1(function(){try{var e=typeof window<"u"?window:typeof global<"u"?global:typeof globalThis<"u"?globalThis:typeof self<"u"?self:{};e.SENTRY_RELEASE={id:"8bad1ef1d1baf20043d4024cccb275075dbee4da"};var t=new e.Error().stack;t&&(e._sentryDebugIds=e._sentryDebugIds||{},e._sentryDebugIds[t]="140036eb-8ec5-4abd-9907-55f6f951d933",e._sentryDebugIdIdentifier="sentry-dbid-140036eb-8ec5-4abd-9907-55f6f951d933")}catch{}})();const i={typeCode:"LG-01",country:"GB",title:"Party Wall Notice",version:6,issueDateField:"noticeDate",steps:[{key:"buildingOwner",label:"Building Owner",title:"Building Owner Details",content:[{kind:"section",key:"ownerDetails",columns:2,fields:[{key:"certRef",type:"text",label:"Certificate reference",placeholder:"e.g. PWN-2025-001"},{key:"noticeDate",type:"date",label:"Date of notice",validation:{required:!0},defaultValue:"today"},{key:"buildingOwnerName",type:"text",label:"Building owner name",validation:{required:!0}},{key:"buildingOwnerAddress",type:"textarea",label:"Building owner address",validation:{required:!0},colSpan:2},{key:"buildingOwnerPhone",type:"text",label:"Phone number"},{key:"buildingOwnerEmail",type:"text",label:"Email address"},{key:"buildingOwnerContact",type:"text",label:"Alternative contact",placeholder:"e.g. Solicitor or agent name and number"}]}]},{key:"adjoiningOwner",label:"Adjoining Owner",title:"Adjoining Owner Details",content:[{kind:"section",key:"adjoiningInfo",columns:1,fields:[{key:"info_adjoining",type:"info",label:"List all owners of adjoining properties affected by the proposed works. Under the Party Wall etc. Act 1996, a separate notice must be served on each adjoining owner."}]},{kind:"repeating",key:"adjoiningOwners",titleTemplate:"Adjoining Owner: {adjoiningOwnerName}",itemLabel:"Adjoining owner",maxItems:10,minItems:1,collapsible:!0,defaultItem:{adjoiningOwnerName:"",adjoiningOwnerAddress:"",adjoiningOwnerPhone:"",adjoiningOwnerEmail:""},sections:[{key:"adjoiningDetails",columns:2,fields:[{key:"adjoiningOwnerName",type:"text",label:"Name",validation:{required:!0}},{key:"adjoiningOwnerAddress",type:"textarea",label:"Address of adjoining property",validation:{required:!0},colSpan:2},{key:"adjoiningOwnerPhone",type:"text",label:"Phone number"},{key:"adjoiningOwnerEmail",type:"text",label:"Email address"}]}]}]},{key:"workDetails",label:"Proposed Work",title:"Details of Proposed Work",content:[{kind:"section",key:"noticeType",columns:2,fields:[{key:"noticeSection",type:"select",label:"Notice type (PWA 1996 section)",validation:{required:!0},options:[{value:"section1",label:"Section 1 â New wall on boundary line"},{value:"section2",label:"Section 2 â Work to existing party wall/structure"},{value:"section6",label:"Section 6 â Excavation near adjoining property"}]},{key:"propertyAddress",type:"textarea",label:"Property where work will take place",validation:{required:!0},colSpan:2}]},{kind:"section",key:"section1Details",title:"Section 1 â New Wall on Boundary Line",columns:1,visibleWhen:{field:"noticeSection",op:"eq",value:"section1"},fields:[{key:"info_section1",type:"info",label:"Section 1 notice: At least 1 month's notice is required before starting work. The adjoining owner may consent to a party wall or require that the wall is built entirely on the building owner's land."},{key:"wallDescription",type:"textarea",label:"Description of proposed wall",validation:{required:!0},placeholder:"Include wall type, height, foundations, position relative to boundary"},{key:"wallType",type:"select",label:"Wall position",options:[{value:"astride",label:"Astr
