1const projects= { 2 'trillium':{ 3 divisions:{ 4 roni: [ 5 //'excavating' 6 ], 7 orin: [ 8 // 'demolition', 9 'civil', 10 // 'landscaping', 11 ], 12 iron:[ 13 'shoring', 14 // 'forming', 15 // 'waterproofing', 16 ] 17 }, 18 // url:"/orin/demolition", 19 title:'Trillium Long Term Care Facility', 20 loc: ' Mississauga, ON', 21 desc: { 22 //excavating:'Spoil removal of structural casissons, loading, hauling and disposal off site, Asphalt removal and disposal off site, bulk excavation, detailed excavation.', 23 civil:'Site Servicing, Supply and installation of Sanitary Services, Storm Services, Watermain services. Remove & replace existing 1500mm manhole on North Sheridan Way including new drop structure. Temporary restoration of existing asphalt, Permanent restoration of existing asphalt', 24 shoring:'Drilling over 300 structural caissons with 1500m diameter including supply and placing concrete and rebar cages', 25 }, 26 //date:'2021', 27 thumb: '/img/projects/trillium-long-term/1.jpg', 28 gallery:{ 29 //excavating:[ 30 // '/img/projects/trillium-long-term/excavating-1.jpg', 31 //], 32 civil:[ 33 '/img/projects/trillium-long-term/civil-1.jpg', 34 '/img/projects/trillium-long-term/civil-2.jpg', 35 ], 36 shoring:[ 37 '/img/projects/trillium-long-term/shoring-1.jpg', 38 '/img/projects/trillium-long-term/shoring-2.jpg', 39 ], 40 } 41 }, 42 '35-Patterson':{ 43 divisions:{ 44 roni: [ 45 //'excavating' 46 ], 47 orin: [ 48 // 'demolition', 49 //'civil', 50 // 'landscaping', 51 ], 52 iron:[ 53 'shoring', 54 // 'forming', 55 // 'waterproofing', 56 ] 57 }, 58 // url:"/orin/demolition", 59 title:'Kingsley Square', 60 loc: 'Newmarket, ON', 61 desc: { 62 //excavating:'Second Project Excavating Description', 63 //civil:'Second Project Civil Description', 64 shoring:'Design/Build - 140,000 sf below grade, 280,000 sf above grade', 65 }, 66 //date:'2021', 67 thumb: '/img/projects/Iron-shoring/35-Patterson/1.png', 68 gallery:{ 69 shoring:[ 70 '/img/projects/Iron-shoring/35-Patterson/1.png', 71 ], 72 } 73 }, 74 '340-Mill-Rd':{ 75 divisions:{ 76 roni: [ 77 //'excavating' 78 ], 79 orin: [ 80 'demolition', 81 //'civil', 82 // 'landscaping', 83 ], 84 iron:[ 85 'shoring', 86 // 'forming', 87 // 'waterproofing', 88 ] 89 }, 90 // url:"/orin/demolition", 91 title:'340 Mill Rd', 92 loc: 'Etobicoke, ON', 93 desc: { 94 shoring:'Vertical Drilling, lagging, tieback', 95 demolition:'Removal of existing building parking structure, concrete slabs, footing and foundations', 96 }, 97 //date:'2021', 98 thumb: '/img/projects/Iron-shoring/340-Mill-Rd/1.png', 99 gallery:{ 100 shoring:[ 101 '/img/projects/Iron-shoring/340-Mill-Rd/1.png', 102 ], 103 demolition:[ 104 '/img/projects/Orin-Demolition/340-Mill-Rd/340-Mill-Rd.jpg', 105 ], 106 } 107 }, 108 '844-Don-Mills':{ 109 divisions:{ 110 roni: [ 111 //'excavating' 112 ], 113 orin: [ 114 // 'demolition', 115 //'civil', 116 // 'landscaping', 117 ], 118 iron:[ 119 'shoring', 120 // 'forming', 121 // 'waterproofing', 122 ] 123 }, 124 // url:"/orin/demolition", 125 title:'Crosstown', 126 loc: 'Toronto, ON', 127 desc: { 128 //excavating:'Second Project Excavating Description', 129 //civil:'Second Project Civil Description', 130 shoring:'Drilling solder piles and caisson of 5 level underground parking, includes lagging, tiebacks, corner bracing', 131 }, 132 //date:'2021', 133 thumb: '/img/projects/Iron-shoring/844-Don-Mills/1.png', 134 gallery:{ 135 shoring:[ 136 '/img/projects/Iron-shoring/844-Don-Mills/1.png', 137 ], 138 } 139 }, 140 '300-Bloor':{ 141 divisions:{ 142 roni: [ 143 'excavating' 144 ], 145 orin: [ 146 'demolition', 147 //'civil', 148 // 'landscaping', 149 ], 150 iron:[ 151 'shoring', 152 // 'forming', 153 // 'waterproofing', 154 ] 155 }, 156 // url:"/orin/demolition", 157 title:'Cielo Condos', 158 loc: 'Toronto, ON', 159 desc: { 160 shoring:'Vertical drilling, structural caissons, 4 rows of tiebacks, excavation above TTC Tunnel. ', 161 demolition:'Structural Demolition, Retention System, Heritage, Salvage, Abatement of the united church. ', 162 excavating:'Bulk and Detailed Excavation above TTC Tunnel down to P4 level', 163 }, 164 //date:'2021', 165 thumb: '/img/projects/Iron-shoring/300-Bloor/1.png', 166 gallery:{ 167 shoring:[ 168 '/img/projects/Iron-shoring/300-Bloor/1.png', 169 '/img/projects/Iron-shoring/300-Bloor/2.png', 170 ], 171 demolition:[ 172 '/img/projects/Orin-Demolition/300-Bloor/300-bloor.jpg', 173 ], 174 excavating:[ 175 '/img/projects/Roni-Excavating/300-Bloor/300-bloor.jpg', 176 ], 177 } 178 }, 179 '500-Wilson':{ 180 divisions:{ 181 roni: [ 182 //'excavating' 183 ], 184 orin: [ 185 'demolition', 186 // 'civil', 187 // 'landscaping', 188 ], 189 iron:[ 190 'shoring', 191 // 'forming', 192 // 'waterproofing', 193 ] 194 }, 195 // url:"/orin/demolition", 196 title:'Nørdic Condos', 197 loc: 'North York, ON', 198 desc: { 199 shoring:'Installation of interlocking caisson wall and soldier piles for one level underground parking ', 200 demolition:'Demolition and abatement of 5-storey commercial building, two 3-storey apartment buildings with basement, total of 60 units, decommissioning of elevators and AC units and removal of all debris off site and proper disposal of spoils generated from abatement work.', 201 }, 202 //date:'2021', 203 thumb: '/img/projects/Iron-shoring/500-Wilson/1.png', 204 gallery:{ 205 shoring:[ 206 '/img/projects/Iron-shoring/500-Wilson/1.png', 207 ], 208 demolition:[ 209 '/img/projects/Orin-Demolition/nordic-condos/nordic-condos.jpg', 210 ], 211 } 212 }, 213 'Humber-River-Hospital':{ 214 divisions:{ 215 roni: [ 216 //'excavating' 217 ], 218 orin: [ 219 // 'demolition', 220 //'civil', 221 // 'landscaping', 222 ], 223 iron:[ 224 'shoring', 225 // 'forming', 226 // 'waterproofing', 227 ] 228 }, 229 // url:"/orin/demolition", 230 title:'Humber River Hospital', 231 loc: 'North York, ON', 232 desc: { 233 //excavating:'Second Project Excavating Description', 234 //civil:'Second Project Civil Description', 235 shoring:'Drilling over 140 structural caissons with 1800mm diameter including supply & placing concrete & rebar cages', 236 }, 237 //date:'2021', 238 thumb: '/img/projects/Iron-shoring/Humber-River-Hospital/1.png', 239 gallery:{ 240 shoring:[ 241 '/img/projects/Iron-shoring/Humber-River-Hospital/1.png', 242 ], 243 } 244 }, 245 '908-St-Clair-W':{ 246 divisions:{ 247 roni: [ 248 'excavating' 249 ], 250 orin: [ 251 // 'demolition', 252 //'civil', 253 // 'landscaping', 254 ], 255 iron:[ 256 'shoring', 257 // 'forming', 258 // 'waterproofing', 259 ] 260 }, 261 // url:"/orin/demolition", 262 title:'908 St Clair', 263 loc: 'Toronto, ON', 264 desc: { 265 excavating:'Bulk Excavation', 266 //civil:'Second Project Civil Description', 267 shoring:'Vertical Drilling, Tieback, strats/corner bracing/walers, wooder rackers, demolition, additional support at grade for excavator location when double handling bottom of excavating soils', 268 }, 269 //date:'2021', 270 thumb: '/img/projects/Iron-shoring/908-Clair/1.png', 271 gallery:{ 272 shoring:[ 273 '/img/projects/Iron-shoring/908-Clair/1.png', 274 ], 275 excavating:[ 276 '/img/projects/Roni-Excavating/908-St-Clair/908-St-Clair.jpg', 277 ], 278 } 279 }, 280 'Buck-Bin':{ 281 divisions:{ 282 roni: [ 283 //'excavating' 284 ], 285 orin: [ 286 // 'demolition', 287 //'civil', 288 // 'landscaping', 289 ], 290 iron:[ 291 'shoring', 292 // 'forming', 293 // 'waterproofing', 294 ] 295 }, 296 // url:"/orin/demolition", 297 //title:'Scarborough Muck Bin', 298 title:'Tunnel Soil Disposal Muck Bin at Scarborough LRT', 299 loc: 'Scarborough, ON', 300 desc: { 301 //excavating:'Second Project Excavating Description', 302 //civil:'Second Project Civil Description', 303 shoring:'Caisson cut-off wall shoring system (3m cut) designed in cantilever for holding TBM cuttings. 82 secant piles and 240 filler piles. ', 304 }, 305 //date:'2021', 306 thumb: '/img/projects/Iron-shoring/Buck-Bin/1.png', 307 gallery:{ 308 shoring:[ 309 '/img/projects/Iron-shoring/Buck-Bin/1.png', 310 '/img/projects/Iron-shoring/Buck-Bin/2.png', 311 ], 312 } 313 }, 314 'Sheppard-Ave-W':{ 315 divisions:{ 316 roni: [ 317 //'excavating' 318 ], 319 orin: [ 320 // 'demolition', 321 //'civil', 322 // 'landscaping', 323 ], 324 iron:[ 325 'shoring', 326 // 'forming', 327 // 'waterproofing', 328 ] 329 }, 330 // url:"/orin/demolition", 331 title:'NorthCore Condos', 332 loc: 'Toronto, ON', 333 desc: { 334 //excavating:'Second Project Excavating Description', 335 //civil:'Second Project Civil Description', 336 shoring:'Vertical Drilling, S&I tiebacks, walers, raker, lagging, winter heat, design platform, top waler for excavator, vertical posts', 337 }, 338 //date:'2021', 339 thumb: '/img/projects/Iron-shoring/Sheppard-Ave-W/1.png', 340 gallery:{ 341 shoring:[ 342 '/img/projects/Iron-shoring/Sheppard-Ave-W/1.png', 343 ], 344 } 345 }, 346 '278-Hillmount':{ 347 divisions:{ 348 roni: [ 349 //'excavating' 350 ], 351 orin: [ 352 // 'demolition', 353 //'civil', 354 // 'landscaping', 355 ], 356 iron:[ 357 'shoring', 358 // 'forming', 359 // 'waterproofing', 360 ] 361 }, 362 // url:"/orin/demolition", 363 title:'The Dylan', 364 loc: 'North York, ON', 365 desc: { 366 //excavating:'Second Project Excavating Description', 367 //civil:'Second Project Civil Description', 368 shoring:'shoring system consisting of all secant piles, filler piles, soldier piles, tiebacks, lagging and corner braces, and structural caissons', 369 }, 370 //date:'2021', 371 thumb: '/img/projects/Iron-shoring/278-Hillmount/1.png', 372 gallery:{ 373 shoring:[ 374 '/img/projects/Iron-shoring/278-Hillmount/1.png', 375 ], 376 } 377 }, 378 'McGibbon':{ 379 divisions:{ 380 roni: [ 381 //'excavating' 382 ], 383 orin: [ 384 // 'demolition', 385 //'civil', 386 // 'landscaping', 387 ], 388 iron:[ 389 'shoring', 390 // 'forming', 391 // 'waterproofing', 392 ] 393 }, 394 // url:"/orin/demolition", 395 title:'McGibbon on Main', 396 loc: 'Halton Hills, ON', 397 desc: { 398 //excavating:'Second Project Excavating Description', 399 //civil:'Second Project Civil Description', 400 shoring:'Design and construct shoring platform. Vertical drilling, tieback, lagging, shotcrete, vertical for guardrails, destressing tiebacks.', 401 }, 402 //date:'2021', 403 thumb: '/img/projects/Iron-shoring/McGibbon/1.png', 404 gallery:{ 405 shoring:[ 406 '/img/projects/Iron-shoring/McGibbon/1.png', 407 ], 408 } 409 }, 410 'TTC-Russel-Carhouse':{ 411 divisions:{ 412 roni: [ 413 //'excavating' 414 ], 415 orin: [ 416 // 'demolition', 417 //'civil', 418 // 'landscaping', 419 ], 420 iron:[ 421 'shoring', 422 // 'forming', 423 // 'waterproofing', 424 ] 425 }, 426 // url:"/orin/demolition", 427 title:'TTC Russel Carhouse', 428 loc: 'Toronto, ON', 429 desc: { 430 //excavating:'Second Project Excavating Description', 431 //civil:'Second Project Civil Description', 432 shoring:'Supply and install 7 soldier piles, 189 secant piles and 532 filler files for soldier pile, lagging and caisson wall shoring system.', 433 }, 434 //date:'2021', 435 thumb: '/img/projects/Iron-shoring/TTC-Russell-Carhouse/1.png', 436 gallery:{ 437 shoring:[ 438 '/img/projects/Iron-shoring/TTC-Russell-Carhouse/1.png', 439 ], 440 } 441 }, 442 443 'Andrew-McCandless-Park':{ 444 divisions:{ 445 roni: [ 446 //'excavating' 447 ], 448 orin: [ 449 //'demolition', 450 //'civil', 451 'landscaping', 452 ], 453 iron:[ 454 //'shoring', 455 // 'forming', 456 // 'waterproofing', 457 ] 458 }, 459 // url:"/orin/demolition", 460 title:'Andrew McCandless Park', 461 loc: 'Brampton, ON', 462 desc: { 463 landscaping: 'Development of 23-acre park including site clearing and grubbing, sediment c
