:"/orin/demolition",
1641        title:"Yonge at Wellesley Station",
1642        loc: 'Toronto, ON',
1643        desc: {
1644			demolition: "Structural Demolition and abatement of existing 2.5 and 3-storey buildings. Disposal off site of debris and proper disposal of spoils generated from abatement work. Recycling of materials. ",
1645        },
1646        //date:'2021',
1647        thumb: '/img/projects/Orin-Demolition/wellesley-station/wellesley-station.jpg',
1648        gallery:{
1649            demolition:[
1650				'/img/projects/Orin-Demolition/wellesley-station/wellesley-station.jpg',
1651            ],
1652        }
1653    },
1654	
1655	'yorkwood-condo':{
1656        divisions:{
1657            roni: [
1658                'excavating'
1659            ],
1660            orin: [
1661                //'demolition',
1662                //'civil',
1663                // 'landscaping',
1664            ],
1665            iron:[
1666				//'forming',
1667                //'shoring',
1668                //'waterproofing',
1669            ]
1670        },
1671        // url:"/orin/demolition",
1672        title:"Yorkwood Condo",
1673        loc: 'Toronto, ON',
1674        desc: {
1675			excavating: "Bulk Excavation",
1676        },
1677        //date:'2021',
1678        thumb: '/img/projects/Roni-Excavating/yorkwood-condo/yorkwood-condo-1.jpg',
1679        gallery:{
1680            excavating:[
1681				'/img/projects/Roni-Excavating/yorkwood-condo/yorkwood-condo-1.jpg',
1682				'/img/projects/Roni-Excavating/yorkwood-condo/yorkwood-condo-2.jpg',
1683            ],
1684        }
1685    },
1686	'yee-hong':{
1687        divisions:{
1688            roni: [
1689                'excavating'
1690            ],
1691            orin: [
1692                //'demolition',
1693                //'civil',
1694                // 'landscaping',
1695            ],
1696            iron:[
1697				//'forming',
1698                //'shoring',
1699                //'waterproofing',
1700            ]
1701        },
1702        // url:"/orin/demolition",
1703        title:"Yee Hong",
1704        loc: 'Toronto, ON',
1705        desc: {
1706			excavating: "Bulk and Detailed Excavation",
1707        },
1708        //date:'2021',
1709        thumb: '/img/projects/Roni-Excavating/yee-hong/yee-hong-1.jpg',
1710        gallery:{
1711            excavating:[
1712				'/img/projects/Roni-Excavating/yee-hong/yee-hong-1.jpg',
1713				'/img/projects/Roni-Excavating/yee-hong/yee-hong-2.jpg',
1714            ],
1715        }
1716    },
1717	'30-merton':{
1718        divisions:{
1719            roni: [
1720                'excavating'
1721            ],
1722            orin: [
1723                //'demolition',
1724                //'civil',
1725                // 'landscaping',
1726            ],
1727            iron:[
1728				//'forming',
1729                //'shoring',
1730                //'waterproofing',
1731            ]
1732        },
1733        // url:"/orin/demolition",
1734        title:"30 Merton",
1735        loc: 'Toronto, ON',
1736        desc: {
1737			excavating: "Bulk Excavation",
1738        },
1739        //date:'2021',
1740        thumb: '/img/projects/Roni-Excavating/30-merton/30-merton.jpg',
1741        gallery:{
1742            excavating:[
1743				'/img/projects/Roni-Excavating/30-merton/30-merton.jpg',
1744            ],
1745        }
1746    },
1747	'voya-parkside':{
1748        divisions:{
1749            roni: [
1750                'excavating'
1751            ],
1752            orin: [
1753                //'demolition',
1754                //'civil',
1755                // 'landscaping',
1756            ],
1757            iron:[
1758				//'forming',
1759                //'shoring',
1760                //'waterproofing',
1761            ]
1762        },
1763        // url:"/orin/demolition",
1764        title:"Voya Parkside Block 1W",
1765        loc: 'Mississauga, ON',
1766        desc: {
1767			excavating: "Bulk Excavation",
1768        },
1769        //date:'2021',
1770        thumb: '/img/projects/Roni-Excavating/voya-parkside/voya-p
1770arkside.jpg',
1771        gallery:{
1772            excavating:[
1773				'/img/projects/Roni-Excavating/voya-parkside/voya-parkside.jpg',
1774            ],
1775        }
1776    },
1777	'1077-enola':{
1778        divisions:{
1779            roni: [
1780                'excavating'
1781            ],
1782            orin: [
1783                //'demolition',
1784                //'civil',
1785                // 'landscaping',
1786            ],
1787            iron:[
1788				//'forming',
1789                //'shoring',
1790                //'waterproofing',
1791            ]
1792        },
1793        // url:"/orin/demolition",
1794        title:"Stride Condos",
1795        loc: 'Mississauga, ON',
1796        desc: {
1797			excavating: "Bulk Excavation",
1798        },
1799        //date:'2021',
1800        thumb: '/img/projects/Roni-Excavating/1077-enola/1077-enola.jpg',
1801        gallery:{
1802            excavating:[
1803				'/img/projects/Roni-Excavating/1077-enola/1077-enola.jpg',
1804            ],
1805        }
1806    },
1807	'riverside-square':{
1808        divisions:{
1809            roni: [
1810                'excavating'
1811            ],
1812            orin: [
1813                //'demolition',
1814                //'civil',
1815                // 'landscaping',
1816            ],
1817            iron:[
1818				//'forming',
1819                //'shoring',
1820                //'waterproofing',
1821            ]
1822        },
1823        // url:"/orin/demolition",
1824        title:"Riverside Square",
1825        loc: 'Toronto, ON',
1826        desc: {
1827			excavating: "Bulk Excavation",
1828        },
1829        //date:'2021',
1830        thumb: '/img/projects/Roni-Excavating/riverside-square/riverside-square.jpg',
1831        gallery:{
1832            excavating:[
1833				'/img/projects/Roni-Excavating/riverside-square/riverside-square.jpg',
1834            ],
1835        }
1836    },
1837	'205-queen':{
1838        divisions:{
1839            roni: [
1840                'excavating'
1841            ],
1842            orin: [
1843                //'demolition',
1844                //'civil',
1845                // 'landscaping',
1846            ],
1847            iron:[
1848				//'forming',
1849                //'shoring',
1850                //'waterproofing',
1851            ]
1852        },
1853        // url:"/orin/demolition",
1854        title:"205 Queen St ",
1855        loc: 'Brampton, ON',
1856        desc: {
1857			excavating: "Bulk & detailed excavation",
1858        },
1859        //date:'2021',
1860        thumb: '/img/projects/Roni-Excavating/205-queen/205-queen-1.jpg',
1861        gallery:{
1862            excavating:[
1863				'/img/projects/Roni-Excavating/205-queen/205-queen-1.jpg',
1864				'/img/projects/Roni-Excavating/205-queen/205-queen-2.jpg',
1865            ],
1866        }
1867    },
1868	
1869 
1870}
1871
1872

Line numbers count LF bytes from the start of the resource, as the search results do. Vendor segments are library code the classifier recognised; they are stored but not indexed. Bytes are shown as Latin1 characters, one per byte.