1<!DOCTYPE html> 2<html lang="en-US"><head> 3 <meta charset="utf-8"/> 4 <link rel="dns-prefetch preconnect" href="https://u.jimcdn.com/" crossorigin="anonymous"/> 5<link rel="dns-prefetch preconnect" href="https://assets.jimstatic.com/" crossorigin="anonymous"/> 6<link rel="dns-prefetch preconnect" href="https://image.jimcdn.com" crossorigin="anonymous"/> 7<link rel="dns-prefetch preconnect" href="https://fonts.jimstatic.com" crossorigin="anonymous"/> 8<meta name="viewport" content="width=device-width, initial-scale=1"/> 9<meta http-equiv="X-UA-Compatible" content="IE=edge"/> 10<meta name="description" content=""/> 11<meta name="robots" content="index, follow, archive"/> 12<meta property="st:section" content=""/> 13<meta name="generator" content="Jimdo Creator"/> 14<meta name="twitter:title" content="Articles"/> 15<meta name="twitter:description" content="Quaid-e-Azam Solar Power - Road Map for the Future of Clean Power Generation in Pakistan Muhammad Amjad | Ex-Chief Executive Officer With over 250GWh of energy production after its successful operation over a period of 16 months, Quaid e Azam Solar Power (Pvt.) Ltd. has initiated new era of power production in Pakistan. It was like removing more than 25,000 cars off the road per year, which are polluting our cities, and providing electricity to over 100,000 homes. We have ventured to develop the first 100 MW Solar PV plant in Bahawalpur and by doing so, have engraved the biggest milestone for future growth in solar power sector in Pakistan. From a project in its budding phase to an un-denying reality, Quaid-e-Azam Solar has setup new standards for Pakistan Solar power projects. Building the first project of its kind in Pakistan does not necessarily mean just providing actual data and material to NEPRA resulting in determination of the first solar Tariff, introduction of amendment in new Grid Code and proposing the first EPA (Energy Purchase Agreement), but it also means instilling the understanding of the Solar PV technology among the general public. Like many new technologies solar energy is passing through, three critical phases â Initial development and adoption, disappointment due to lack of knowledge of the technology and finally the maturity stage along with market acceptance. Though, there are many hurdles to tackle but we have reasons to hope for a bright future ahead. Solar generation is part of balanced supply mix and promises energy security where declining fossil fuel cannot. It is paving the way how the future power systems should be built. The conventional mindset in planning is having hard times to understand that intermittent sources will change the future of power generation. As future electricity demands, we will require a faster-acting, flexible and sophisticated grid that maintains high reliability and efficiency while integrating new distributed generation resources that are economical. On ground Quaid-e-Azam Solar Power has not only established its own 100 MW plant but has also paved the way for all the future Solar PV projects in both private and public sectors. Today AEDB has over 1200 MW projects LOIs and Quaid-e-Azam Solar Power Park alone has a capacity of 1000 MW in which 400 MW has already been installed and commissioned. Other Provincial government bodies have been adopting the model setup by Quaid-e-Azam Solar. Baluchistan and FATA are the forerunners who have contacted us for guidance. Even research facilities such as NESCOM have looked up to us for guidance in developing Solar at their own facilities. In order to understand the purpose of Quaid-e-Azam Solar Power and Punjab Government for introducing solar technology and establishing a 100 MW Solar PV plant, we have to look towards the global change in utility and energy generation. Today Pakistan cannot live in a world of isolation as in this time of globalization there are no economic, social and technological islands. In the present world, everything is connected. The reality and fact of the world is that 1% of the daily solar energy is equivalent to all the existing electrical load on earth and harnessing this free clean energy is the goal of every developed country. Germany has installed 40 GW of solar PV and is still installing more even though itâs in a region that has one of the lowest solar potential on earth. Ten years ago installing solar was like flipping a coin, in which one side had high economic impact and the other side had clean energy. However, the tables have turned today as Solar PV not only provides clean energy but is economically beneficial to the end user. According to the McKinsey Quarterly 2008 report the predicted growth in solar market is exponential from year 2005 to year 2020 it can be observed that the global production per GW is even higher than 90GW which was predicted for 2015 (figure 1.2) and stands around 102 GW for 2012. The growth of solar power generation exceeds the predicted growth and shows the promising prospective of solar power generation mainly because mass production has lowered its price and now it is affordable. However, one of the main reasons for exponential growth of particularly Solar PV plants is its easy and quick to construct nature. Quaid-e-Azam Solar power plant alone was constructed within 9 months, which for a plant of its scale is considerably fast. On the other hand, a small hydro or thermal plant can take 1.5 to 2 years to design and build. Reviewing the global perspective, Investment in renewable energy has increased from $273 billion to $285.9 billion from 2014 to 2015. Solar power installed capacity has increased from 177 GW to 227 GW from 2014 to 2015 alone which shows that global growth trends of renewable energy are increasingly high. Accordingly, Coal continues to decline for electricity generation worldwide. Coal-fired generation, which accounted for 40% of total world electricity generation in 2012, declining to 29% of the total in 2040 in the Reference case. Renewables account for a rising share of the worldâs total electricity supply, and they are the fastest growing source of electricity generation in the IEO 2016 Reference case. Total generation from renewable resources increases by 2.9%/year, as the renewable share of world electricity generation grows from 22% in 2012 to 29%. Generation from non-hydropower renewables is the predominant source of the increase, rising by an average of 5.7%/year and outpacing increases in natural gas (2.7%/year), nuclear (2.4%/year), and coal (0.8%/year), even without taking into account the growth in renewable generation anticipated under the Clean Power Plan in the United States. All the above is showing that a step towards renew
15able energy particularly solar power is the most logical thing to do for Pakistan. Growth in every sector is based on its positive impact on the economy of the country. One third of Pakistanâs total import is comprised of Crude Oil (approx. $ 6.69 billion annually), according to statistics approximately 70% of our installed power generation capacity is based on fossil fuel that is being imported for power generation. Our Natural Gas reserves are depleting at an increasing rate, while our power demand is increasing day by day. Solar power uses sun as fuel and is independent from fossil fuel consumption that is why having solar power would mean lower fossil fuel imports and higher GDP. Today the crude oil prices of the world have fallen below 50% of what it once stood in 2008. However, the recent trends show a gradual increase in crude oil prices, OPEC is convening new meetings to increase the oil pries even further. In such a scenario it is but inevitable that the price of crude oil will increase and our reliability on it will cost the country billions of dollars in revenue loss. The most detrimental effect that any developing economy can face is lack of sufficient power. The energy crisis which Pakistan faced escalated during 2005 â 2006 due to the insufficient installed capacity, the power shortfall was 2,645 MW in 2007, and within a year this power outage went up to 30 percent between 2008 and 2009. The shortfall kept increasing till 6,151 MW in 2011. Furthermore, the shortfall is expected to increase by 8,000 MW in 2017 and 13,000 MW by 2020, according to some estimates. The only solution to overcome such sharp increase in power shortfall is to install reliable cheap power at a fast rate for which, this solar PV technology is the key. Quaid-e-Azam Solar Power Plant is located in Lal-Suhanrah Park Bahawalpur and covers an area of 500 acres of land. Quaid-e-Azam Solar Power is based on Photovoltaic Polycrystalline technology which is a robust highly recommended technology for desert areas where the power plant has a life of 25 years and above. It uses fixed tilted mounting architecture and the power plant is designed at 100 MWp DC at Standard Testing Conditions (STC). There are 392,160 255 W PV Modules, 200 inverters, 100 33kV step-up transformers and a substation with state of the art line protection system. All power from Solar PV plant is evacuated via 132 kV Bus to MEPCO, which is then supplied to all over the country. Every renewable energy power plant constructed has been given an initial energy target by NEPRA and CPPA for an annual energy production. Quaid-e-Azam Solar Power was also given an initial target of 153,300 MWh for the first year, which Quaid-e-Azam Solar power not only achieved but surpassed by 4.43% (i.e. 160,088 MWh produced). On October 12, 2013, the Economist published an interesting research report on European electrical utilities âHow to lose half a trillion euro â Europeâs electricity providers face an existential threat.