1ide the boundary (party wall)"},{value:"own_land",label:"Wholly on building owner's land"}]}]},{kind:"section",key:"section2Details",title:"Section 2 â Work to Existing Party Wall or Structure",columns:1,visibleWhen:{field:"noticeSection",op:"eq",value:"section2"},fields:[{key:"info_section2",type:"info",label:"Section 2 works are notified by a Party Structure Notice served under Section 3: at least 2 months' notice is required before starting work. The adjoining owner has 14 days to respond; if no response is received, a dispute is deemed to have arisen."},{key:"partyWallWorkDescription",type:"textarea",label:"Description of proposed work to party wall",validation:{required:!0},placeholder:"e.g. Removal of chimney breast, insertion of beam, raising wall height, cutting into party wall for flashing"},{key:"section2WorkType",type:"select",label:"Type of work",options:[{value:"cutting",label:"Cutting into party wall"},{value:"demolition",label:"Demolition and rebuilding"},{value:"raising",label:"Raising the party wall"},{value:"underpinning",label:"Underpinning the party wall"},{value:"weathering",label:"Weathering / flashing"},{value:"other",label:"Other work to party structure"}]}]},{kind:"section",key:"section6Details",title:"Section 6 â Excavation Near Adjoining Property",columns:2,visibleWhen:{field:"noticeSection",op:"eq",value:"section6"},fields:[{key:"info_section6",type:"info",label:"Section 6 notice: At least 1 month's notice is required (s.6(5)). Applies where excavation is within 3m of an adjoining building and goes below its foundations, or within 6m where it intersects a 45° line drawn from the bottom of the adjoining foundation.",colSpan:2},{key:"excavationDescription",type:"textarea",label:"Description of excavation",colSpan:2,validation:{required:!0},placeholder:"e.g. New basement, underpinning, foundations for extension"},{key:"excavationDepth",type:"text",label:"Depth of excavation",placeholder:"e.g. 2.5m below ground level"},{key:"distanceFromBoundary",type:"text",label:"Distance from adjoining property",placeholder:"e.g. 3m from boundary wall"},{key:"foundationDepth",type:"text",label:"Depth of adjoining foundation (if known)",placeholder:"e.g. 1.0m below ground level"},{key:"section6Subsection",type:"select",label:"Applicable subsection",options:[{value:"6_1",label:"s.6(1) â Within 3m, below adjoining foundations"},{value:"6_2",label:"s.6(2) â Within 6m, intersects 45° line"}]}]},{kind:"section",key:"timing",title:"Timing & Plans",columns:2,fields:[{key:"proposedStartDate",type:"date",label:"Proposed start date",validation:{required:!0},helpText:"Minimum notice: 1 month for Section 1 (line of junction) and Section 6 (excavation); 2 months for Section 2 party-structure works (served as a Section 3 notice)"},{key:"plannedWorkDuration",type:"text",label:"Estimated duration of works",placeholder:"e.g. 6 weeks, 3 months"},{key:"plansReference",type:"text",label:"Plans / drawings reference",placeholder:"e.g. Drawing no. A-101 Rev B",helpText:"Reference to any accompanying plans, sections, or engineering drawings"},{key:"additionalInfo",type:"textarea",label:"Additional information",colSpan:2,placeholder:"Any other relevant details about the proposed works"}]}]},{key:"declaration",label:"Declaration",title:"Declaration & Signature",content:[{kind:"section",key:"counterNoticeInfo",columns:1,fields:[{key:"info_declaration",type:"info",label:"This notice is served under the Party Wall etc. Act 1996. For a party structure notice (section 3) or an adjacent excavation notice (section 6), if the adjoining owner does not consent within 14 days of service, a dispute is deemed to have arisen and surveyors must be appointed (sections 5 and 6(7)). For a line of junction notice (section 1), if the adjoining owner does not consent within 14 days, a wall astride the line cannot be built and may only be built wholly on the building owner's land. A counter notice can be served only in response to a party structure notice, within one month (section 4)."