463ontrol including construction of sediment basins, silt fence, rock check dams, ditches, wet parkland features, strip topsoil, screen, and prepare onsite sports mix, built 2,500 sq. ft washroom building. ', 464 //excavating:'Second Project Excavating Description', 465 //civil:'Second Project Civil Description', 466 //shoring:'Supply and install 7 soldier piles, 189 secant piles and 532 filler files for soldier pile, lagging and caisson wall shoring system.', 467 }, 468 //date:'2021', 469 thumb: '/img/projects/Orin-Landscaping/Andrew-McCandless-Park/Andrew_McCandless.jpg', 470 gallery:{ 471 landscaping:[ 472 '/img/projects/Orin-Landscaping/Andrew-McCandless-Park/Andrew_McCandless.jpg', 473 '/img/projects/Orin-Landscaping/Andrew-McCandless-Park/Andrew_McCandless_2.jpg', 474 ], 475 } 476 }, 477 'Azura-Park':{ 478 divisions:{ 479 roni: [ 480 //'excavating' 481 ], 482 orin: [ 483 //'demolition', 484 //'civil', 485 'landscaping', 486 ], 487 iron:[ 488 //'shoring', 489 // 'forming', 490 // 'waterproofing', 491 ] 492 }, 493 // url:"/orin/demolition", 494 title:'Azura Park', 495 loc: '15-21 Holmes', 496 desc: { 497 landscaping: 'Complete build of parkland landscape work including site prep, site servicing, hardscape, shade structure, site furnishings, playground, soft landscaping, lighting and electrical, irrigation. ', 498 //excavating:'Second Project Excavating Description', 499 //civil:'Second Project Civil Description', 500 //shoring:'Supply and install 7 soldier piles, 189 secant piles and 532 filler files for soldier pile, lagging and caisson wall shoring system.', 501 }, 502 //date:'2021', 503 thumb: '/img/projects/Orin-Landscaping/Azura-Park/Azura_Park.jpg', 504 gallery:{ 505 landscaping:[ 506 '/img/projects/Orin-Landscaping/Azura-Park/Azura_Park.jpg', 507 '/img/projects/Orin-Landscaping/Azura-Park/Azura_Park_2.jpg', 508 '/img/projects/Orin-Landscaping/Azura-Park/Azura_Park_3.jpg', 509 ], 510 } 511 }, 512 'Confederation-Beach-Park':{ 513 divisions:{ 514 roni: [ 515 //'excavating' 516 ], 517 orin: [ 518 //'demolition', 519 //'civil', 520 'landscaping', 521 ], 522 iron:[ 523 //'shoring', 524 // 'forming', 525 // 'waterproofing', 526 ] 527 }, 528 // url:"/orin/demolition", 529 title:'Confederation Beach Park', 530 loc: 'Hamilton, ON', 531 desc: { 532 landscaping: 'Work completed in 2 stages, Stage 1 include site preparation, demolition and removals; excavation, rough grading; site servicing;
532 access road, erosion and sediment control, sports fields and Pickleball courts, and parking lot preparation. Stage 2 include the parking lot storm sewer and bioretention swale system that discharges into Stoney Creek Pond via concrete headwall, as well as parking lot finishing.', 533 //excavating:'Second Project Excavating Description', 534 //civil:'Second Project Civil Description', 535 //shoring:'Supply and install 7 soldier piles, 189 secant piles and 532 filler files for soldier pile, lagging and caisson wall shoring system.', 536 }, 537 //date:'2021', 538 thumb: '/img/projects/Orin-Landscaping/Confederation-Beach-Park/Confederation_Beach_Park.jpg', 539 gallery:{ 540 landscaping:[ 541 '/img/projects/Orin-Landscaping/Confederation-Beach-Park/Confederation_Beach_Park.jpg', 542 ], 543 } 544 }, 545 'Lilian-McGregor-Park':{ 546 divisions:{ 547 roni: [ 548 //'excavating' 549 ], 550 orin: [ 551 //'demolition', 552 //'civil', 553 'landscaping', 554 ], 555 iron:[ 556 //'shoring', 557 // 'forming', 558 // 'waterproofing', 559 ] 560 }, 561 // url:"/orin/demolition", 562 title:'Dr Lilian McGregor Park', 563 loc: 'Toronto, ON', 564 desc: { 565 landscaping: 'Brand new condominium park with shad structure, soft landscape, climbing structures, play services.', 566 //excavating:'Second Project Excavating Description', 567 //civil:'Second Project Civil Description', 568 //shoring:'Supply and install 7 soldier piles, 189 secant piles and 532 filler files for soldier pile, lagging and caisson wall shoring system.', 569 }, 570 //date:'2021', 571 thumb: '/img/projects/Orin-Landscaping/Dr-Lillian-McGregor-Park/Lilian_McGregor_Park.jpg', 572 gallery:{ 573 landscaping:[ 574 '/img/projects/Orin-Landscaping/Dr-Lillian-McGregor-Park/Lilian_McGregor_Park.jpg', 575 ], 576 } 577 }, 578 'King_West_Life_Condos':{ 579 divisions:{ 580 roni: [ 581 //'excavating' 582 ], 583 orin: [ 584 //'demolition', 585 //'civil', 586 'landscaping', 587 ], 588 iron:[ 589 //'shoring', 590 // 'forming', 591 // 'waterproofing', 592 ] 593 }, 594 // url:"/orin/demolition", 595 title:'King West Life Condos', 596 loc: 'Toronto, ON', 597 desc: { 598 landscaping: 'King West Life Condos consists of 2 towers, in Liberty Village. Complete ground floor landscaping, planting, retaining walls, interlocking, site furnishings. Multiple courtyards on the 4th and 6th floor, including 25th floor penthouse furnishings. ', 599 //excavating:'Second Project Excavating Description', 600 //civil:'Second Project Civil Description', 601 //shoring:'Supply and install 7 soldier piles, 189 secant piles and 532 filler files for soldier pile, lagging and caisson wall shoring system.', 602 }, 603 //date:'2021', 604 thumb: '/img/projects/Orin-Landscaping/King-West-Life-Condos/King_West_Life_Condos.jpg', 605 gallery:{ 606 landscaping:[ 607 '/img/projects/Orin-Landscaping/King-West-Life-Condos/King_West_Life_Condos.jpg', 608 ], 609 } 610 }, 611 'Hot-Condominiums':{ 612 divisions:{ 613 roni: [ 614 //'excavating' 615 ], 616 orin: [ 617 //'demolition', 618 //'civil', 619 'landscaping', 620 ], 621 iron:[ 622 //'shoring', 623 // 'forming', 624 // 'waterproofing', 625 ] 626 }, 627 // url:"/orin/demolition", 628 title:'Hot Condominiums', 629 loc: 'Mississauga, ON', 630 desc: { 631 landscaping: '4 Towers area completed all hardscape, playground, artificial turf, planting, asphalt paving, concrete curbs, water features, wood fencing on the ground floor and entrance.', 632 //excavating:'Second Project Excavating Description', 633 //civil:'Second Project Civil Description', 634 //shoring:'Supply and install 7 soldier piles, 189 secant piles and 532 filler files for soldier pile, lagging and caisson wall shoring system.', 635 }, 636 //date:'2021', 637 thumb: '/img/projects/Orin-Landscaping/Hot-Condominiums/Hot_Condominiums.jpg', 638 gallery:{ 639 landscaping:[ 640 '/img/projects/Orin-Landscaping/Hot-Condominiums/Hot_Condominiums.jpg', 641 ], 642 } 643 }, 644 'Pier-8-Promenade':{ 645 divisions:{ 646 roni: [ 647 //'excavating' 648 ], 649 orin: [ 650 //'demolition', 651 //'civil', 652 'landscaping', 653 ], 654 iron:[ 655 //'shoring', 656 // 'forming', 657 // 'waterproofing', 