â The report highlighted how utility companies are losing millions by mismanaging electricity flow from renewable energy plants and losing valuable energy. We here at Quaid-e-Azam Solar have the expertise and the advantage of being the pioneers in the field of large scale renewables in Pakistan, having the vision to select the prime technologies that are not only feasible but reliable and will, in future, prevent power utilities from facing substantial losses. Quaid-e-Azam Solar has a vision to develop sustainable and self-sufficient micro girds with solar power systems that will in future someday become the model for self-sustaining cities. Implementation of such plans requires leadership, solid base, research, discipline and good will. For this Quaid-e-Azam Solar Power is getting ISO certification and has registered for CDM carbon credits. Why ISO? is a question that some professionals have in their mind. The reason is that for Quaid-e-Azam Solar to achieve its goals it has to centralize and organize its system perfectly and ISO 9001 and other related standards such as ISO 14001 and OHSAS 18001 provides the platform to do just that. At Quaid-e-Azam Solar Power, we aim to resolve problems before they occur. Our goal is energy security and reliability, energy innovation, energy s
15aving, capital cost avoidance, reducing climate risks, development of green economy and greater penetration of distributed generation. Together, we look forward in developing sustainable power system of the future that is economical, modern, flexible and clean."/> 16<meta name="twitter:card" content="summary_large_image"/> 17<meta property="og:url" content="http://www.qasolar.com/gallery/articles/"/> 18<meta property="og:title" content="Articles"/> 19<meta property="og:description" content="Quaid-e-Azam Solar Power - Road Map for the Future of Clean Power Generation in Pakistan Muhammad Amjad | Ex-Chief Executive Officer With over 250GWh of energy production after its successful operation over a period of 16 months, Quaid e Azam Solar Power (Pvt.) Ltd. has initiated new era of power production in Pakistan. It was like removing more than 25,000 cars off the road per year, which are polluting our cities, and providing electricity to over 100,000 homes. We have ventured to develop the first 100 MW Solar PV plant in Bahawalpur and by doing so, have engraved the biggest milestone for future growth in solar power sector in Pakistan. From a project in its budding phase to an un-denying reality, Quaid-e-Azam Solar has setup new standards for Pakistan Solar power projects. Building the first project of its kind in Pakistan does not necessarily mean just providing actual data and material to NEPRA resulting in determination of the first solar Tariff, introduction of amendment in new Grid Code and proposing the first EPA (Energy Purchase Agreement), but it also means instilling the understanding of the Solar PV technology among the general public. Like many new technologies solar energy is passing through, three critical phases â Initial development and adoption, disappointment due to lack of knowledge of the technology and finally the maturity stage along with market acceptance. Though, there are many hurdles to tackle but we have reasons to hope for a bright future ahead. Solar generation is part of balanced supply mix and promises energy security where declining fossil fuel cannot. It is paving the way how the future power systems should be built. The conventional mindset in planning is having hard times to understand that intermittent sources will change the future of power generation. As future electricity demands, we will require a faster-acting, flexible and sophisticated grid that maintains high reliability and efficiency while integrating new distributed generation resources that are economical. On ground Quaid-e-Azam Solar Power has not only established its own 100 MW plant but has also paved the way for all the future Solar PV projects in both private and public sectors. Today AEDB has over 1200 MW projects LOIs and Quaid-e-Azam Solar Power Park alone has a capacity of 1000 MW in which 400 MW has already been installed and commissioned. Other Provincial government bodies have been adopting the model setup by Quaid-e-Azam Solar. Baluchistan and FATA are the forerunners who have contacted us for guidance. Even research facilities such as NESCOM have looked up to us for guidance in developing Solar at their own facilities. In order to understand the purpose of Quaid-e-Azam Solar Power and Punjab Government for introducing solar technology and establishing a 100 MW Solar PV plant, we have to look towards the global change in utility and energy generation. Today Pakistan cannot live in a world of isolation as in this time of globalization there are no economic, social and technological islands. In the present world, everything is connected. The reality and fact of the world is that 1% of the daily solar energy is equivalent to all the existing electrical load on earth and harnessing this free clean energy is the goal of every developed country. Germany has installed 40 GW of solar PV and is still installing more even though itâs in a region that has one of the lowest solar potential on earth. Ten years ago installing solar was like flipping a coin, in which one side had high economic impact and the other side had clean energy. However, the tables have turned today as Solar PV not only provides clean energy but is economically beneficial to the end user. According to the McKinsey Quarterly 2008 report the predicted growth in solar market is exponential from year 2005 to year 2020 it can be observed that the global production per GW is even higher than 90GW which was predicted for 2015 (figure 1.2) and stands around 102 GW for 2012. The growth of solar power generation exceeds the predicted growth and shows the promising prospective of solar power generation mainly because mass production has lowered its price and now it is affordable. However, one of the main reasons for exponential growth of particularly Solar PV plants is its easy and quick to construct nature. Quaid-e-Azam Solar power plant alone was constructed within 9 months, which for a plant of its scale is considerably fast. On the other hand, a small hydro or thermal plant can take 1.5 to 2 years to design and build. Reviewing the global perspective, Investment in renewable energy has increased from $273 billion to $285.9 billion from 2014 to 2015. Solar power installed capacity has increased from 177 GW to 227 GW from 2014 to 2015 alone which shows that global growth trends of renewable energy are increasingly high. Accordingly, Coal continues to decline for electricity generation worldwide. Coal-fired generation, which accounted for 40% of total world electricity generation in 2012, declining to 29% of the total in 2040 in the Reference case. Renewables account for a rising share of the worldâs total electricity supply, and they are the fastest growing source of electricity generation in the IEO 2016 Reference case. Total generation from renewable resources increases by 2.9%/year, as the renewable share of world electricity generation grows from 22% in 2012 to 29%. Generation from non-hydropower renewables is the predominant source of the increase, rising by an average of 5.7%/year and outpacing increases in natural gas (2.7%/year), nuclear (2.4%/year), and coal (0.8%/year), even without taking into account the growth in renewable generation anticipated under the Clean Power Plan in the United States. All the above is showing that a step towards renew