},{key:"info_counterNotice",type:"info",label:"Counter-notice rights: Under Section 4 of the Party Wall etc. Act 1996, an adjoining owner served with a Party Structure Notice (Section 2 works) may, within one month, serve a counter-notice requiring the building owner to carry out additional or modified works for the adjoining owner's convenience. Counter-notices apply only to Party Structure Notices; they cannot be served in response to a Section 1 (line of junction) or Section 6 (excavation) notice."}]},{kind:"section",key:"surveyorSection",title:"Surveyor Appointment",columns:2,fields:[{key:"info_surveyor",type:"info",label:"If a dispute arises (no consent within 14 days to a section 3 or section 6 n
1otice), each party must appoint a surveyor, or the parties may agree on a single agreed surveyor. Record surveyor details below if already appointed.",colSpan:2},{key:"surveyorAppointed",type:"radio-group",label:"Has a surveyor been appointed?",options:[{value:"yes",label:"Yes"},{value:"no",label:"No"}]},{key:"surveyorName",prefillFrom:"engineerName",type:"text",label:"Surveyor name",visibleWhen:{field:"surveyorAppointed",op:"eq",value:"yes"}},{key:"surveyorContact",prefillFrom:"companyPhone",type:"text",label:"Surveyor phone / email",visibleWhen:{field:"surveyorAppointed",op:"eq",value:"yes"}},{key:"surveyorAppointedDate",type:"date",label:"Date appointed",visibleWhen:{field:"surveyorAppointed",op:"eq",value:"yes"}}]},{kind:"section",key:"signatureSection",title:"Signature",columns:1,fields:[{key:"ownerSignature",type:"signature",label:"Building owner signature",validation:{required:!0}},{key:"signatureDate",type:"date",label:"Date",validation:{required:!0},defaultValue:"today"}]}]}],complianceChecklist:{title:"Party Wall Notice Requirements (PWA 1996)",items:[{label:"Building owner identified",field:"buildingOwnerName",expect:{op:"truthy"}},{label:"At least one adjoining owner",field:"adjoiningOwners",expect:{op:"truthy"}},{label:"Notice type selected",field:"noticeSection",expect:{op:"truthy"}},{label:"Property address provided",field:"propertyAddress",expect:{op:"truthy"}},{label:"Proposed start date set (with adequate notice period)",field:"proposedStartDate",expect:{op:"truthy"}},{label:"Owner signature provided",field:"ownerSignature",expect:{op:"truthy"}}]},review:{sections:[{title:"Building Owner",columns:2,fields:[{key:"certRef",label:"Certificate reference"},{key:"noticeDate",label:"Notice date",format:"date"},{key:"buildingOwnerName",label:"Name"},{key:"buildingOwnerAddress",label:"Address"},{key:"buildingOwnerPhone",label:"Phone"},{key:"buildingOwnerEmail",label:"Email"},{key:"buildingOwnerContact",label:"Alternative contact"}]},{key:"adjoiningOwners",titleTemplate:"Adjoining Owner: {adjoiningOwnerName}",sections:[{title:"Adjoining Owner",columns:2,fields:[{key:"adjoiningOwnerName",label:"Name"},{key:"adjoiningOwnerAddress",label:"Address"},{key:"adjoiningOwnerPhone",label:"Phone"},{key:"adjoiningOwnerEmail",label:"Email"}]}]},{title:"Proposed Work",columns:2,fields:[{key:"noticeSection",label:"Notice type",format:"enum"},{key:"propertyAddress",label:"Property"},{key:"wallDescription",label:"Wall description"},{key:"wallType",label:"Wall