1import{a as o,f as i}from"./BsBeZ0BT.js";import{s as a}from"./XfYi555m.js";import{s,a9 as d,a8 as n,t as u}from"./BmGYDir5.js";const c="/_app/immutable/assets/touch-timegrid.D0yf5JJa.png",h="/_app/immutable/assets/touch-scheduler.Z79dXF8e.png",f={title:"Touch Support in Beta Releases",date:"2016-03-26T08:47:19.000Z",description:`Touch device support has been added to FullCalendar Core and the Scheduler, represented 2by the long-standing issue 994:`},{title:w,date:_,description:v}=f;var p=i(`<p>Touch device support has been added to FullCalendar Core and the <a href="/pricing">Scheduler</a>, represented 3by the long-standing <a href="https://github.com/fullcalendar/fullcalendar/issues/994" rel="nofollow">issue 994</a>:</p> <ul><li>smooth scrolling</li> <li>press-and-hold dragging and resizing of events</li> <li>press-and-hold time range selection</li></ul> <p><strong>UPDATE (4/23/16):</strong> <a href="https://github.com/fullcalendar/fullcalendar/issues/994#issuecomment-213891492" rel="nofollow">this has been officially released!</a></p> <img alt="agenda screenshot" width="257" height="164"/> <h3 id="fullcalendar-core-270-beta">FullCalendar Core 2.7.0-beta</h3> <ul><li><a href="https://github.com/fullcalendar/fullcalendar/releases/tag/v2.7.0-beta" rel="nofollow">Release Notes</a></li> <li><a href="https://github.com/fullcalendar/fullcalendar/releases/download/v2.7.0-beta/fullcalendar-2.7.0-beta.zip" rel="nofollow">Download ZIP</a></li> <li><a href="/js/fullcalendar-2.7.0-beta/demos/selectable.html">View a demo!</a> (use a touch device)</li></ul> <img alt="scheduler example" width="314" height="164"/> <h3 id="fullcalendar-scheduler130-beta">FullCalendar Scheduler 1.3.0-beta</h3> <ul><li><a href="https://github.com/fullcalendar/fullcalendar-workspace/releases/tag/v1.3.0-beta" rel="nofollow">Release Notes</a></li> <li><a href="https://github.com/fullcalendar/fullcalendar-workspace/releases/download/v1.3.0-beta/fullcalendar-scheduler-1.3.0-beta.zip" rel="nofollow">Download ZIP</a></li> <li><a href="/js/fullcalendar-scheduler-1.3.0-beta/demos/selectable.html">View a demo!</a> (use a touch device)</li></ul> <h3 id="bug-reports">Bug Reports</h3> <p>Please post bug reports to the <a href="https://github.com/fullcalendar/fullcalendar/issues" rel="nofollow">Core issue tracker</a>. If 4your issue is specifically related to resources or Timeline view, please use the <a href="https://github.com/fullcalendar/fullcalendar-workspace/issues" rel="nofollow">Scheduler issue tracker</a> instead.</p>`,1);function C(t){var e=p(),l=s(d(e),6),r=s(l,6);n(8),u(()=>{a(l,"src",c),a(r,"src",h)}),o(t,e)}export{C as default,f as metadata};
Line numbers count LF bytes from the start of the resource, as the search results do. Vendor segments are library code the classifier recognised; they are stored but not indexed. Bytes are shown as Latin1 characters, one per byte.