19able energy particularly solar power is the most logical thing to do for Pakistan. Growth in every sector is based on its positive impact on the economy of the country. One third of Pakistanâs total import is comprised of Crude Oil (approx. $ 6.69 billion annually), according to statistics approximately 70% of our installed power generation capacity is based on fossil fuel that is being imported for power generation. Our Natural Gas reserves are depleting at an increasing rate, while our power demand is increasing day by day. Solar power uses sun as fuel and is independent from fossil fuel consumption that is why having solar power would mean lower fossil fuel imports and higher GDP. Today the crude oil prices of the world have fallen below 50% of what it once stood in 2008. However, the recent trends show a gradual increase in crude oil prices, OPEC is convening new meetings to increase the oil pries even further. In such a scenario it is but inevitable that the price of crude oil will increase and our reliability on it will cost the country billions of dollars in revenue loss. The most detrimental effect that any developing economy can face is lack of sufficient power. The energy crisis which Pakistan faced escalated during 2005 â 2006 due to the insufficient installed capacity, the power shortfall was 2,645 MW in 2007, and within a year this power outage went up to 30 percent between 2008 and 2009. The shortfall kept increasing till 6,151 MW in 2011. Furthermore, the shortfall is expected to increase by 8,000 MW in 2017 and 13,000 MW by 2020, according to some estimates. The only solution to overcome such sharp increase in power shortfall is to install reliable cheap power at a fast rate for which, this solar PV technology is the key. Quaid-e-Azam Solar Power Plant is located in Lal-Suhanrah Park Bahawalpur and covers an area of 500 acres of land. Quaid-e-Azam Solar Power is based on Photovoltaic Polycrystalline technology which is a robust highly recommended technology for desert areas where the power plant has a life of 25 years and above. It uses fixed tilted mounting architecture and the power plant is designed at 100 MWp DC at Standard Testing Conditions (STC). There are 392,160 255 W PV Modules, 200 inverters, 100 33kV step-up transformers and a substation with state of the art line protection system. All power from Solar PV plant is evacuated via 132 kV Bus to MEPCO, which is then supplied to all over the country. Every renewable energy power plant constructed has been given an initial energy target by NEPRA and CPPA for an annual energy production. Quaid-e-Azam Solar Power was also given an initial target of 153,300 MWh for the first year, which Quaid-e-Azam Solar power not only achieved but surpassed by 4.43% (i.e. 160,088 MWh produced). On October 12, 2013, the Economist published an interesting research report on European electrical utilities âHow to lose half a trillion euro â Europeâs electricity providers face an existential threat.â The report highlighted how utility companies are losing millions by mismanaging electricity flow from renewable energy plants and losing valuable energy. We here at Quaid-e-Azam Solar have the expertise and the advantage of being the pioneers in the field of large scale renewables in Pakistan, having the vision to select the prime technologies that are not only feasible but reliable and will, in future, prevent power utilities from facing substantial losses. Quaid-e-Azam Solar has a vision to develop sustainable and self-sufficient micro girds with solar power systems that will in future someday become the model for self-sustaining cities. Implementation of such plans requires leadership, solid base, research, discipline and good will. For this Quaid-e-Azam Solar Power is getting ISO certification and has registered for CDM carbon credits. Why ISO? is a question that some professionals have in their mind. The reason is that for Quaid-e-Azam Solar to achieve its goals it has to centralize and organize its system perfectly and ISO 9001 and other related standards such as ISO 14001 and OHSAS 18001 provides the platform to do just that. At Quaid-e-Azam Solar Power, we aim to resolve problems before they occur. Our goal is energy security and reliability, energy innovation, energy s
19aving, capital cost avoidance, reducing climate risks, development of green economy and greater penetration of distributed generation. Together, we look forward in developing sustainable power system of the future that is economical, modern, flexible and clean."/> 20<meta property="og:type" content="website"/> 21<meta property="og:locale" content="en_US"/> 22<meta property="og:site_name" content="QASP"/> 23<meta name="twitter:image" content="https://image.jimcdn.com/app/cms/image/transf/none/path/sa1a4b303052e8a1a/backgroundarea/i5099f837107e698a/version/1501495456/image.jpg"/> 24<meta property="og:image" content="https://image.jimcdn.com/app/cms/image/transf/none/path/sa1a4b303052e8a1a/backgroundarea/i5099f837107e698a/version/1501495456/image.jpg"/> 25<meta property="og:image:width" content="2000"/> 26<meta property="og:image:height" content="1500"/> 27<meta property="og:image:secure_url" content="https://image.jimcdn.com/app/cms/image/transf/none/path/sa1a4b303052e8a1a/backgroundarea/i5099f837107e698a/version/1501495456/image.jpg"/><title>Articles - QASP</title> 28<link rel="shortcut icon" href="https://u.jimcdn.com/cms/o/sa1a4b303052e8a1a/img/favicon.png?t=1416399282"/> 29 <link rel="alternate" type="application/rss+xml" title="Blog" href="https://www.qasolar.com/rss/blog"/> 30<link rel="canonical" href="https://www.qasolar.com/gallery/articles/"/> 31 32
32<script src="https://assets.jimstatic.com/ckies.js.c52961c41c57a9b4f804.js"></script>
32 33 34
34<script src="https://assets.jimstatic.com/cookieControl.js.0c7250f3957d0aebc70e.js"></script>
34 35
35<script>window.CookieControlSet.setToOff();</script>
35 36 37 <style>html,body{margin:0}.hidden{display:none}.n{padding:5px}#cc-website-title a {text-decoration: none}.cc-m-image-align-1{text-align:left}.cc-m-image-align-2{text-align:right}.cc-m-image-align-3{text-align:center}</style> 38 39 <link href="https://u.jimcdn.com/cms/o/sa1a4b303052e8a1a/layout/dm_46a7d7f2fea327ac33be86eba465ca77/css/layout.css?t=1780378207" rel="stylesheet" type="text/css" id="jimdo_layout_css"/>
40<script> /* <![CDATA[ */ /*! loadCss [c]2014 @scottjehl, Filament Group, Inc. Licensed MIT */ window.loadCSS = window.loadCss = function(e,n,t){var r,l=window.document,a=l.createElement("link");if(n)r=n;else{var i=(l.body||l.getElementsByTagName("head")[0]).childNodes;r=i[i.length-1]}var o=l.styleSheets;a.rel="stylesheet",a.href=e,a.media="only x",r.parentNode.insertBefore(a,n?r:r.nextSibling);var d=function(e){for(var n=a.href,t=o.length;t--;)if(o[t].href===n)return e.call(a);setTimeout(function(){d(e)})};return a.onloadcssdefined=d,d(function(){a.media=t||"all"}),a}; window.onloadCSS = function(n,o){n.onload=function(){n.onload=null,o&&o.call(n)},"isApplicationInstalled"in navigator&&"onloadcssdefined"in n&&n.onloadcssdefined(o)} /* ]]> */ </script>
40
40<script> 41// <![CDATA[ 42onloadCSS(loadCss('https://assets.jimstatic.com/web.css.137308a2cdb494ac143f.css') , function() { 43 this.id = 'jimdo_web_css'; 44}); 45// ]]> 46</script>
46 47<link href="https://assets.jimstatic.com/web.css.137308a2cdb494ac143f.css" rel="preload" as="style"/> 48<noscript> 49<link href="https://assets.jimstatic.com/web.css.137308a2cdb494ac143f.css" rel="stylesheet"/> 50</noscript> 51
51<script> 52 //<![CDATA[ 53 var jimdoData = {"isTestserver":false,"isLcJimdoCom":false,"isJimdoHelpCenter":false,"isProtectedPage":false,"cstok":"","cacheJsKey":"e1a60b56bc4fd7ee71f77423bdcc6468fe3c0f29","cacheCssKey":"e1a60b56bc4fd7ee71f77423bdcc6468fe3c0f29","cdnUrl":"https:\/\/assets.jimstatic.com\/","minUrl":"https:\/\/assets.jimstatic.com\/app\/cdn\/min\/file\/","authUrl":"https:\/\/a.jimdo.com\/","webPath":"https:\/\/www.qasolar.com\/","appUrl":"https:\/\/a.jimdo.com\/","cmsLanguage":"en_US","isFreePackage":false,"mobile":false,"isDevkitTemplateUsed":true,"isTemplateResponsive":true,"websiteId":"sa1a4b303052e8a1a","pageId":2136593099,"packageId":3,"shop":{"deliveryTimeTexts":{"1":"Ships within 1-3 days","2":"Ships within 3-5 days","3":"Delivery in 5-8 days"},"checkoutButtonText":"Check out","isReady":false,"currencyFormat":{"pattern":"\u00a4#,##0.00","convertedPattern":"$#,##0.00","symbols":{"GROUPING_SEPARATOR":",","DECIMAL_SEPARATOR":".","CURRENCY_SYMBOL":"$"}},"currencyLocale":"en_US"},"tr":{"gmap":{"searchNotFound":"The entered address doesn't exist or couldn't be found.","routeNotFound":"The driving directions couldn't be determined. Possible reasons: The starting address is not specific enough or it is too far from the destination address."},"shop":{"checkoutSubmit":{"next":"Next step","wait":"Please wait"},"paypalError":"An error has occurred. Please try again!","cartBar":"Go to Shopping Cart","maintenance":"Sorry, this store is not available at the moment. Please try again later.","addToCartOverlay":{"productInsertedText":"This item was added to your cart.","continueShoppingText":"Continue shopping","reloadPageText":"Refresh"},"notReadyText":"This store has not been completely set up.","numLeftText":"There are not more than {:num} of this item available at this time.","oneLeftText":"There is only one more of this item available."},"common":{"timeout":"Oops, it looks like there's been an error on our end and your last change didn't go through. Please try again in a minute. "},"form":{"badRequest":"An error has occurred! This form could not be submitted. Please try again later."}},"jQuery":"jimdoGen002","isJimdoMobileApp":false,"bgConfig":{"id":80295999,"type":"picture","options":{"fixed":true},"images":[{"id":7713028099,"url":"https:\/\/image.jimcdn.com\/app\/cms\/image\/transf\/none\/path\/sa1a4b303052e8a1a\/backgroundarea\/i5099f837107e698a\/version\/1501495456\/image.jpg","altText":"","focalPointX":49.0954742432000017515747458674013614654541015625,"focalPointY":56.035535475800003268886939622461795806884765625}]},"bgFullscreen":true,"responsiveBreakpointLandscape":767,"responsiveBreakpointPortrait":480,"copyableHeadlineLinks":false,"tocGeneration":false,"googlemapsConsoleKey":false,"loggingForAnalytics":false,"loggingForPredefinedPages":false,"isFacebookPixelIdEnabled":false,"userAccountId":"f19e0dcb-2b99-4a46-885c-ad9060c0d226"}; 54 // ]]> 55</script>