658 ] 659 }, 660 // url:"/orin/demolition", 661 title:'Pier 8 Promenade Park', 662 loc: 'Hamilton, ON ', 663 desc: { 664 landscaping: '1.4-hecatres of new park space and is comprised of a 30-meter wide accessible walkway, multiple art installations, a playground, beach and board game areas as well as a performance stage. ', 665 //excavating:'Second Project Excavating Description', 666 //civil:'Second Project Civil Description', 667 //shoring:'Supply and install 7 soldier piles, 189 secant piles and 532 filler files for soldier pile, lagging and caisson wall shoring system.', 668 }, 669 //date:'2021', 670 thumb: '/img/projects/Orin-Landscaping/Pier-8-Promenade/Pier_8_Promenade.jpg', 671 gallery:{ 672 landscaping:[ 673 '/img/projects/Orin-Landscaping/Pier-8-Promenade/Pier_8_Promenade.jpg', 674 ], 675 } 676 }, 677 'Rickard-Neighbourhood-Park':{ 678 divisions:{ 679 roni: [ 680 //'excavating' 681 ], 682 orin: [ 683 //'demolition', 684 //'civil', 685 'landscaping', 686 ], 687 iron:[ 688 //'shoring', 689 // 'forming', 690 // 'waterproofing', 691 ] 692 }, 693 // url:"/orin/demolition", 694 title:'Rickard Neighbourhood Park', 695 loc: 'Clarington, ON', 696 desc: { 697 landscaping: 'Complete build out of Neighbourhood Park in Clarington. ', 698 //excavating:'Second Project Excavating Description', 699 //civil:'Second Project Civil Description', 700 //shoring:'Supply and install 7 soldier piles, 189 secant piles and 532 filler files for soldier pile, lagging and caisson wall shoring system.', 701 }, 702 //date:'2021', 703 thumb: '/img/projects/Orin-Landscaping/Rickard-Neighbourhood-Park/Rickard_Neighbourhood_Park.jpg', 704 gallery:{ 705 landscaping:[ 706 '/img/projects/Orin-Landscaping/Rickard-Neighbourhood-Park/Rickard_Neighbourhood_Park.jpg', 707 ], 708 } 709 }, 710 'Frenchman-Bay-Park':{ 711 divisions:{ 712 roni: [ 713 //'excavating' 714 ], 715 orin: [ 716 //'demolition', 717 //'civil', 718 'landscaping', 719 ], 720 iron:[ 721 //'shoring', 722 // 'forming', 723 // 'waterproofing', 724 ] 725 }, 726 // url:"/orin/demolition", 727 title:"Rotary Frenchman's Bay West Park", 728 loc: 'Pickering, ON ', 729 desc: { 730 landscaping: 'Complete build of waterfront Park included removal of granular, signage debris, fence, posts, trees, understory vegetation removals, topsoil stripping and stockpiling and beach sand stripping and earthworks,
730Coastal and shoreline works. ', 731 //excavating:'Second Project Excavating Description', 732 //civil:'Second Project Civil Description', 733 //shoring:'Supply and install 7 soldier piles, 189 secant piles and 532 filler files for soldier pile, lagging and caisson wall shoring system.', 734 }, 735 //date:'2021', 736 thumb: '/img/projects/Orin-Landscaping/Frenchman-Bay-Park/Frenchman_Bay_Park_2.jpg', 737 gallery:{ 738 landscaping:[ 739 '/img/projects/Orin-Landscaping/Frenchman-Bay-Park/Frenchman_Bay_Park_2.jpg', 740 '/img/projects/Orin-Landscaping/Frenchman-Bay-Park/Frenchman_Bay_Park.jpg', 741 ], 742 } 743 }, 744 'Rouge-Valley-Trail':{ 745 divisions:{ 746 roni: [ 747 //'excavating' 748 ], 749 orin: [ 750 //'demolition', 751 //'civil', 752 'landscaping', 753 ], 754 iron:[ 755 //'shoring', 756 // 'forming', 757 // 'waterproofing', 758 ] 759 }, 760 // url:"/orin/demolition", 761 title:"Rouge Valley Trail", 762 loc: 'Markham, ON', 763 desc: { 764 landscaping: "Completed multi-use trail's asphalt re-paving of a section of pathway and granular pathway extension. Installation of a steel pedestrian bridge crossing is included in the section east of Markham Rd, over Rouge River.", 765 //excavating:'Second Project Excavating Description', 766 //civil:'Second Project Civil Description', 767 //shoring:'Supply and install 7 soldier piles, 189 secant piles and 532 filler files for soldier pile, lagging and caisson wall shoring system.', 768 }, 769 //date:'2021', 770 thumb: '/img/projects/Orin-Landscaping/Rouge-Valley-Trail/Rouge_Valley_Trail.jpg', 771 gallery:{ 772 landscaping:[ 773 '/img/projects/Orin-Landscaping/Rouge-Valley-Trail/Rouge_Valley_Trail.jpg', 774 ], 775 } 776 }, 777 'St-Thomas-Outdoor-Park':{ 778 divisions:{ 779 roni: [ 780 //'excavating' 781 ], 782 orin: [ 783 //'demolition', 784 //'civil', 785 'landscaping', 786 ], 787 iron:[ 788 //'shoring', 789 // 'forming', 790 // 'waterproofing', 791 ] 792 }, 793 // url:"/orin/demolition", 794 title:"St Thomas Outdoor Recreation Sports Park", 795 loc: 'St. Thomas, ON', 796 desc: { 797 landscaping: "Complete build out of a 65-acre sports park including concrete vehicular bridge, steel pedestrian bridge, 2km asphalt road, 7km of asphalt trails, 34 soccer fields, CFL regulation football field with artificial turf, splash pads playgrounds and extensive tree planting. ", 798 //excavating:'Second Project Excavating Description', 799 //civil:'Second Project Civil Description', 800 //shoring:'Supply and install 7 soldier piles, 189 secant piles and 532 filler files for soldier pile, lagging and caisson wall shoring system.', 801 }, 802 //date:'2021', 803 thumb: '/img/projects/Orin-Landscaping/St-Thomas/St_Thomas_Outdoor_Park.jpg', 804 gallery:{ 805 landscaping:[ 806 '/img/projects/Orin-Landscaping/St-Thomas/St_Thomas_Outdoor_Park.jpg', 807 ], 808 } 809 }, 810 'Wetlands':{ 811 divisions:{ 812 roni: [ 813 //'excavating' 814 ], 815 orin: [ 816 //'demolition', 817 //'civil', 818 'landscaping', 819 ], 820 iron:[ 821 //'shoring', 822 // 'forming', 823 // 'waterproofing', 824 ] 825 }, 826 // url:"/orin/demolition", 827 title:"Wetlands", 828 loc: 'Waterfront, Toronto', 829 desc: { 830 landscaping: "Wetland construct and install habitat protection, irrigation system, temporary flooding, planting and seeding of trees, shrubs and mulch. ", 831 //excavating:'Second Project Excavating Description', 832 //civil:'Second Project Civil Description', 833 //shoring:'Supply and install 7 soldier piles, 189 secant piles and 532 filler files for soldier pile, lagging and caisson wall shoring system.', 834 }, 835 //date:'2021', 836 thumb: '/img/projects/Orin-Landscaping/Wetlands/Wetlands.jpg', 837 gallery:{ 838 