position",format:"enum"},{key:"partyWallWorkDescription",label:"Party wall work"},{key:"section2WorkType",label:"Type of work",format:"enum"},{key:"excavationDescription",label:"Excavation description"},{key:"excavationDepth",label:"Excavation depth"},{key:"distanceFromBoundary",label:"Distance from boundary"},{key:"foundationDepth",label:"Adjoining foundation depth"},{key:"section6Subsection",label:"Subsection",format:"enum"},{key:"proposedStartDate",label:"Proposed start",format:"date"},{key:"plannedWorkDuration",label:"Estimated duration"},{key:"plansReference",label:"Plans reference"},{key:"additionalInfo",label:"Additional info"}]},{title:"Surveyor",columns:2,fields:[{key:"surveyorAppointed",label:"Surveyor appointed",format:"enum"},{key:"surveyorName",label:"Surveyor name"},{key:"surveyorContact",label:"Surveyor contact"},{key:"surveyorAppointedDate",label:"Date appointed",format:"date"}]},{title:"Signature",columns:2,fields:[{key:"ownerSignature",label:"Signature",format:"signature"},{key:"signatureDate",label:"Date",format:"date"}]}]},pdf:{title:"Party Wall Notice",subtitle:"Party Wall etc. Act 1996",certRefField:"certRef",disclaimer:"This notice was prepared using CertBox from the details entered by the person who signed it, who is responsible for its accuracy. CertBox does not serve it. It has effect only once served on each adjoining owner in a way section 15 of the Party Wall etc. Act 1996 allows.",sections:[{kind:"table",title:"Building Owner",rows:[{label:"Certificate reference",key:"certRef"},{label:"Name",key:"buildingOwnerName"},{label:"Address",key:"buildingOwnerAddress"},{label:"Phone",key:"buildingOwnerPhone"},{label:"Email",key:"buildingOwnerEmail"},{label:"Alternative contact",key:"buildingOwnerContact"},{label:"Notice date",key:"noticeDate",format:"date"}]},{kind:"repeating",key:"adjoiningOwners",title:"Adjoining Owner(s)",columns:[{header:"Name",key:"adjoiningOwnerName"},{header:"Address",key:"adjoiningOwnerAddress"},{header:"Phone",key:"adjoiningOwnerPhone"},{header:"Email",key:"adjoiningOwnerEmail"}]},{kind:"table",title:"Proposed Work",rows:[{label:"Notice type",key:"noticeSection",format:"enum"},{label:"Property",key:"propertyAddress"},{label:"Wall description",key:"wallDescription"},{label:"Wall position",key:"wallType",format:"enum"},{label:"Party wall work",key:"partyWallWorkDescription"},{label:"Type of work",key:"section2WorkType",format:"enum"},{label:"Excavation description",key:"excavationDescription"},{label:"Excavation depth",key:"excavationDepth"},{label:"Distance from boundary",key:"distanceFromBoundary"},{label:"Adjoining foundation depth",key:"foundationDepth"},{label:"Applicable subsection",key:"section6Subsection",format:"enum"},{label:"Proposed start date",key:"proposedStartDate",format:"date"},{label:"Estimated duration",key:"plannedWorkDuration"},{label:"Plans reference",key:"plansReference"},{label:"Additional info",key:"additionalInfo"}]},{kind:"table",title:"Surveyor",rows:[{label:"Surveyor appointed",key:"surveyorAppointed",format:"enum"},{label:"Surveyor name",key:"surveyorName"},{label:"Surveyor contact",key:"surveyorContact"},{label:"Date appointed",key:"surveyorAppointedDate",format:"date"}]},{kind:"signatures",title:"Signature",signatures:[{label:"Building Owner",signatureKey:"ownerSignature",dateKey:"signatureDate",nameKey:"buildingOwnerName"}]}]}};export{i as default};
Line numbers count LF bytes from the start of the resource, as the search results do. Vendor segments are library code the classifier recognised; they are stored but not indexed. Bytes are shown as Latin1 characters, one per byte.