55 56 57
57<script> (function(window) { 'use strict'; var regBuff = window.__regModuleBuffer = []; var regModuleBuffer = function() { var args = [].slice.call(arguments); regBuff.push(args); }; if (!window.regModule) { window.regModule = regModuleBuffer; } })(window); </script>
57 58
58<script src="https://assets.jimstatic.com/web.js.1c7aa4844e3d404e92d5.js" async="true"></script>
58 59
59<script src="https://assets.jimstatic.com/at.js.619d00f8aa071522cb43.js"></script>
59 60<meta name="google-site-verification" content="bUZVPGoqxmBy1ir4SKyvqed6xFQ_jEpz7BWOy7Ux5a4"/> 61
62<script src="//ajax.googleapis.com/ajax/libs/jquery/2.1.1/jquery.min.js" type="text/javascript"> 63</script>
63 64
65<script type="text/javascript" src="https://widgetic.com/sdk/sdk.js"> 66</script>
66 67
68<script type="text/javascript" src="https://www.google.com/jsapi"> 69</script>
69 70
71<script type="text/javascript"> 72//<![CDATA[ 73 74 // Load the Visualization API and the piechart package. 75 google.load('visualization', '1.0', {'packages':['corechart']}); 76 77 // Set a callback to run when the Google Visualization API is loaded. 78 google.setOnLoadCallback(drawChart); 79 80 // Callback that creates and populates a data table, 81 // instantiates the pie chart, passes in the data and 82 // draws it. 83 function drawChart() { 84 85 // Create the data table. 86 var data = new google.visualization.DataTable(); 87 data.addColumn('string', 'Topping'); 88 data.addColumn('number', 'Slices'); 89 data.addRows([ 90 ['Mushrooms', 3], 91 ['Onions', 1], 92 ['Olives', 1], 93 ['Zucchini', 1], 94 ['Pepperoni', 2] 95 ]); 96 97 // Set chart options 98 var options = {'title':'How Much Pizza I Ate Last Night', 99 'width':400, 100 'height':300}; 101 102 // Instantiate and draw our chart, passing in some options. 103 var chart = new google.visualization.PieChart(document.getElementById('chart_div')); 104 chart.draw(data, options); 105 } 106//]]> 107</script>
107 108 109 110</head> 111 112<body class="body cc-page j-m-gallery-styles j-m-video-styles j-m-hr-styles j-m-header-styles j-m-text-styles j-m-emotionheader-styles j-m-htmlCode-styles j-m-rss-styles j-m-form-styles-disabled j-m-table-styles j-m-textWithImage-styles j-m-downloadDocument-styles j-m-imageSubtitle-styles j-m-flickr-styles j-m-googlemaps-styles j-m-blogSelection-styles-disabled j-m-comment-styles-disabled j-m-jimdo-styles j-m-profile-styles j-m-guestbook-styles j-m-promotion-styles j-m-twitter-styles j-m-hgrid-styles j-m-shoppingcart-styles j-m-catalog-styles j-m-product-styles-disabled j-m-facebook-styles j-m-sharebuttons-styles j-m-formnew-styles-disabled j-m-callToAction-styles j-m-turbo-styles j-m-spacing-styles j-m-googleplus-styles j-m-dummy-styles j-m-search-styles j-m-booking-styles j-m-socialprofiles-styles j-m-section-styles j-footer-styles cc-pagemode-default cc-content-parent" id="page-2136593099"> 113 114<div id="cc-inner" class="cc-content-parent"> 115 <input type="checkbox" id="jtpl-navigation__checkbox" class="jtpl-navigation__checkbox"/><!-- _main.sass --><div class="jtpl-main cc-content-parent"> 116 117 <!-- _background-area.sass --> 118 <div class="jtpl-background-area" background-area="fullscreen"></div> 119 <!-- END _background-area.sass --> 120 121 <!-- _cart.sass --> 122 <div class="jtpl-cart"> 123 124 </div> 125 <!-- END _cart.sass --> 126 127 <!-- _header.sass --> 128 <header class="jtpl-header navigation-colors"><div class="jtpl-topbar-section navigation-vertical-alignment"> 129 <div class="jtpl-logo"> 130 <div id="cc-website-logo" class="cc-single-module-element"><div id="cc-m-11796740999" class="j-module n j-imageSubtitle"><div class="cc-m-image-container"><figure class="cc-imagewrapper cc-m-image-align-3"> 131<a href="https://www.qasolar.com/" target="_self"><img srcset="https://image.jimcdn.com/app/cms/image/transf/dimension=145x10000:format=png/path/sa1a4b303052e8a1a/image/i730245ca993b7a2e/version/1573801367/image.png 145w, https://image.jimcdn.com/app/cms/image/transf/dimension=290x10000:format=png/path/sa1a4b303052e8a1a/image/i730245ca993b7a2e/version/1573801367/image.png 290w" sizes="(min-width: 145px) 145px, 100vw" id="cc-m-imagesubtitle-image-11796740999" src="https://image.jimcdn.com/app/cms/image/transf/dimension=145x10000:format=png/path/sa1a4b303052e8a1a/image/i730245ca993b7a2e/version/1573801367/image.png" alt="QASP" class="" data-src-width="821" data-src-height="321" data-src="https://image.jimcdn.com/app/cms/image/transf/dimension=145x10000:format=png/path/sa1a4b303052e8a1a/image/i730245ca993b7a2e/version/1573801367/image.png" data-image-id="7710224799"/></a> 132 133</figure> 134</div> 135<div class="cc-clear"></div>
136<script id="cc-m-reg-11796740999">// <![CDATA[ 137 138 window.regModule("module_imageSubtitle", {"data":{"imageExists":true,"hyperlink":"","hyperlink_target":"","hyperlinkAsString":"","pinterest":"0","id":11796740999,"widthEqualsContent":"0","resizeWidth":"145","resizeHeight":57},"id":11796740999}); 139// ]]> 140</script>
140</div></div> 141 </div> 142 143 <!-- _navigation.sass --> 144 <div class="jtpl-navigation"> 145 <nav><div data-container="navigation"><div class="j-nav-variant-nested"><ul class="cc-nav-level-0 j-nav-level-0"><li id="cc-nav-view-1805724199" class="jmd-nav__list-item-0"><a href="/" data-link-title="Home">Home</a></li><li id="cc-nav-view-1805724299" class="jmd-nav__list-item-0"><a href="/about-1/" data-link-title="About">About</a></li><li id="cc-nav-view-1936585499" class="jmd-nav__list-item-0"><a href="/the-team/" data-link-title="The Team">The Team</a></li><li id="cc-nav-view-2285071899" class="jmd-nav__list-item-0"><a href="/tenders/" data-link-title="Tenders">Tenders</a></li><li id="cc-nav-view-2285074299" class="jmd-nav__list-item-0 j-nav-has-children"><a href="/download/" data-link-title="Download">Download</a><span data-navi-toggle="cc-nav-view-2285074299" class="jmd-nav__toggle-button"></span></li><li id="cc-nav-view-1807074399" class="jmd-nav__list-item-0 j-nav-has-children"><a href="/jobs/" data-link-title="Jobs">Jobs</a><span data-navi-toggle="cc-nav-view-1807074399" class="jmd-nav__toggle-button"></span></li><li id="cc-nav-view-1936645199" class="jmd-nav__list-item-0 j-nav-has-children cc-nav-parent j-nav-parent jmd-nav__item--parent"><a href="/gallery/" data-link-title="Gallery">Gallery</a><span data-navi-toggle="cc-nav-view-1936645199" class="jmd-nav__toggle-button"></span></li><li id="cc-nav-view-1805724399" class="jmd-nav__list-item-0"><a href="/contact-us/" data-link-title="Contact Us">Contact Us</a></li></ul></div></div> 146 </nav> 147</div> 148 <!-- END _navigation.sass --> 149 150 <!