landscaping:[ 839 '/img/projects/Orin-Landscaping/Wetlands/Wetlands.jpg', 840 '/img/projects/Orin-Landscaping/Wetlands/Wetlands_2.jpg', 841 '/img/projects/Orin-Landscaping/Wetlands/Wetlands_3.jpg', 842 ], 843 } 844 }, 845 846 847 'highland-commons':{ 848 divisions:{ 849 roni: [ 850 //'excavating' 851 ], 852 orin: [ 853 //'demolition', 854 //'civil', 855 // 'landscaping', 856 ], 857 iron:[ 858 'forming', 859 //'shoring', 860 // 'waterproofing', 861 ] 862 }, 863 // url:"/orin/demolition", 864 title:"Highland Commons", 865 loc: 'Scarborough, ON', 866 desc: { 867 forming: 'Formwork and placement of concrete, including placing of concrete, rebar, and precast stairs.', 868 //landscaping: "Wetland construct and install habitat protection, irrigation system, temporary flooding, planting and seeding of trees, shrubs and mulch. ", 869 //excavating:'Second Project Excavating Description', 870 //civil:'Second Project Civil Description', 871 //shoring:'Supply and install 7 soldier piles, 189 secant piles and 532 filler files for soldier pile, lagging and caisson wall shoring system.', 872 }, 873 //date:'2021', 874 thumb: '/img/projects/Iron-Forming/highland-commons/highland-commons.png', 875 gallery:{ 876 forming:[ 877 '/img/projects/Iron-Forming/highland-commons/highland-commons.png', 878 ], 879 } 880 }, 881 'metro-freezer':{ 882 divisions:{ 883 roni: [ 884 //'excavating' 885 ], 886 orin: [ 887 //'demolition', 888 'civil', 889 // 'landscaping', 890 ], 891 iron:[ 892 'forming', 893 //'shoring', 894 // 'waterproofing', 895 ] 896 }, 897 // url:"/orin/demolition", 898 title:"Metro Freezer", 899 loc: 'Etobicoke, ON', 900 desc: { 901 forming: 'Formwork for a parking structure for Metro', 902 civil: 'Storm servicing, sanitary servicing, watermain, road connection, backfill.', 903 }, 904 //date:'2021', 905 thumb: '/img/projects/Iron-Forming/metro-freezer/metro-freezer.png', 906 gallery:{ 907 forming:[ 908 '/img/projects/Iron-Forming/metro-freezer/metro-freezer.png', 909 ], 910 civil:[ 911 '/img/projects/Orin-Civil/Metro-Freezer/metro-freezer.jpg', 912 ], 913 } 914 }, 915 'pinnacle-toronto-east':{ 916 divisions:{ 917 roni: [ 918 //'excavating' 919 ], 920 orin: [ 921 //'demolition', 922 //'civil', 923 // 'landscaping', 924 ], 925 iron:[ 926 'forming', 927 //'shoring', 928 // 'waterproofing', 929 ] 930 }, 931 // url:"/orin/demolition", 932 title:"Pinnacle Toronto East", 933 loc: 'Toronto, ON', 934 desc: { 935 forming: '30, 30, 11 and 3, 3 and 3-storey mixed-use condominium and townhouse buildings with p4 underground parking', 936 }, 937 //date:'2021', 938 thumb: '/img/projects/Iron-Forming/pinnacle-toronto-east/pinnacle-toronto-east-1.png', 939 gallery:{ 940 forming:[ 941 '/img/projects/Iron-Forming/pinnacle-toronto-east/pinnacle-toronto-east-1.png', 942 '/img/projects/Iron-Forming/pinnacle-toronto-east/pinnacle-toronto-east-2.png', 943 ], 944 } 945 }, 946 947 'queen-central-condos':{ 948 divisions:{ 949 roni: [ 950 //'excavating' 951 ], 952 orin: [ 953 //'demolition', 954 //'civil', 955 // 'landscaping', 956 ], 957 iron:[ 958 'forming', 959 //'shoring', 960 // 'waterproofing', 961 ] 962 }, 963 // url:"/orin/demolition", 964 title:"Queen Central Condos", 965 loc: 'Toronto, ON', 966 desc: { 967 forming: '35 storey condominium tower with three levels of underground parking.', 968 }, 969 //date:'2021', 970 thumb: '/img/projects/Iron-Forming/queen-central-condos/queen-central-condos-1.png', 971 gallery:{ 972 forming:[ 973 '/img/projects/Iron-Forming/queen-central-condos/queen-central-condos-1.png', 974 '/img/projects/Iron-Forming/queen-central-condos/queen-central-condos-2.png', 975 ], 976 } 977 }, 978 'stride-condos':{ 979 divisions:{ 980 roni: [ 981 //'excavating' 982 ], 983 orin: [ 984 //'demolition', 985 //'civil', 986 // 'landscaping', 987 ], 988 iron:[ 989 'forming', 990 //'shoring', 991 // 'waterproofing', 992 ] 993 }, 994 // url:"/orin/demolition",
995 title:"Stride Condos", 996 loc: ' Mississauga, ON', 997 desc: { 998 forming: 'Formwork for condo tower 13 storey, seven blocks of townhomes, with 1 level underground parking', 999 }, 1000 //date:'2021', 1001 thumb: '/img/projects/Iron-Forming/stride-condos/stride-condos.png', 1002 gallery:{ 1003 forming:[ 1004 '/img/projects/Iron-Forming/stride-condos/stride-condos.png', 1005 ], 1006 } 1007 }, 1008 'the-clarkson':{ 1009 divisions:{ 1010 roni: [ 1011 //'excavating' 1012 ], 1013 orin: [ 1014 //'demolition', 1015 //'civil', 1016 // 'landscaping', 1017 ], 1018 iron:[ 1019 'forming', 1020 //'shoring', 1021 // 'waterproofing', 1022 ] 1023 }, 1024 // url:"/orin/demolition", 1025 title:"The Clarkson", 1026 loc: ' Mississauga, ON', 1027 desc: { 1028 forming: 'Concrete formwork for two buildings and underground parking.', 1029 }, 1030 //date:'2021', 1031 thumb: '/img/projects/Iron-Forming/the-clarkson/the-clarkson.png', 1032 gallery:{ 1033 forming:[ 1034 '/img/projects/Iron-Forming/the-clarkson/the-clarkson.png', 1035 ], 1036 } 1037 }, 1038 'the-twelve-hundred':{ 1039 divisions:{ 1040 roni: [ 1041 //'excavating' 1042 ], 1043 orin: [ 1044 //'demolition', 1045 //'civil', 1046 // 'landscaping', 1047 ], 1048 iron:[ 1049 'forming', 1050 //'shoring', 1051 // 'waterproofing', 1052 ] 1053 }, 1054 // url:"/orin/demolition", 1055 title:"The Twelve Hundred", 1056 loc: 'Toronto, ON', 1057 desc: { 1058 forming: 'Concrete formwork for an 8 storey mixed used condominium.', 1059 }, 1060 //date:'2021', 1061 thumb: '/img/projects/Iron-Forming/the-twelve-hundred/the-twelve-hundred.png', 1062 gallery:{ 1063 forming:[ 1064 '/img/projects/Iron-Forming/the-twelve-hundred/the-twelve-hundred.png', 1065 ], 1066 } 1067 }, 1068 'vic-towns':{ 1069 divisions:{ 1070 roni: [ 1071 //'excavating' 1072 ], 1073 orin: [ 1074 //'demolition', 1075 //'civil', 1076 // 'landscaping', 1077 ], 1078 iron:[ 1079 'forming', 1080 //'shoring', 1081 // 'waterproofing', 1082 ] 1083 }, 1084 // url:"/orin/demolition", 1085 title:"The Vic Towns", 1086 loc: 'Toronto, ON', 1087 desc: { 1088 forming: 'Townhouses Forming', 1089 }, 1090 //date:'2021', 1091 thumb: '/img/projects/Iron-Forming/vic-towns/vic-towns.png', 1092 gallery:{ 1093 forming:[ 1094 '/img/projects/Iron-Forming/vic-towns/vic-towns.png', 1095 ], 1096 } 1097 }, 1098 'welling-of-whitby':{ 1099 divisions:{ 1100 roni: [ 1101 //'excavating' 1102 ], 1103 orin: [ 1104 //'demolition', 1105 //'civil', 1106 // 'landscaping', 1107 ], 1108 iron:[ 1109 'forming', 1110 //'shoring', 1111 // 'waterproofing', 1112 ] 1113 }, 1114 // url:"/orin/demolition", 1115 title:"Welling of Whitby", 1116 loc: ' Whitby, ON', 1117 desc: { 1118 forming: '19 storey twin towers with 3 level underground parking', 1119 }, 1120 //date:'2021', 1121 thumb: '/img/projects/Iron-Forming/Wellings-of-Whitby/welling-of-whitby-1.png', 1122 gallery:{ 1123 forming:[ 1124 '/img/projects/Iron-Forming/Wellings-of-Whitby/welling-of-whitby-1.png', 1125 '/img/projects/Iron-Forming/Wellings-of-Whitby/welling-of-whitby-2.png', 1126 ], 1127 } 1128 }, 1129 '181-east':{ 1130 divisions:{ 1131 roni: [ 1132 //'excavating' 1133 ], 1134 orin: [ 1135 //'demolition', 1136 //'civil', 1137 // 'landscaping', 1138 ], 1139 iron:[ 1140 //'forming', 1141 //'shoring', 1142 'waterproofing', 1143 ] 1144 }, 1145 // url:"/orin/demolition", 1146 title:"181 East", 1147 loc: 'North York, ON', 1148 desc: { 1149 waterproofing: 'Green Roof, waterproofing, metal flashing, insulation', 1150 }, 1151 //date:'2021', 1152 thumb: '/img/projects/Iron-waterproofing/181-east/181-east.png', 1153 gallery:{ 1154 waterproofing:[ 1155 '/img/projects/Iron-waterproofing/181-east/181-east.png', 1156 ], 1157 } 1158 }, 1159 'no-31':{ 1160 divisions:{ 1161 roni: [ 1162 //'excavating' 1163 ], 1164 orin: [ 1165 //'demolition', 1166 //'civil', 1167 // 'landscaping', 1168 ], 1169 iron:[ 1170 //'forming', 1171 //'shoring', 1172 'waterproofing', 1173 ] 1174 }, 1175 // url:"/orin/demolition", 1176 title:"No. 31 Condos", 1177 loc: 'Toronto, ON', 1178 desc: { 1179 waterproofing: 'Foundation Wall, Garage Deck Waterproofing', 1180 }, 1181 //date:'2021', 1182 thumb: '/img/projects/Iron-waterproofing/no-31/no-31-1.jpg', 1183 gallery:{ 1184 waterproofing:[ 1185 '/img/projects/Iron-waterproofing/no-31/no-31-1.jpg', 1186 '/img/projects/Iron-waterproofing/no-31/no-31-2.jpg', 1187 ], 1188 } 1189 }, 1190 'georgian':{ 1191 divisions:{ 1192 roni: [ 1193 //'excavating' 1194 ], 1195 orin: [ 1196 //'demolition', 1197 //'civil', 1198 // 'landscaping', 1199 ], 1200 iron:[ 1201 //'forming', 1202 //'shoring', 1203 'waterproofing', 1204 ] 1205 }, 1206 // url:"/orin/demolition", 1207 title:"The Georgian", 1208 loc: 'Toronto, ON', 1209 desc: { 1210 waterproofing: 'Below Grade Waterproofing, ground floor deck waterproofing, traffic topping', 1211 }, 1212 //date:'2021', 1213 thumb: '/img/projects/Iron-waterproofing/georgian/georgian.jpg', 1214 gallery:{ 1215 waterproofing:[ 1216 '/img/projects/Iron-waterproofing/georgian/georgian.jpg', 1217 ], 1218 } 1219 }, 1220 1221 'patricia':{ 1222 divisions:{ 1223 roni: [ 1224 //'excavating' 1225 ], 1226 orin: [ 1227 //'demolition', 1228 'civil', 1229 // 'landscaping', 1230 ], 1231 iron:[ 1232 //'forming', 1233 //'shoring', 1234 //'waterproofing', 1235 ] 1236 }, 1237 // url:"/orin/demolition", 1238 title:"Park Place on Patricia", 1239 loc: 'Toronto, ON', 1240 desc: { 1241 civil: 'Site preparation, retaining wall, storm sewers, sanitary sewers, watermain, primary roads, secondary roads.', 1242 }, 1243 //date:'2021', 1244 thumb: '/img/projects/Orin-Civil/patricia/patricia.jpg', 1245 gallery:{ 1246 civil:[ 1247 '/img/projects/Orin-Civil/patricia/patricia.jpg', 1248 ], 1249 } 1250 }, 1251 'sloane-trafford':{ 1252 divisions:{ 1253 roni: [ 1254 //'excavating' 1255 ], 1256 orin: [ 1257 //'demolition', 1258 'civil', 1259 // 'landscaping', 1260 ], 1261 iron:[ 1262 //'forming', 1263 //'shoring', 1264 //'waterproofing', 1265 ] 1266 }, 1267 // url:"/orin/demolition", 1268 title:"The Sloane & The Trafford", 1269 loc: 'Toronto, ON', 1270 desc: { 1271 civil: 'Supply and install sanitary manholes, sanitary sewers, catch basins, asphalt pavements, storm sewer connection, watermains, street signs. ', 1272 }, 1273 //date:'2021', 1274 thumb: '/img/projects/Orin-Civil/sloane-trafford/sloane-trafford.jpg', 1275 gallery:{ 1276 civil:[ 1277 '/img/projects/Orin-Civil/sloane-trafford/sloane-trafford.jpg', 1278 ], 1279 } 1280 }, 1281 'sloane-trafford':{ 1282 divisions:{ 1283 roni: [ 1284 //'excavating' 1285 ], 1286 orin: [ 1287 'demolition', 1288 'civil', 1289 // 'landscaping', 1290 ], 1291 iron:[ 1292 //'forming', 1293 //'shoring', 1294 //'waterproofing', 1295 ] 1296 }, 1297 // url:"/orin/demolition", 1298 title:"The Sloane & The Trafford", 1299 loc: 'Toronto, ON', 1300 desc: { 1301 civil: 'Supply and install sanitary manholes, sanitary sewers, catch basins, asphalt pavements, storm sewer connection, watermains, street signs. ', 1302 demolition: 'Demolition of Holiday Inn buildings with the 2nd highest reach excavator in Canada', 1303 }, 1304 //date:'2021', 1305 thumb: '/img/projects/Orin-Civil/sloane-trafford/sloane-trafford.jpg', 1306 gallery:{ 1307 civil:[ 1308 '/img/projects/Orin-Civil/sloane-trafford/sloane-trafford.jpg', 1309 ], 1310 demolition:[ 1311 '/img/projects/Orin-Demolition/sloane-trafford/sloane-trafford-1.jpg', 1312 '/img/projects/Orin-Demolition/sloane-trafford/sloane-trafford-2.jpg', 1313 ], 1314 } 1315 }, 1316 'westwood-gardens':{ 1317 divisions:{ 1318 roni: [ 1319 //'excavating' 1320 ], 1321 orin: [ 1322 //'demolition', 1323 'civil', 1324 // 'landscaping', 1325 ], 1326 iron:[ 1327 //'forming', 1328 //'shoring', 1329 //'waterproofing', 1330 ] 1331 }, 1332 // url:"/orin/demolition", 1333 title:"Westwood Gardens", 1334 loc: 'Toronto, ON', 1335 desc: { 1336 civil: 'Supply and install sanitary manholes, sanitary sewers, catch basins, asphalt pavements, storm sewer connection, watermains, street signs. ', 1337 }, 1338 //date:'2021', 1339 thumb: '/img/projects/Orin-Civil/westwood-gardens/westwood-gardens-1.jpg', 1340 gallery:{ 1341 civil:[ 1342 '/img/projects/Orin-Civil/westwood-gardens/westwood-gardens-1.jpg', 1343 '/img/projects/Orin-Civil/westwood-gardens/westwood-gardens-2.jpg', 