PageSourceSearch

https://octrainguy.com/ConrailHistory.html

html octrainguy.com collected 2026-10-02 14:29:09 UTC 14,138 bytes, 203 lines download raw bytes

1<!doctype html public "-//w3c//dtd html 4.0 transitional//en">
2<html>
3<head><!--#include virtual='/ga.shtml'--><!-- Google tag (gtag.js) -->
vendor: 64 bytes, lines 3-4
3
4<script async src="https://www.googletagmanager.com/gtag/js?id=
4G-6TP1MD8Z2X
vendor: 12 bytes, line 4
4"></script>
5<script>
6  
vendor: 134 bytes, lines 6-10
6window.dataLayer = window.dataLayer || [];
7  function gtag(){dataLayer.push(arguments);}
8  gtag('js', new Date());
9
10  gtag('config', '
10G-6TP1MD8Z2X
vendor: 4 bytes, line 10
10');
11</script>
11
12
13<script data-ad-client='ca-pub-6461585564321965' async src='https://pagead2.googlesyndication.com/pagead/js/adsbygoogle.js'></script>
13
14
15
16   <meta http-equiv="Content-Type" content="text/html; charset=iso-8859-1">
17   <meta name="Author" content="Stephen & Jennifer Bradley">
18   <meta name="GENERATOR" content="Mozilla/4.76 [en] (Windows NT 5.0; U) [Netscape]">
19   <title>Effects of Conrail</title>
20</head>
21<body text="#FFFFFF" bgcolor="#3366FF" link="#FFCC00" vlink="#993366" alink="#FFCC00">
22<font face="Courier New,Courier"><font size=-1>This page
23will cover the freight aspect of Conrail.&nbsp; For information on passenger
24operations on the North Jersey Coast Line, <a href="conrail-passenger.html">click
25on this link</a>.</font></font>
26<center><img SRC="Signal.gif" height=88 width=61><img SRC="crossing3.gif" height=82 width=56></center>
27
28<p><font face="Courier New,Courier"><font size=-1>As mentioned earlier,
29the fate of the Main Line was clearly in the hands of Conrail.&nbsp; Sand
30continued to be the main commodity for the CNJ, but would it continue for
31Conrail?&nbsp; Even before Conrail operations began on April 1, 1976, the
32battle was on between shippers, local politicians, and Conrail leaders
33as Conrail looked to cut what they deemed as “excess</font></font>
34<br><font face="Courier New,Courier"><font size=-1>trackage”.&nbsp; In
35early 1974, Conrail leaders were prepared to list the Main Line south of
36Woodmansie, the Barnegat Branch south of Toms River, and the NY&amp;LB
37south of Asbury Park as excess trackage.&nbsp; An agreement was made where
38Conrail would continue to run all “excess trackage” lines for one year,
39then make a decision on future operations.</font></font>
40<p><font face="Courier New,Courier"><font size=-1>With that agreement made,
41the CNJ, in preparation for Conrail, upgraded the Main Line from Red Bank
42to Chatsworth.&nbsp; Work began in late 1974 and was completed in early
431975.&nbsp; Tracks were replaced with 140/6 welded rail (which the entire
44Main Line received), newer ties were put in, the rail bed was placed with
45new ballast, and the Lakewood siding was shortened.&nbsp; All</font></font>
46<br><font face="Courier New,Courier"><font size=-1>signals along the line
47were removed.&nbsp; Upon completion of the work, most speed restrictions
48between Red Bank and Woodmansie were lifted.&nbsp; Upon the formation of
49Conrail, the CNJ became</font></font> <font face="Courier New,Courier"><font size=-1>Central
50Jersey Industries, Inc. and focused on selling its real estate properties
51not</font></font> <font face="Courier New,Courier"><font size=-1>included
52in Conrail.</font></font>
53<p><img SRC="Track.gif" height=21 width=954>
54<p><font face="Courier New,Courier"><font size=-1>On April 1, 1976, Conrail
55officially began operation.&nbsp; By June, Conrail had continued running
56the sand extras five times per week and continued the Red Bank to Lakehurst
57locals two or</font></font> <font face="Courier New,Courier"><font size=-1>three