-- _mobile-navigation.sass --> 151 <label for="jtpl-navigation__checkbox" class="jtpl-navigation__label navigation-colors__menu-icon"> 152 <span class="jtpl-navigation__borders navigation-colors__menu-icon"></span> 153 </label> 154 <div class="jtpl-mobile-navigation navigation-colors"> 155 <div data-container="navigation"><div class="j-nav-variant-nested"><ul class="cc-nav-level-0 j-nav-level-0"><li id="cc-nav-view-1805724199" class="jmd-nav__list-item-0"><a href="/" data-link-title="Home">Home</a></li><li id="cc-nav-view-1805724299" class="jmd-nav__list-item-0"><a href="/about-1/" data-link-title="About">About</a></li><li id="cc-nav-view-1936585499" class="jmd-nav__list-item-0"><a href="/the-team/" data-link-title="The Team">The Team</a></li><li id="cc-nav-view-2285071899" class="jmd-nav__list-item-0"><a href="/tenders/" data-link-title="Tenders">Tenders</a></li><li id="cc-nav-view-2285074299" class="jmd-nav__list-item-0 j-nav-has-children"><a href="/download/" data-link-title="Download">Download</a><span data-navi-toggle="cc-nav-view-2285074299" class="jmd-nav__toggle-button"></span><ul class="cc-nav-level-1 j-nav-level-1"><li id="cc-nav-view-2258730099" class="jmd-nav__list-item-1"><a href="/download/annual-reports/" data-link-title="Annual Reports">Annual Reports</a></li><li id="cc-nav-view-2014566399" class="jmd-nav__list-item-1"><a href="/download/cm-press-conference-on-solar-09-09-2015/" data-link-title="CM Press Conference On Solar 09/09/2015">CM Press Conference On Solar 09/09/2015</a></li><li id="cc-nav-view-2137270299" class="jmd-nav__list-item-1"><a href="http://www.qasolar.com/pqd-form/" data-link-title="PQD Document" target="_blank" rel="nofollow">PQD Document</a></li><li id="cc-nav-view-2014693899" class="jmd-nav__list-item-1"><a href="/download/outputs-progress-report-of-plant/" data-link-title="Outputs/Progress Report of plant">Outputs/Progress Report of plant</a></li><li id="cc-nav-view-2002680699" class="jmd-nav__list-item-1"><a href="/download/general/" data-link-title="General">General</a></li><li id="cc-nav-view-1806256799" class="jmd-nav__list-item-1"><a href="/download/useful-links/" data-link-title="Useful Links">Useful Links</a></li><li id="cc-nav-view-1936586199" class="jmd-nav__list-item-1"><a href="/download/qa-brochure/" data-link-title="QA Brochure">QA Brochure</a></li><li id="cc-nav-view-2041496499" class="jmd-nav__list-item-1"><a href="/download/audited-financial-statements/" data-link-title="Audited Financial Statements">Audited Financial Statements</a></li><li id="cc-nav-view-1940660299" class="jmd-nav__list-item-1"><a href="/download/box/" data-link-title="BOX">BOX</a></li><li id="cc-nav-view-2041498599" class="jmd-nav__list-item-1"><a href="/download/code-of-conduct-policy/" data-link-title="Code of Conduct Policy">Code of Conduct Policy</a></li><li id="cc-nav-view-2280084599" class="jmd-nav__list-item-1"><a href="/download/perks-privileges/" data-link-title="Perks & Privileges">Perks & Privileges</a></li><li id="cc-nav-view-2280084699" class="jmd-nav__list-item-1"><a href="/download/notifications-circulars/" data-link-title="Notifications/Circulars">Notifications/Circulars</a></li><li id="cc-nav-view-2280084299" class="jmd-nav__list-item-1"><a href="/download/financial-budget/" data-link-title="Financial Budget">Financial Budget</a></li><li id="cc-nav-view-2241337299" class="jmd-nav__list-item-1"><a href="/download/political-map-of-pakistan/" data-link-title="Political Map of Pakistan">Political Map of Pakistan</a></li><li id="cc-nav-view-2229452499" class="jmd-nav__list-item-1 j-nav-has-children"><a href="/download/csr/" data-link-title="CSR">CSR</a><span data-navi-toggle="cc-nav-view-2229452499" class="jmd-nav__toggle-button"></span><ul class="cc-nav-level-2 j-nav-level-2"><li id="cc-nav-view-2229452699" class="jmd-nav__list-item-2"><a href="/download/csr/wadgal-rehabilitation/" data-link-title="Wadgal Rehabilitation">Wadgal Rehabilitation</a></li><li id="cc-nav-view-2229452799" class="jmd-nav__list-item-2"><a href="/download/csr/south-punjab-village-solarization/" data-link-title="South Punjab Village Solarization">South Punjab Village Solarization</a></li></ul></li></ul></li><li id="cc-nav-view-1807074399" class="jmd-nav__list-item-0 j-nav-has-children"><a href="/jobs/" data-link-title="Jobs">Jobs</a><span data-navi-toggle="cc-nav-view-1807074399" class="jmd-nav__toggle-button"></span><ul class="cc-nav-level-1 j-nav-level-1"><li id="cc-nav-view-2244311399" class="jmd-nav__list-item-1"><a href="/jobs/list-of-candidates/" data-link-title="List of Candidates">List of Candidates</a></li></ul></li><li id="cc-nav-view-1936645199" class="jmd-nav__list-item-0 j-nav-has-children cc-nav-parent j-nav-parent jmd-nav__item--parent"><a href="/gallery/" data-link-title="Gallery">Gallery</a><span data-navi-toggle="cc-nav-view-1936645199" class="jmd-nav__toggle-button"></span><ul class="cc-nav-level-1 j-nav-level-1"><li id="cc-nav-view-2136593099" class="jmd-nav__list-item-1 cc-nav-current j-nav-current jmd-nav__item--current"><a href="/gallery/articles/" data-link-title="Articles" class="cc-nav-current j-nav-current jmd-nav__link--current">Articles</a></li><li id="cc-nav-view-2233686899" class="jmd-nav__list-item-1"><a href="/gallery/relief-goods-for-deserving-people/" data-link-title="Relief Goods for Deserving People">Relief Goods for Deserving People</a></li>
155<li id="cc-nav-view-2010505899" class="jmd-nav__list-item-1"><a href="/gallery/inauguration-ceremony/" data-link-title="Inauguration Ceremony">Inauguration Ceremony</a></li><li id="cc-nav-view-2010842899" class="jmd-nav__list-item-1"><a href="/gallery/japanese-delegation-visit/" data-link-title="Japanese Delegation Visit">Japanese Delegation Visit</a></li><li id="cc-nav-view-1954381099" class="jmd-nav__list-item-1"><a href="/gallery/site-updates/" data-link-title="Site Updates">Site Updates</a></li><li id="cc-nav-view-1995850199" class="jmd-nav__list-item-1"><a href="/gallery/adb-visit/" data-link-title="ADB Visit">ADB Visit</a></li><li id="cc-nav-view-1994380799" class="jmd-nav__list-item-1"><a href="/gallery/weather-station/" data-link-title="Weather Station">Weather Station</a></li><li id="cc-nav-view-1954381299" class="jmd-nav__list-item-1"><a href="/gallery/groundbreaking-ceremony/" data-link-title="Groundbreaking Ceremony">Groundbreaking Ceremony</a></li><li id="cc-nav-view-1954380999" class="jmd-nav__list-item-1"><a href="/gallery/ambassador-visit/" data-link-title="Ambassador Visit">Ambassador Visit</a></li><li id="cc-nav-view-1954381199" class="jmd-nav__list-item-1"><a href="/gallery/workshop-at-qa-solar/" data-link-title="Workshop at QA Solar">Workshop at QA Solar</a></li><li id="cc-nav-view-1954381399" class="jmd-nav__list-item-1"><a href="/gallery/infrastructure-developments/" data-link-title="Infrastructure Developments">Infrastructure Developments</a></li><li id="cc-nav-view-2006363299" class="jmd-nav__list-item-1"><a href="/gallery/army-staff-college-csp-trainees/" data-link-title="Army Staff college & CSP Trainees">Army Staff college & CSP Trainees</a></li><li id="cc-nav-view-2233763399" class="jmd-nav__list-item-1"><a href="/gallery/captain-r-mr-saqib-zafar-visit-to-qa-solar-park-bahawalpur/" data-link-title="Captain (R) Mr. Saqib Zafar Visit to QA Solar Park Bahawalpur">Captain (R) Mr. Saqib Zafar Visit to QA Solar Park Bahawalpur</a></li><li id="cc-nav-view-2264342299" class="jmd-nav__list-item-1"><a href="/gallery/dubai-expo-2020/" data-link-title="Dubai Expo 2020">Dubai Expo 2020</a></li><li id="cc-nav-view-2274317099" class="jmd-nav__list-item-1"><a href="/gallery/us-consul-general-visit/" data-link-title="US Consul General Visit">US Consul General Visit</a></li></ul></li><li id="cc-nav-view-1805724399" class="jmd-nav__list-item-0"><a href="/contact-us/" data-link-title="Contact Us">Contact Us</a></li></ul></div></div> 156 </div> 157 <!-- END _mobile-navigation.sass --> 158 159 </div> 160 161 </header><!-- END _header.sass --><!-- _subnavigation.sass --><nav class="jtpl-subnavigation subnavigation-colors"><div class="jtpl-subnavigation__inner-nav2 navigation-alignment"> 162 <div data-container="navigation"><div class="j-nav-variant-nested"><ul class="cc-nav-level-1 j-nav-level-1"><li id="cc-nav-view-2136593099" class="jmd-nav__list-item-1 cc-nav-current j-nav-current jmd-nav__item--current"><a href="/gallery/articles/" data-link-title="Articles" class="cc-nav-current j-nav-current jmd-nav__link--current">Articles</a></li><li id="cc-nav-view-2233686899" class="jmd-nav__list-item-1"><a href="/gallery/relief-goods-for-deserving-people/" data-link-title="Relief Goods for Deserving People">Relief Goods for Deserving People</a></li><li id="cc-nav-view-2010505899" class="jmd-nav__list-item-1"><a href="/gallery/inauguration-ceremony/" data-link-title="Inauguration Ceremony">Inauguration Ceremony</a></li><li id="cc-nav-view-2010842899" class="jmd-nav__list-item-1"><a href="/gallery/japanese-delegation-visit/" data-link-title="Japanese Delegation Visit">Japanese Delegation Visit</a></li><li id="cc-nav-view-1954381099" class="jmd-nav__list-item-1"><a href="/gallery/site-updates/" data-link-title="Site Updates">Site Updates</a></li><li id="cc-nav-view-1995850199" class="jmd-nav__list-item-1"><a href="/gallery/adb-visit/" data-link-title="ADB Visit">ADB Visit</a></li><li id="cc-nav-view-1994380799" class="jmd-nav__list-item-1"><a href="/gallery/weather-station/" data-link-title="Weather Station">Weather Station</a></li><li id="cc-nav-view-1954381299" class="jmd-nav__list-item-1"><a href="/gallery/groundbreaking-ceremony/" data-link-title="Groundbreaking Ceremony">