1344 ], 1345 } 1346 }, 1347 1348 '11-yv':{ 1349 divisions:{ 1350 roni: [ 1351 //'excavating' 1352 ], 1353 orin: [ 1354 'demolition', 1355 //'civil', 1356 // 'landscaping', 1357 ], 1358 iron:[ 1359 //'forming', 1360 //'shoring', 1361 //'waterproofing', 1362 ] 1363 }, 1364 // url:"/orin/demolition", 1365 title:"11 Yorkville", 1366 loc: 'Toronto, ON', 1367 desc: { 1368 demolition: 'Demolition of 4 existing buildings including abatement and interior gutting.', 1369 }, 1370 //date:'2021', 1371 thumb: '/img/projects/Orin-Demolition/11-yv/11-yv.jpg', 1372 gallery:{ 1373 demolition:[ 1374 '/img/projects/Orin-Demolition/11-yv/11-yv.jpg', 1375 ], 1376 } 1377 }, 1378 '1845-birchmount':{ 1379 divisions:{ 1380 roni: [ 1381 //'excavating' 1382 ], 1383 orin: [ 1384 'demolition', 1385 //'civil', 1386 // 'landscaping', 1387 ], 1388 iron:[ 1389 //'forming', 1390 //'shoring', 1391 //'waterproofing', 1392 ] 1393 }, 1394 // url:"/orin/demolition", 1395 title:"1845 Birchmount", 1396 loc: 'Toronto, ON', 1397 desc: { 1398 demolition: 'Structural Demolition, Hazardous removals, of the industrial building 278,000 SF.', 1399 }, 1400 //date:'2021', 1401 thumb: '/img/projects/Orin-Demolition/1845-birchmount/1845-birchmount.jpg', 1402 gallery:{ 1403 demolition:[ 1404 '/img/projects/Orin-Demolition/1845-birchmount/1845-birchmount.jpg', 1405 ], 1406 } 1407 }, 1408 '1845-birchmount':{ 1409 divisions:{ 1410 roni: [ 1411 //'excavating' 1412 ], 1413 orin: [ 1414 'demolition', 1415 //'civil', 1416 // 'landscaping', 1417 ], 1418 iron:[ 1419 //'forming', 1420 //'shoring', 1421 //'waterproofing', 1422 ] 1423 }, 1424 // url:"/orin/demolition", 1425 title:"1845 Birchmount", 1426 loc: 'Toronto, ON', 1427 desc: { 1428 demolition: 'Structural Demolition, Hazardous removals, of the industrial building 278,000 SF.', 1429 }, 1430 //date:'2021', 1431 thumb: '/img/projects/Orin-Demolition/1845-birchmount/1845-birchmount.jpg', 1432 gallery:{ 1433 demolition:[ 1434 '/img/projects/Orin-Demolition/1845-birchmount/1845-birchmount.jpg', 1435 ], 1436 } 1437 }, 1438 'first-ave':{ 1439 divisions:{ 1440 roni: [ 1441 //'excavating' 1442 ], 1443 orin: [ 1444 'demolition', 1445 //'civil', 1446 // 'landscaping', 1447 ], 1448 iron:[ 1449 //'forming', 1450 //'shoring', 1451 //'waterproofing', 1452 ] 1453 }, 1454 // url:"/orin/demolition", 1455 title:"First Ave", 1456 loc: 'Oshawa, ON', 1457 desc: { 1458 demolition: 'Demolition of 398,000 sqft existing industrial warehouse located in Oshawa including hazardous removals.', 1459 }, 1460 //date:'2021', 1461 thumb: '/img/projects/Orin-Demolition/first-ave/first-ave.jpg', 1462 gallery:{ 1463 demolition:[ 1464 '/img/projects/Orin-Demolition/first-ave/first-ave.jpg', 1465 ], 1466 } 1467 }, 1468 'Hudson-Bay':{ 1469 divisions:{ 1470 roni: [ 1471 //'excavating' 1472 ], 1473 orin: [ 1474 'demolition', 1475 //'civil', 1476 // 'landscaping', 1477 ], 1478 iron:[ 1479 //'forming', 1480 //'shoring', 1481 //'waterproofing', 1482 ] 1483 }, 1484 // url:"/orin/demolition", 1485 title:"Hudson's Bay Company", 1486 loc: 'Brampton, ON', 1487 desc: { 1488 demolition: "Demolition of former Hudson's Bay Headquarters and CSCB National office commercial buildings.", 1489 }, 1490 //date:'2021', 1491 thumb: '/img/projects/Orin-Demolition/Hudson-Bay/Hudson-Bay-1.jpg', 1492 gallery:{ 1493 demolition:[ 1494 '/img/projects/Orin-Demolition/Hudson-Bay/Hudson-Bay-1.jpg', 1495 '/img/projects/Orin-Demolition/Hudson-Bay/Hudson-Bay-2.jpg', 1496 ], 1497 } 1498 }, 1499 'Line-5-Condos':{ 1500 divisions:{ 1501 roni: [ 1502 //'excavating' 1503 ], 1504 orin: [ 1505 'demolition', 1506 //'civil', 1507 // 'landscaping', 1508 ], 1509 iron:[ 1510 //'forming', 1511 //'shoring', 1512 //'waterproofing', 1513 ] 1514 }, 1515 // url:"/orin/demolition", 1516 title:"Line 5 Condos", 1517 loc: 'Toronto, ON', 1518 desc: { 1519 demolition: "Demolition and abatement of existing houses, two apartment buildings of 3 stories, 10-storey apartment building, removal of interior foundation walls, tree protection, leveling to grade. Disposal off site of debris and proper disposal of spoils generated from abatement work. Recycling of materials.", 1520 }, 1521 //date:'2021', 1522 thumb: '/img/projects/Orin-Demolition/Line-5-Condos/Line-5-Condos-1.jpg', 1523 gallery:{ 1524 demolition:[ 1525 '/img/projects/Orin-Demolition/Line-5-Condos/Line-5-Condos-1.jpg', 1526 '/img/projects/Orin-Demolition/Line-5-Condos/Line-5-Condos-2.jpg', 1527 ], 1528 } 1529 }, 1530 'Luxy':{ 1531 divisions:{ 1532 roni: [ 1533 //'excavating' 1534 ], 1535 orin: [ 1536 'demolition', 1537 //'civil', 1538 // 'landscaping', 1539 ], 1540 iron:[ 1541 //'forming', 1542 //'shoring', 1543 //'waterproofing', 1544 ] 1545 }, 1546 // url:"/orin/demolition", 1547 title:"Former Luxy Nightclub", 1548 loc: 'Vaughan, ON', 1549 desc: { 1550 demolition: "Demolition of existing 2 storey commercial building.", 1551 }, 1552 //date:'2021', 1553 thumb: '/img/projects/Orin-Demolition/luxy/luxy.jpg', 1554 gallery:{ 1555 demolition:[ 1556 '/img/projects/Orin-Demolition/luxy/luxy.jpg', 1557 ], 1558 } 1559 }, 1560 'towns-of-islington':{ 1561 divisions:{ 1562 roni: [ 1563 //'excavating' 1564 ], 1565 orin: [ 1566 'demolition', 1567 //'civil', 1568 // 'landscaping', 1569 ], 1570 iron:[ 1571 //'forming', 1572 //'shoring', 1573 //'waterproofing', 1574 ] 1575 }, 1576 // url:"/orin/demolition", 1577 title:"Towns of Islington Village