58times per week.&nbsp; By mid-summer, all Bridgeton traffic was rerouted
59through Camden via</font></font> <font face="Courier New,Courier"><font size=-1>the
60former Pennsylvania-Reading Seashore Line with the exception of about twenty-five
61loads</font></font>
62<br><font face="Courier New,Courier"><font size=-1>of glass sand.&nbsp;
63These carloads were destined for northern New Jersey deliveries and continued
64to use the Main Line.&nbsp; This decision would have been made regardless
65of the condition of the</font></font> <font face="Courier New,Courier"><font size=-1>Main
66Line as it would make more economic sense for Conrail to route everything
67destined for</font></font> <font face="Courier New,Courier"><font size=-1>south
68Jersey via Camden.&nbsp; On April 1, 1977, which was Conrail’s first birthday,
69they</font></font>
70<br><font face="Courier New,Courier"><font size=-1>abandoned the Barnegat
71Branch between Beachwood and Pinewald (Bayville) as very little freight
72traffic moved on the line south of Beachwood.&nbsp; The line now terminated
73at South Toms River.&nbsp; The CNJ's local service on the Main Line was
74done two or three times per week, with a very erratic schedule on the Barnegat
75Branch, depending on whether Conrail had traffic for the Barnegat Branch
76or not.&nbsp; Conrail picked up the CNJ's schedule for these lines.</font></font>
77<p><font face="Courier New,Courier"><font size=-1>Clayton Sand and Gravel
78Company bought the Glidden site in 1977 and the Hollander site in 1978
79and continued business via the sand extras.&nbsp; By early summer of 1978,
80almost all north to south traffic had been diverted over the PRSL via Camden.&nbsp;
81As a result, the last revenue train from Winslow Junction to Lakehurst
82was on August 3, 1978.&nbsp; Ironically, one of the two</font></font>
83<br><font face="Courier New,Courier"><font size=-1>locomotives was of CNJ
84heritage (GP-7), ending ninety-seven years of service on the line.</font></font>
85<p><font face="Courier New,Courier"><font size=-1>On February 18, 1981,
86Conrail notified New Jersey of its intention to abandon the unused track
87between Woodmansie and Chatsworth, which occurred on December 22, 1981.&nbsp;
88The former CNJ Main Line, now referred to as the Southern Secondary, now
89ended at Woodmansie.&nbsp; In that same</font></font> <font face="Courier New,Courier"><font size=-1>year,
90Conrail cut the Toms River Branch back to Ciba Geigy due to the condition
91of the</font></font>
92<br><font face="Courier New,Courier"><font size=-1>bridges over the Toms
93River.&nbsp; (The track was removed in the late 1980s.)&nbsp; Central Jersey
94Industries Inc. auctioned off the abandoned right of way between Toms River
95and Barnegat.&nbsp; Today, the right of way still exists and can be used
96as a pedestrian/bike path in certain areas.&nbsp; Beachwood did pave their
97portion for pedestrian usage.&nbsp; All bridges on the line still stand
98with the exception of the ones at Toms River, which were removed in the
99late 1990s.</font></font>
100<p><font face="Courier New,Courier"><font size=-1>In the fall of 1982,
101Red Bank Yard was closed, and all service along the Southern Secondary
102and Toms River Branch originated out of Brown's Yard.&nbsp; The CNJ had
103wanted to close Red Bank Yard and make an agreement with the PRR to share
104Brown's Yard, but that plan never came through.&nbsp; Up through 1982,
105Conrail still worked freight on the NY&amp;LB to Bay Head.&nbsp; My father
106recounts</font></font> <font face="Courier New,Courier"><font size=-1>catching
107the train on his way into work in Point Pleasant Beach early in the morning.&nbsp;
108Conrail ran about one train per day, five days per week.&nbsp; Conrail
109ceased freight operations south of Asbury Park on January 1, 1983, when