162Groundbreaking Ceremony</a></li><li id="cc-nav-view-1954380999" class="jmd-nav__list-item-1"><a href="/gallery/ambassador-visit/" data-link-title="Ambassador Visit">Ambassador Visit</a></li><li id="cc-nav-view-1954381199" class="jmd-nav__list-item-1"><a href="/gallery/workshop-at-qa-solar/" data-link-title="Workshop at QA Solar">Workshop at QA Solar</a></li><li id="cc-nav-view-1954381399" class="jmd-nav__list-item-1"><a href="/gallery/infrastructure-developments/" data-link-title="Infrastructure Developments">Infrastructure Developments</a></li><li id="cc-nav-view-2006363299" class="jmd-nav__list-item-1"><a href="/gallery/army-staff-college-csp-trainees/" data-link-title="Army Staff college & CSP Trainees">Army Staff college & CSP Trainees</a></li><li id="cc-nav-view-2233763399" class="jmd-nav__list-item-1"><a href="/gallery/captain-r-mr-saqib-zafar-visit-to-qa-solar-park-bahawalpur/" data-link-title="Captain (R) Mr. Saqib Zafar Visit to QA Solar Park Bahawalpur">Captain (R) Mr. Saqib Zafar Visit to QA Solar Park Bahawalpur</a></li><li id="cc-nav-view-2264342299" class="jmd-nav__list-item-1"><a href="/gallery/dubai-expo-2020/" data-link-title="Dubai Expo 2020">Dubai Expo 2020</a></li><li id="cc-nav-view-2274317099" class="jmd-nav__list-item-1"><a href="/gallery/us-consul-general-visit/" data-link-title="US Consul General Visit">US Consul General Visit</a></li></ul></div></div> 163 </div> 164 <div class="jtpl-subnavigation__inner-nav3 navigation-alignment"> 165 <div data-container="navigation"><div class="j-nav-variant-nested"></div></div> 166 </div> 167 </nav><!-- END _subnavigation.sass --><!-- _title.sass --><div class="jtpl-title" data-features="boxed" background-area="stripe" background-area-default=""> 168 <div id="cc-website-title" class="cc-single-module-element"><div id="cc-m-12406137799" class="j-module n j-header"><a href="https://www.qasolar.com/"><span class="cc-within-single-module-element j-website-title-content" id="cc-m-header-12406137799">100 MW Solar Power Plant<br/>at Bahawalpur</span></a></div></div> 169 </div> 170 <!-- END _title.sass --> 171 172 <!-- _section.sass --> 173 <div class="jtpl-section cc-content-parent"> 174 175 <div class="jtpl-content content-options cc-content-parent"> 176 <div class="jtpl-content__inner content-padding cc-content-parent"> 177 <div class="jtpl-breadcrumb breadcrumb-options"> 178 <div data-container="navigation"><div class="j-nav-variant-breadcrumb"><ol itemscope="true" itemtype="http://schema.org/BreadcrumbList"><li itemscope="true" itemprop="itemListElement" itemtype="http://schema.org/ListItem"><a href="/gallery/" data-link-title="Gallery" itemprop="item"><span itemprop="name">Gallery</span></a><meta itemprop="position" content="1"/></li><li itemscope="true" itemprop="itemListElement" itemtype="http://schema.org/ListItem" class="cc-nav-current j-nav-current"><a href="/gallery/articles/" data-link-title="Articles" itemprop="item" class="cc-nav-current j-nav-current"><span itemprop="name">Articles</span></a><meta itemprop="position" content="2"/></li></ol></div></div> 179 </div> 180 <div id="content_area" data-container="content"><div id="content_start"></div> 181 182 <div id="cc-matrix-2973787699"><div id="cc-m-12406274099" class="j-module n j-header "><h2 class="" id="cc-m-header-12406274099">Articles</h2></div><div id="cc-m-12406274199" class="j-module n j-spacing "> 183 <div class="cc-m-spacer" style="height: 30px;"> 184 185</div> 186 187</div><div id="cc-m-11412552499" class="j-module n j-textWithImage "><figure class="cc-imagewrapper cc-m-image-align-1"> 188<img srcset="https://image.jimcdn.com/app/cms/image/transf/dimension=279x1024:format=jpg/path/sa1a4b303052e8a1a/image/i47038ded29cd3528/version/1574064376/image.jpg 279w, https://image.jimcdn.com/app/cms/image/transf/dimension=320x1024:format=jpg/path/sa1a4b303052e8a1a/image/i47038ded29cd3528/version/1574064376/image.jpg 320w, https://image.jimcdn.com/app/cms/image/transf/dimension=558x1024:format=jpg/path/sa1a4b303052e8a1a/image/i47038ded29cd3528/version/1574064376/image.jpg 558w" sizes="(min-width: 279px) 279px, 100vw" id="cc-m-textwithimage-image-11412552499" src="https://image.jimcdn.com/app/cms/image/transf/dimension=279x1024:format=jpg/path/sa1a4b303052e8a1a/image/i47038ded29cd3528/version/1574064376/image.jpg" alt="" class="" data-src-width="960" data-src-height="404" data-src="https://image.jimcdn.com/app/cms/image/transf/dimension=279x1024:format=jpg/path/sa1a4b303052e8a1a/image/i47038ded29cd3528/version/1574064376/image.jpg" data-image-id="7497500799"/> 189 190</figure> 191<div> 192 <div id="cc-m-textwithimage-11412552499" data-name="text" data-action="text" class="cc-m-textwithimage-inline-rte"> 193 <p> 194 <span style="font-size: 24px;"><span style="font-weight: 700 !important;">Quaid-e-Azam Solar Power - Road Map for the Future of Clean Power Generation in Pakistan</span></span> 195</p> 196 197<p> 198 <span style="font-size: 24px;"><span style="font-weight: 700 !important;">Muhammad Amjad | Ex-Chief Executive Officer</span></span> 199</p> 200 201<p class="papertitle" style="text-align: justify;"> 202  203</p> 204 205<p class="papertitle" style="text-align: justify;"> 206  207</p> 208 209<p style="text-align: justify;"> 210 <span style="font-size: 11pt; letter-spacing: -0.05pt; color: #000000;">With over 250GWh of energy production after its successful operation over a period of 16 months, Quaid e Azam Solar Power 211 (Pvt.) Ltd. has initiated new era of power production in Pakistan. It was like remov
211ing more than 25,000 cars off the road per year, which are polluting our cities, and providing electricity to 212 over 100,000 homes. We have ventured to develop the first 100 MW Solar PV plant in Bahawalpur and by doing so, have engraved the biggest milestone for future growth in solar power sector in 213 Pakistan. From a project in its budding phase to an un-denying reality, Quaid-e-Azam Solar has setup new standards for Pakistan Solar power projects. Building the first project of its kind 214 in Pakistan does not necessarily mean just providing actual data and material to NEPRA resulting in determination of the first solar Tariff, introduction of amendment in new Grid Code and 215 proposing the first EPA (Energy Purchase Agreement), but it also means instilling the understanding of the Solar PV technology among the general public.</span> 216</p> 217 218<p style="text-align: justify;"> 219 <span style="font-size: 11pt; letter-spacing: -0.05pt; color: #000000;"> </span> 220</p> 221 222<p style="text-align: justify;"> 223 <span style="color: #000000;"><span style="font-size: 11pt; letter-spacing: -0.05pt;">Like many new technologies solar energy is passing through, three critical phases â Initial development and 224 adoption, disappointment due to lack of knowledge of the technology and finally the maturity stage along with market acceptance. Though, there are many hurdles to tackle but we have reasons 225 to hope for a bright future ahead. Solar generation is part of balanced supply mix and promises energy security where declining fossil fuel cannot. It is paving the way how the future power 226 systems should be built. The conventional mindset in planning is having hard times to understand that intermittent sources will change the future of power generation.</span> <span style="font-size: 11pt;">As future electricity demands, we will require a faster-acting, flexible and sophisticated grid that maintains high reliability and efficiency while integrating new distributed 227 generation resources that are economical.</span></span> 228</p> 229 230<p style="text-align: justify;"> 231 <span style="color: #000000;"> </span> 232</p> 233 234<p style="text-align: justify;"> 235 <span style="color: #000000;"><span style="font-size: 11pt; letter-spacing: -0.05pt;">On ground Quaid-e-Azam Solar Power has not only established its own 100 MW plant but has also paved the way 236 for all the future Solar PV projects in both private and public sectors. Today AEDB has over 1200 MW projects LOIs and Quaid-e-Azam Solar Power Park alone has a capacity of 1000 MW in which 400 237 MW has already been installed and commissioned. Other Provincial government bodies have been adopting the model setup by Quaid-e-Azam Solar. Baluchistan and FATA are the forerunners who have 238 contacted us for guidance. Even research facilities such as NESCOM have looked up to us for guidance in developing Solar at their own facilities.</span></span> 239</p> 240 241<p style="text-align: justify;"> 242 <span style="font-size: 11pt; letter-spacing: -0.05pt; color: #000000;"> </span> 243</p> 244 245<p style="text-align: justify;"> 246 <span style="font-size: 11pt; letter-spacing: -0.05pt; color: #000000;">In order to understand the purpose of Quaid-e-Azam Solar Power and Punjab Government for introducing solar technology and 247 establishing a 100 MW Solar PV plant, we have to look towards the global change in utility and energy generation. Today Pakistan cannot live in a world of isolation as in this time of 248 globalization there are no economic, social and technological islands. In the present world, everything is connected. The reality and fact of the world is that 1% of the daily solar energy is 249 equivalent to all the existing electrical load on earth and harnessing this free clean energy is the goal of every developed country. Germany has installed 40 GW of solar PV and is still 250 installing more even though itâs in a region that has one of the lowest solar potential on earth.