1577", 1578 loc: 'Etobicoke, ON', 1579 desc: { 1580 demolition: "Demolition of existing residential homes. ", 1581 }, 1582 //date:'2021', 1583 thumb: '/img/projects/Orin-Demolition/towns-of-islington/towns-of-islington.jpg', 1584 gallery:{ 1585 demolition:[ 1586 '/img/projects/Orin-Demolition/towns-of-islington/towns-of-islington.jpg', 1587 ], 1588 } 1589 }, 1590 'valhalla':{ 1591 divisions:{ 1592 roni: [ 1593 'excavating' 1594 ], 1595 orin: [ 1596 'demolition', 1597 //'civil', 1598 // 'landscaping', 1599 ], 1600 iron:[ 1601 //'forming', 1602 //'shoring', 1603 //'waterproofing', 1604 ] 1605 }, 1606 // url:"/orin/demolition", 1607 title:"Valhalla Town Square", 1608 loc: 'Etobicoke, ON', 1609 desc: { 1610 demolition: "Structural Demolition and hazardous material removal of 3 existing commercial buildings, standing at 6,7 and 9 storey.", 1611 excavating: "Bulk Excavation", 1612 }, 1613 //date:'2021', 1614 thumb: '/img/projects/Orin-Demolition/valhalla/valhalla.jpg', 1615 gallery:{ 1616 demolition:[ 1617 '/img/projects/Orin-Demolition/valhalla/valhalla.jpg', 1618 ], 1619 excavating:[ 1620 '/img/projects/Roni-Excavating/valhalla/valhalla.jpg', 1621 ], 1622 } 1623 }, 1624 'wellesley-station':{ 1625 divisions:{ 1626 roni: [ 1627 //'excavating' 1628 ], 1629 orin: [ 1630 'demolition', 1631 //'civil', 1632 // 'landscaping', 1633 ], 1634 iron:[ 1635 //'forming', 1636 //'shoring', 1637 //'waterproofing', 1638 ] 1639 }, 1640 // url:"/orin/demolition", 1641 title:"Yonge at Wellesley Station", 1642 loc: 'Toronto, ON', 1643 desc: { 1644 demolition: "Structural Demolition and abatement of existing 2.5 and 3-storey buildings. Disposal off site of debris and proper disposal of spoils generated from abatement work. Recycling of materials. ", 1645 }, 1646 //date:'2021', 1647 thumb: '/img/projects/Orin-Demolition/wellesley-station/wellesley-station.jpg', 1648 gallery:{ 1649 demolition:[ 1650 '/img/projects/Orin-Demolition/wellesley-station/wellesley-station.jpg', 1651 ], 1652 } 1653 }, 1654 1655 'yorkwood-condo':{ 1656 divisions:{ 1657 roni: [ 1658 'excavating' 1659 ], 1660 orin: [ 1661 //'demolition', 1662 //'civil', 1663 // 'landscaping', 1664 ], 1665 iron:[ 1666 //'forming', 1667 //'shoring', 1668 //'waterproofing', 1669 ] 1670 }, 1671 // url:"/orin/demolition", 1672 title:"Yorkwood Condo", 1673 loc: 'Toronto, ON', 1674 desc: { 1675 excavating: "Bulk Excavation", 1676 }, 1677 //date:'2021', 1678 thumb: '/img/projects/Roni-Excavating/yorkwood-condo/yorkwood-condo-1.jpg', 1679 gallery:{ 1680 excavating:[ 1681 '/img/projects/Roni-Excavating/yorkwood-condo/yorkwood-condo-1.jpg', 1682 '/img/projects/Roni-Excavating/yorkwood-condo/yorkwood-condo-2.jpg', 1683 ], 1684 } 1685 }, 1686 'yee-hong':{ 1687 divisions:{ 1688 roni: [ 1689 'excavating' 1690 ], 1691 orin: [ 1692 //'demolition', 1693 //'civil', 1694 // 'landscaping', 1695 ], 1696 iron:[ 1697 //'forming', 1698 //'shoring', 1699 //'waterproofing', 1700 ] 1701 }, 1702 // url:"/orin/demolition", 1703 title:"Yee Hong", 1704 loc: 'Toronto, ON', 1705 desc: { 1706 excavating: "Bulk and Detailed Excavation", 1707 }, 1708 //date:'2021', 1709 thumb: '/img/projects/Roni-Excavating/yee-hong/yee-hong-1.jpg', 1710 gallery:{ 1711 excavating:[ 1712 '/img/projects/Roni-Excavating/yee-hong/yee-hong-1.jpg', 1713 '/img/projects/Roni-Excavating/yee-hong/yee-hong-2.jpg', 1714 ], 1715 } 1716 }, 1717 '30-merton':{ 1718 divisions:{ 1719 roni: [ 1720 'excavating' 1721 ], 1722 orin: [ 1723 //'demolition', 1724 //'civil', 1725 // 'landscaping', 1726 ], 1727 iron:[ 1728 //'forming', 1729 //'shoring', 1730 //'waterproofing', 1731 ] 1732 }, 1733 // url:"/orin/demolition", 1734 title:"30 Merton", 1735 loc: 'Toronto, ON', 1736 desc: { 1737 excavating: "Bulk Excavation", 1738 }, 1739 //date:'2021', 1740 thumb: '/img/projects/Roni-Excavating/30-merton/30-merton.jpg', 1741 gallery:{ 1742 excavating:[ 1743 '/img/projects/Roni-Excavating/30-merton/30-merton.jpg', 1744 ], 1745 } 1746 }, 1747 'voya-parkside':{ 1748 divisions:{ 1749 roni: [ 1750 'excavating' 1751 ], 1752 orin: [ 1753 //'demolition', 1754 //'civil', 1755 // 'landscaping', 1756 ], 1757 iron:[ 1758 //'forming', 1759 //'shoring', 1760 //'waterproofing', 1761 ] 1762 }, 1763 // url:"/orin/demolition", 1764 title:"Voya Parkside Block 1W", 1765 loc: 'Mississauga, ON', 1766 desc: { 1767 excavating: "Bulk Excavation", 1768 }, 1769 //date:'2021', 1770 thumb: '/img/projects/Roni-Excavating/voya-parkside/voya-p
1770arkside.jpg', 1771 gallery:{ 1772 excavating:[ 1773 '/img/projects/Roni-Excavating/voya-parkside/voya-parkside.jpg', 1774 ], 1775 } 1776 }, 1777 '1077-enola':{ 1778 divisions:{ 1779 roni: [ 1780 'excavating' 1781 ], 1782 orin: [ 1783 //'demolition', 1784 //'civil', 1785 // 'landscaping', 1786 ], 1787 iron:[ 1788 //'forming', 1789 //'shoring', 1790 //'waterproofing', 1791 ] 1792 }, 1793 // url:"/orin/demolition", 1794 title:"Stride Condos", 1795 loc: 'Mississauga, ON', 1796 desc: { 1797 excavating: "Bulk Excavation", 1798 }, 1799 //date:'2021', 1800 thumb: '/img/projects/Roni-Excavating/1077-enola/1077-enola.jpg', 1801 gallery:{ 1802 excavating:[ 1803 '/img/projects/Roni-Excavating/1077-enola/1077-enola.jpg', 1804 ], 1805 } 1806 }, 1807 'riverside-square':{ 1808 divisions:{ 1809 roni: [ 1810 'excavating' 1811 ], 1812 orin: [ 1813 //'demolition', 1814 //'civil', 1815 // 'landscaping', 1816 ], 1817 iron:[ 1818 //'forming', 1819 //'shoring', 1820 //'waterproofing', 1821 ] 1822 }, 1823 // url:"/orin/demolition", 1824 title:"Riverside Square", 1825 loc: 'Toronto, ON', 1826 desc: { 1827 excavating: "Bulk Excavation", 1828 }, 1829 //date:'2021', 1830 thumb: '/img/projects/Roni-Excavating/riverside-square/riverside-square.jpg', 1831 gallery:{ 1832 excavating:[ 1833 '/img/projects/Roni-Excavating/riverside-square/riverside-square.jpg', 1834 ], 1835 } 1836 }, 1837 '205-queen':{ 1838 divisions:{ 1839 roni: [ 1840 'excavating' 1841 ], 1842 orin: [ 1843 //'demolition', 1844 //'civil', 1845 // 'landscaping', 1846 ], 1847 iron:[ 1848 //'forming', 1849 //'shoring', 1850 //'waterproofing', 1851 ] 1852 }, 1853 // url:"/orin/demolition", 1854 title:"205 Queen St ", 1855 loc: 'Brampton, ON', 1856 desc: { 1857 excavating: "Bulk & detailed excavation", 1858 }, 1859 //date:'2021', 1860 thumb: '/img/projects/Roni-Excavating/205-queen/205-queen-1.jpg', 1861 gallery:{ 1862 excavating:[ 1863 '/img/projects/Roni-Excavating/205-queen/205-queen-1.jpg', 1864 '/img/projects/Roni-Excavating/205-queen/205-queen-2.jpg', 1865 ], 1866 } 1867 }, 1868 1869 1870} 1871 1872
Line numbers count LF bytes from the start of the resource, as the search results do. Vendor segments are library code the classifier recognised; they are stored but not indexed. Bytes are shown as Latin1 characters, one per byte.