110New Jersey Transit officially took over passenger service on the former
111NY&amp;LB trackage.&nbsp; Bay Head Yard is now under the operation of New
112Jersey Transit.</font></font>
113<p><font face="Courier New,Courier"><font size=-1>During the winter of
1141985-1986, Red Bank Yard was removed as was the two-track connection with
115the NY&amp;LB.&nbsp; A new single-track connection was built along with
116a two-track yard.&nbsp; Red Bank tower was also taken out of service by
117New Jersey Transit.&nbsp; In the summer of 1986, Conrail sold the line
118from Lakehurst to Woodmansie to Clayton Sand and Gravel Company.&nbsp;
119Clayton opened the line in September 1986 and rebuilt the track to 10 miles
120per hour standard by the spring of 1988.&nbsp; After a June derailment,
121Clayton decided against additional repairs and shut down the line.&nbsp;
122(The derailment was one of many reasons for their decision.)&nbsp; The
123Southern Secondary now</font></font> <font face="Courier New,Courier"><font size=-1>terminated
124at Lakehurst altogether.&nbsp; Also in 1986, Clayton's former Glidden site
125in South</font></font> <font face="Courier New,Courier"><font size=-1>Lakewood
126closed as deposits were exhausted.</font></font><font face="Courier New,Courier"><font size=-1></font></font>
127<p><font face="Courier New,Courier"><font size=-1>In 1987, Conrail initiated
128a self-unloading, conveyer-equipped train than ran from Chimney Rock (near
129Bound Brook) to the Glidden Site at South Lakewood.&nbsp; The train carried
130sand from Glidden to Chimney Rock and crushed stone from Chimney Rock to
131Eatontown.&nbsp; Unfortunately, Conrail’s efforts for the train did not
132quite make the appeal to customers and the train was discontinued.</font></font>
133<br>&nbsp;
134<p><img SRC="Track.gif" height=31 width=928>
135<p><font face="Courier New,Courier"><font size=-1>Since then, very few
136changes have been made to the Main Line.&nbsp; Some of the old CNJ mile
137markers still exist, as do all “W” signs.&nbsp; A rusty rail condition
138exists on the former Main Line and Toms River branch.&nbsp; Conrail removed
139the connection with the South Lakewood siding and they no longer serve</font></font>
140<font face="Courier New,Courier"><font size=-1>Ciba Geigy as the plant
141closed.&nbsp; The siding in South Lakewood at Whitesville Road still</font></font>
142<font face="Courier New,Courier"><font size=-1>exists, but its connections
143with the line have been removed and the line was cut at</font></font> <font face="Courier New,Courier"><font size=-1>Whitesville
144Road.&nbsp; One can see the siding partially hidden by brush.&nbsp; Lakehurst
145to Winslow Junction is nearly</font></font> <font face="Courier New,Courier"><font size=-1>intact,
146despite parts of the line not being used in almost over two decades.&nbsp;
147Construction sand, so vital to the CNJ in the 1970s, is now moved strictly
148by truck.&nbsp; The line is drilled about twice a week.&nbsp; Motive power
149is usually in the form of GP38, GP38-2 or GP40-2 locomotives, usually paired.&nbsp;
150Current speed</font></font> <font face="Courier New,Courier"><font size=-1>restrictions
151result in 25 m.p.h. from Red Bank to the Lakewood-Howell border, then 10
152m.p.h.</font></font> <font face="Courier New,Courier"><font size=-1>through
153downtown Lakewood, and back to 25 m.p.h. from Route 9 in Lakewood to Lakehurst.&nbsp;
154The Weyerhauser facility, located in Howell, closed in November 2000.&nbsp;
155On</font></font> <font face="Courier New,Courier"><font size=-1>the Toms
156River Industrial Track, many grade crossings are simply “crossbucks”, resulting
157in</font></font> <font face="Courier New,Courier"><font size=-1>the crew