</span> 251</p> 252 253<p style="text-align: justify;"> 254  255</p> 256 257<p style="text-align: justify;"> 258 <span style="font-size: 11pt; letter-spacing: -0.05pt; color: #000000;">Ten years ago installing solar was like flipping a coin, in which one side had high economic impact and the other side had 259 clean energy. However, the tables have turned today as Solar PV not only provides clean energy but is economically beneficial to the end user. </span> 260</p> 261 262<p class="papertitle" style="text-align: justify;"> 263 <span style="color: #000000;"><span style="font-size: 11pt; font-family: 'Times New Roman', serif;">According to the McKinsey Quarterly 2008 report the predicted growth in solar market is 264 exponential from year 2005 to year 2020 </span></span> 265</p> 266 267<p style="text-indent: 0in; text-align: justify;"> 268 <span style="font-size: 11pt; color: #000000;">it can be observed that the global production per GW is even higher than 90GW which was predicted for 2015 (figure 1.2) and stands around 102 GW for 269 2012. The growth of solar power generation exceeds the predicted growth and shows the promising prospective of solar power generation mainly because mass production has lowered its price and now 270 it is affordable. However, one of the main reasons for exponential growth of particularly Solar PV plants is its easy and quick to construct nature. Quaid-e-Azam Solar power plant alone was 271 constructed within 9 months, which for a plant of its scale is considerably fast. On the other hand, a small hydro or thermal plant can take 1.5 to 2 years to design and build.</span> 272</p> 273 274<p style="text-indent: 0in; text-align: justify;"> 275  276</p> 277 278<p style="text-align: justify;"> 279 <span style="color: #000000;"><span style="font-size: 11pt; letter-spacing: -0.05pt;">Reviewing the global perspective, Investment in renewable energy has increased from $273 billion to $285.9 280 billion from 2014 to 2015. Solar power installed capacity has increased from 177 GW to 227 GW from 2014 to 2015 alone which shows that global growth trends of renewable energy are increasingly 281 high. Accordingly, Coal continues to decline for electricity generation worldwide. Coal-fired generation, which accounted for 40% of total world electricity generation in 2012, declining to 29% 282 of the total in 2040 in the Reference case. Renewables account for a rising share of the worldâs total electricity supply, and they are the fastest growing source of electricity generation in the 283 IEO 2016 Reference case. Total generation from renewable resources increases by 2.9%/year, as the renewable share of world electricity generation grows from 22% in 2012 to 29%. Generation from 284 non-hydropower renewables is the predominant source of the increase, rising by an average of 5.7%/year and outpacing increases in natural gas (2.7%/year), nuclear (2.4%/year), and coal 285 (0.8%/year), even without taking into account the growth in renewable generation anticipated under the Clean Power Plan in the United States.</span> <span style="font-size: 11pt;"><span style="letter-spacing: -0.05pt;">
285All the above is showing that a step towards renewable energy particularly solar power is the most logical thing to do for 286 Pakistan.</span></span></span> 287</p> 288 289<p style="text-align: justify;"> 290 <span style="font-size: 11pt; letter-spacing: -0.05pt; color: #000000;"> </span> 291</p> 292 293<p style="text-align: justify;"> 294 <span style="font-size: 11pt; letter-spacing: -0.05pt; color: #000000;">Growth in every sector is based on its positive impact on the economy of the country. One third of Pakistanâs total import 295 is comprised of Crude Oil (approx. $ 6.69 billion annually), according to statistics approximately 70% of our installed power generation capacity is based on fossil fuel that is being imported 296 for power generation. Our Natural Gas reserves are depleting at an increasing rate, while our power demand is increasing day by day. Solar power uses sun as fuel and is independent from fossil 297 fuel consumption that is why having solar power would mean lower fossil fuel imports and higher GDP. Today the crude oil prices of the world have fallen below 50% of what it once stood in 2008. 298 However, the recent trends show a gradual increase in crude oil prices, OPEC is convening new meetings to increase the oil pries even further. In such a scenario it is but inevitable that the 299 price of crude oil will increase and our reliability on it will cost the country billions of dollars in revenue loss.</span> 300</p> 301 302<p style="text-align: justify;"> 303 <span style="font-size: 11pt; letter-spacing: -0.05pt; color: #000000;"> </span> 304</p> 305 306<p class="papertitle" style="text-align: justify;"> 307 <span style="color: #000000;"><span style="font-size: 11pt; font-family: 'Times New Roman', serif; letter-spacing: -0.05pt;">The most detrimental effect that any developing economy can face is 308 lack of sufficient power. The energy crisis which Pakistan faced escalated during 2005 â 2006 due to the insufficient installed capacity, the power shortfall was 2,645 MW</span> <span style="font-size: 11pt; font-family: 'Times New Roman', serif;"><span style="letter-spacing: -0.05pt;">in 2007, and within a year this power outage went up to 30 percent between 2008 and 2009. The 309 shortfall kept increasing till 6,151 MW in 2011. Furthermore, the shortfall is expected to increase by </span></span><span style="font-size: 11pt; letter-spacing: -0.05pt;">8,000 MW in 2017 310 and 13,000 MW by 2020, according to some estimates. The only solution to overcome such sharp increase in power shortfall is to install reliable cheap power at a fast rate for which, this solar PV 311 technology is the key.</span></span> 312</p> 313 314<div class="WordSection1" style="text-align: justify;"> 315 <p> 316 <span style="font-size: 11pt; letter-spacing: -0.05pt; color: #000000;"> </span> 317 </p> 318 319 <p> 320 <span style="font-size: 11pt; letter-spacing: -0.05pt; color: #000000;">Quaid-e-Azam Solar Power Plant is located in Lal-Suhanrah Park Bahawalpur and covers an area of 500 acres of land. 321 Quaid-e-Azam Solar Power is based on Photovoltaic Polycrystalline technology which is a robust highly recommended technology for desert areas where the power plant has a life of 25 years and 322 above. It uses fixed tilted mounting architecture and the power plant is designed at 100 MWp DC at Standard Testing Conditions (STC). There are 392,160 255 W PV Modules, 200 inverters, 100 323 33kV step-up transformers and a substation with state of the art line protection system. All power from Solar PV plant is evacuated via 132 kV Bus to MEPCO, which is then supplied to all over 324 the country.</span> 325 </p> 326 327 <p> 328 <span style="font-size: 11pt; letter-spacing: -0.05pt; color: #000000;"> </span> 329 </p> 330 331 <p> 332 <span style="font-size: 11pt; letter-spacing: -0.05pt; color: #000000;">Every renewable energy power plant constructed has been given an initial energy target by NEPRA and CPPA for an annual 333 energy production. Quaid-e-Azam Solar Power was also given an initial target of 153,300 MWh for the first year, which Quaid-e-Azam Solar power not only achieved but surpassed by 4.43% (i.e. 334 160,088 MWh produced).</span> 335 </p> 336 337 <p>
338 <span style="font-size: 11pt; letter-spacing: -0.05pt; color: #000000;"> </span> 339 </p> 340 341 <p> 342 <span style="font-size: 11pt; color: #000000;"> </span> 343 </p> 344 345 <p> 346 <span style="font-size: 11pt; color: #000000;">On October 12, 2013, the Economist published an interesting research report on European electrical utilities âHow to lose half a trillion euro â 347 Europeâs electricity providers face an existential threat.â The report highlighted how utility companies are losing millions by mismanaging electricity flow from renewable energy plants and 348 losing valuable energy. We here at Quaid-e-Azam Solar have the expertise and the advantage of being the pioneers in the field of large scale renewables in Pakistan, having the vision to 349 select the prime technologies that are not only feasible but reliable and will, in future, prevent power utilities from facing substantial losses. Quaid-e-Azam Solar has a vision to develop 350 sustainable and self-sufficient micro girds with solar power systems that will in future someday become the model for self-sustaining cities.</span> 351 </p> 352 353 <p> 354 <span style="font-size: 11pt; color: #000000;"> </span> 355 </p> 356 357 <p> 358 <span style="font-size: 11pt; color: #000000;">Implementation of such plans requires leadership, solid base, research, discipline and good will. For this Quaid-e-Azam Solar Power is getting 359 ISO certification and has registered for CDM carbon credits. Why ISO? is a question that some professionals have in their mind. The reason is that for Quaid-e-Azam Solar to achieve its goals 360 it has to centralize and organize its system perfectly and ISO 9001 and other related standards such as ISO 14001 and OHSAS 18001 provides the platform to do just that.</span> 361 </p> 362 363 <p> 364 <span style="font-size: 11pt; color: #000000;"> </span> 365 </p> 366 367 <p style="text-indent: 0in;"> 368 <span style="font-size: 11pt; letter-spacing: 0pt; color: #000000;">At Quaid-e-Azam Solar Power, we aim to resolve problems before they occur. Our goal is energy security and 369 reliability, energy innovation, energy saving, capital cost avoidance, reducing climate risks, development of green economy and greater penetration of distributed generation.  Together, 370 we look forward in developing sustainable power system of the future that is economical, modern, flexible and clean.</span> 371 </p> 372</div> </div> 373</div> 374 375<div class="cc-clear"></div>
376<script id="cc-m-reg-11412552499">// <![CDATA[ 377 378 window.regModule("module_textWithImage", {"data":{"imageExists":true,"hyperlink":"","hyperlink_target":"","hyperlinkAsString":"","pinterest":"0","id":11412552499,"widthEqualsContent":"0","resizeWidth":"279","resizeHeight":118},"id":11412552499}); 379// ]]> 380</script>
380</div><div id="cc-m-12406274299" class="j-module n j-spacing "> 381 <div class="cc-m-spacer" style="height: 30px;"> 382 383</div> 384 385</div></div> 386 387 </div> 388 </div> 389 </div> 390 391 <div class="jtpl-sidebar sidebar-options"> 392 <div class="jtpl-sidebar__inner"> 393 <div data-container="sidebar"><div id="cc-matrix-2257477999"><div id="cc-m-11334814499" class="j-module n j-hgrid "> <div class="cc-m-hgrid-column last" style="width: 100%;"> 394 <div id="cc-matrix-2946211499"><div id="cc-m-12960534099" class="j-module n j-text "><p> 395 <span style="color: #000000; font-size: 18px;"><strong>Auditors</strong></span> : <span style="color: #000000; font-size: 18px;">Crowe Hussain Chaudhury & Co.</span> 396</p> 397 398<p> 399 <span style="font-size: 18px;"><strong><span style="color: #000000;">Legal Advisor</span></strong></span> <span style="color: #000000;"><span color="#000000" style="color: #000000;">: <span style="font-size: 18px;">Saqlain & Husnain â Advocates and Corporate Counsels</span></span></span> 400</p></div><div id="cc-m-12503896599" class="j-module n j-imageSubtitle "></div><div id="cc-m-12956099199" class="j-module n j-text "></div></div> </div> 401 402<div class="cc-m-hgrid-overlay" data-display="cms-only"></div> 403 404<br class="cc-clear"/> 405 406</div><div id="cc-m-8725080799" class="j-module n j-hgrid "> <div class="cc-m-hgrid-column" style="width: 32.02%;"> 407 <div id="cc-matrix-2257478699"><div id="cc-m-12442899799" class="j-module n j-header "><h3 class="" id="cc-m-header-12442899799">Our Location</h3></div><div id="cc-m-12442898899" class="j-module n j-htmlCode "><iframe src="https://www.google.com/maps/embed?pb=!1m18!1m12!1m3!1d3401.1795623100775!2d74.34279801467405!3d31.519227854353115!2m3!1f0!2f0!3f0!3m2!1i1024!2i768!4f13.1!3m3!1m2!1s0x391904f7c377411d%3A0xdd3a13ea62359d37!2sQuaid-e-Azam%20Solar%20Power%20(Pvt.)%20Ltd.%20(QA%20Solar)!5e0!3m2!1sen!2s!4v1580190097752!5m2!1sen!2s" height="150" frameborder="0" style="border:0;" allowfullscreen="allowfullscreen"></iframe></div></div> </div> 408 <div class="cc-m-hgrid-separator" data-display="cms-only"><div></div></div> 409 <div class="cc-m-hgrid-column" style="width: 33.22%;"> 410 <div id="cc-matrix-3252830499"><div id="cc-m-12960525599" class="j-module n j-text "><p> 411 <strong><span style="color: #000000;">Registeration No :</span></strong> <span style="color: #000000;">0085152</span> 412</p> 413 414<p> 415 <strong><span style="color: #000000;">Generation Liecense No :</span></strong> <span style="color: #000000;">SPGL/04/2014</span> 416</p> 417 418<p> 419 <strong><span style="color: #000000;">NTN :</span></strong> <span style="color: #000000;">4226822-2</span> 420</p></div><div id="cc-m-12406212999" class="j-module n j-text "><div border="1"> 421 <p> 422 <span style="color: #000000;"><strong>Address:</strong> 3rd Floor, 83A-E1,Gulberg III,</span> 423 </p> 424 425 <p> 426 <span style="color: #000000;">Main Boulevard, </span><span style="color: #000000;">Lahore, Pakistan</span> 427 </p> 428 429 <p> 430 <span style="color: #000000;"><strong>Ph:</strong>  +92 42 35790363-4</span> 431 </p> 432 433 <p> 434 <span style="color: #000000;">    +92 42 99332261-4</span> 435 </p> 436 437 <p> 438 <span style="color: #000000;"><strong>Fax:</strong> +92 42 35790366</span> 439 </p> 440 441 <p> 442 <span style="color: #000000;"><strong>Email:</strong>  <a href="/cdn-cgi/l/email-protection" class="__cf_email__" data-cfemail="d1b8bfb7be91a0b0a2bebdb0a3ffb2bebc">[email protected]</a></span> 443 </p> 444</div></div></div> </div> 445 <div class="cc-m-hgrid-separator" data-display="cms-only"><div></div></div> 446 <div class="cc-m-hgrid-column last" style="width: 30.72%;"> 447 <div id="cc-matrix-2626530199"><div id="cc-m-12504916699" class="j-module n j-twitter "> 448<div id="cc-m-twitter-12504916699" class="cc-m-twitter"> 449 <button class="twitter-placeholder j-twitter-placeholder"><span class="icon-web-share-x"></span>Connect to X</button></div>
vendor: 109 bytes, lines 449-450
449 450<script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script>
450<script id="cc-m-reg-12504916699">// <![CDATA[ 451 452 window.regModule("module_twitter", {"variant":"default","selector":"#cc-m-twitter-12504916699","username":"qasolar","count":"0","followButton":"1","minTweets":1,"maxTweets":100,"withinCms":false,"translation":{"lessThanAMinute":"less than a minute ago","aboutAMinute":"about one minute ago","minutes":"{minuten} minutes ago","aboutAnHour":"about one hour ago","hours":"{stunden} hours ago","oneDay":"one day ago","days":"{tage} days ago"},"id":12504916699}); 453// ]]> 454</script>
454</div><div id="cc-m-12406200499" class="j-module n j-facebook "> <div class="j-search-results"> 455 <button class="fb-placeholder-button j-fb-placeholder-button"><span class="like-icon"></span>Connect to Facebook</button> 456 <div class="fb-page" data-href="https://www.facebook.com/Quaideazamsolar1/?ref=aymt_homepage_panel" data-hide-cover="false" data-show-facepile="false" data-show-posts="false" data-width="297"></div> 457 </div>
457<script>// <![CDATA[ 458 459 window.regModule("module_facebook", []); 460// ]]> 461</script>
461</div></div> </div> 462 463<div class="cc-m-hgrid-overlay" data-display="cms-only"></div> 464 465<br class="cc-clear"/> 466 467</div><div id="cc-m-12406215699" class="j-module n j-hr "> <hr/> 468</div><div id="cc-m-9511882499" class="j-module n j-text "><p style="text-align: left;"> 469 <span style="color: #000000;"><span style="text-decoration: underline;"><strong>Navigation</strong> <strong>Tips:</strong></span> Check the "Media" Tab for News Articles about QA Solar. Published 470 Ads and Tender Notices can be <span style="line-height: 19.6000003814697px;">found in the "Tenders" Tab. Check all the latest Pictures in the Gallery Tab!</span></span> 471</p></div></div></div> 472 </div> 473 </div> 474 475 <div class="jtpl-footer footer-options"> 476 <div class="jtpl-footer__inner"> 477 <div id="contentfooter" data-container="footer"> 478 479 480 <div class="j-meta-links"> 481 <a href="/about/">About</a> | <a href="//www.qasolar.com/j/privacy">Privacy Policy</a> | <a href="/sitemap/">Sitemap</a> </div> 482 483 <div class="j-admin-links"> 484 485 486<span class="loggedin"> 487 <a rel="nofollow" id="logout" target="_top" href="https://cms.e.jimdo.com/app/cms/logout.php"> 488 Log out </a> 489 | 490 <a rel="nofollow" id="edit" target="_top" href="https://a.jimdo.com/app/auth/signin/jumpcms/?page=2136593099">Edit</a> 491</span> 492 </div> 493 494 495</div> 496 497 </div> 498 </div> 499 </div> 500 <!-- ENDE_section.sass --> 501 502 </div> 503 <!-- END _main.sass --> 504</div>
504<script type="text/javascript"> 505//<![CDATA[ 506addAutomatedTracking('creator.website', track_anon); 507//]]> 508</script>
508 509 510 511 512 513 514 515</body> 516</html>
Line numbers count LF bytes from the start of the resource, as the search results do. Vendor segments are library code the classifier recognised; they are stored but not indexed. Bytes are shown as Latin1 characters, one per byte.