158having to stop and flag.&nbsp; The line ceases at Route 37, trains only
159cross the highway to back cars into a lumber yard.&nbsp; Freight on the
160former NY&amp;LB no longer moves past Red Bank.</font></font><font face="Courier New,Courier"><font size=-1></font></font>
161<p><font face="Courier New,Courier"><font size=-1>July 1999 saw the breakup
162of Conrail and the first non-Conrail locomotives in twenty-three years.&nbsp;
163Some locomotives still wear Conrail blue, but are sub-lettered for either
164Norfolk Southern or CSX.&nbsp; The Southern Secondary is part of the Shared
165Assets area, meaning Conrail operates the line for CSX and NS.&nbsp; Conrail
166and Builders General Supply in Little Silver and Toms River reached an
167agreement to receive those shipments to their Freehold location (circa
168July 2000).&nbsp; Now, only Columbia Propane remains on the Toms River
169Industrial Track, and they are seasonal.&nbsp; That results in the trackage
170being unused for most of the year at this time.</font></font>
171<p><font face="Courier New,Courier"><font size=-1>In June 2002, work was
172completed on reconnecting the Lakehurst Naval base with the Southern Secondary.&nbsp;
173The spur was rehabbed to allow the Navy to move soil taken from the Bomarc
174missile site via rail.&nbsp; PolyOne, one of the bigger customers based
175on carloads received, located near Collingswood Auction, closed in the
176latter part of 2002.&nbsp; Some of the areas of the old South Lakewood
177sand pits are now being developed.&nbsp; One such development is called
178Renaissance. In June 2003, plans were announced that builder H.K. Hovnanian
179would build 2,400 homes in the old Heritage Minerals site in Whiting.&nbsp;
180Another area seeing more development is Lakewood.&nbsp; In October 2003,
181the land was cleared and foundations started along the tracks one block
182north of DiNaso &amp; Sons.&nbsp; Also in June 2003, the SA35 was abolished.&nbsp;
183The Southern Secondary local is now run by the SA31, which also operates
184on the Freehold Secondary.&nbsp; As a result, obviously, the run times
185of the train have changed.&nbsp;&nbsp;</font></font><font face="Courier New,Courier"><font size=-1></font></font>
186<p><font face="Courier New,Courier"><font size=-1>The future holds some
187promise for the Southern Secondary.&nbsp; The Monmouth-Ocean-Middlesex
188passenger line is finally moving forward.&nbsp; With track upgrades, the
189speed restrictions will be lifted and the running time for freight service
190will decrease, which may bring more shippers along the line.&nbsp; Only
191time will tell what will happen to the former CNJ Southern Division Main
192Line.</font></font>
193<center><a href="May03-Lkt02.jpg">Photo 1 of rehabbed spur</a>&nbsp;&nbsp;
194
195<a href="May03-Lkt03.jpg">Photo 2 of rehabbed spur</a>
196<br><font face="Courier New,Courier"><font size=-1>May 2003 Photos of the
197Glidden spur:&nbsp; <a href="glidden.jpg">Photo 1</a>&nbsp; <a href="glidden2.jpg">Photo
1982</a></font></font>
199<br><font face="Courier New,Courier"><font size=-1><a href="index.html">
199home</a></font></font></center>
200
201<script type="module" src="https://static.cloudflareinsights.com/beacon.min.js/v31edd6df95cf4e85bb4c19e7a9bdbcba1788362987495" integrity="sha512-iIg7k2xntmwu6/uSb5tpc/hySgZc4eoL31yB29W6tJFo2akwjPWcEqnCEdJvGexCL0KEQwVYv5BlowfhVz26hg==" data-cf-beacon='{"version":"2024.11.0","token":"80ca0f114b1445c391548e3eba18d8b7","r":1,"spa":2}' crossorigin="anonymous"></script>
201
202</body>
203</html>

Line numbers count LF bytes from the start of the resource, as the search results do. Vendor segments are library code the classifier recognised; they are stored but not indexed. Bytes are shown as Latin1 characters, one per byte.