PageSourceSearch

Site profile

thefreedomsproject.com

Built with gtag, magnific-popup 1.1.0, facebook-sdk, recaptcha, sa-sdk-javascript 1.27.14, twitter-widgets, jquery-menu-aim 1.1.0, luckysheet 2.1.13, wordcloud 1.2.3, ibp-max 3.1.40, layui-src 2.6.8, jquery.scrollup 2.4.1. 5 pages and 25 stored files.

rank 2,502,615 12 libraries 2 identifiers 0 third-party hosts 0 crawls open the site

Technologies and libraries

Recognised by fingerprinting the stored files and bundles against known releases; a version is the release the bytes match.

LibraryVersionSeen
gtag 2026-09-26
magnific-popup 1.1.0 2026-09-26
facebook-sdk 2026-09-26
recaptcha 2026-09-26
sa-sdk-javascript 1.27.14 2026-09-26
twitter-widgets 2026-09-26
jquery-menu-aim 1.1.0 2026-09-26
luckysheet 2.1.13 2026-09-26
wordcloud 1.2.3 2026-09-26
ibp-max 3.1.40 2026-09-26
layui-src 2.6.8 2026-09-26
jquery.scrollup 2.4.1 2026-09-26

Tracking, tag and verification IDs

Public identifiers read out of the source. Each links to every other site in the index that carries the same one.

WhatValueFound in
reCAPTCHA site key (Google) 6LdkKOYUAAAAAIk8shDR2Thr1ZXYQulT8F5NnMDJ view source
Universal Analytics property id (Google) UA-81640800-1 view source

Third-party hosts

The stored pages and scripts reference no host outside thefreedomsproject.com.

Stored pages and scripts

The newest stored version of each file, newest first@if (p.FilesTruncated) { (the 500 newest of 25) }. Versions are the crawls at which the file was new or its content changed; each opens the file as it was then, rebuilt from the same stored chunks.

FileKindSizeCollectedVersions
https://cdn.jsdelivr.net/npm/[email protected].…/jquery.magnific-popup.min.js js library not fetched 2026-09-26 current
https://connect.facebook.net/en_GB/sdk.js js library not fetched 2026-09-26 current
https://platform.twitter.com/widgets.js js library not fetched 2026-09-26 current
https://thefreedomsproject.com/media/com_rsform/js/script.js js 77.5 KB 2026-09-26 current
https://thefreedomsproject.com/media/plg_system_…/js/recaptchav2.js js 1.7 KB 2026-09-26 current
https://www.google.com/recaptcha/api.js?render=6…AAAAIk8shDR2Thr1ZXYQulT8F5NnMDJ js library not fetched 2026-09-26 current
https://www.google.com/recaptcha/api.js?render=explicit js library not fetched 2026-09-26 current
https://www.googletagmanager.com/gtag/js?id=UA-81640800-1 js library not fetched 2026-09-26 current
https://thefreedomsproject.com/modules/mod_responsivemenu/js/theme2.js js 3.3 KB 2026-09-26 current
https://thefreedomsproject.com/modules/mod_respo…/js/jquery.easing.1.3.js js 7.9 KB 2026-09-26 current
https://thefreedomsproject.com/media/mod_cmc/js/cmc.js js 2.2 KB 2026-09-26 current
https://thefreedomsproject.com/media/system/js/v…2b966507d469e3c2617129700c9b6ca js 3.1 KB 2026-09-26 current
https://thefreedomsproject.com/media/system/js/p…2b966507d469e3c2617129700c9b6ca js 2.8 KB 2026-09-26 current
https://thefreedomsproject.com/media/system/js/c…2b966507d469e3c2617129700c9b6ca js 8.5 KB 2026-09-26 current
https://thefreedomsproject.com/media/system/js/m…2b966507d469e3c2617129700c9b6ca js 81.9 KB 2026-09-26 current
https://thefreedomsproject.com/media/jui/js/boot…2b966507d469e3c2617129700c9b6ca js 28.4 KB 2026-09-26 current
https://thefreedomsproject.com/media/k2/assets/j…?v=2.10.3&b=20200429&sitepath=/ js 8.3 KB 2026-09-26 current
https://thefreedomsproject.com/media/jui/js/jque…2b966507d469e3c2617129700c9b6ca js 9.8 KB 2026-09-26 current
https://thefreedomsproject.com/media/jui/js/jque…2b966507d469e3c2617129700c9b6ca js 21 B 2026-09-26 current
https://thefreedomsproject.com/media/jui/js/jque…2b966507d469e3c2617129700c9b6ca js 95.4 KB 2026-09-26 current
https://thefreedomsproject.com/testimonies html 96.7 KB 2026-09-26 current
https://thefreedomsproject.com/contact html 40.2 KB 2026-09-26 current
https://thefreedomsproject.com/about/about-kathy html 38.5 KB 2026-09-26 current
https://thefreedomsproject.com/item/694-when-the…e-common-good-becomes-socialism html 66.3 KB 2026-09-26 current
https://thefreedomsproject.com/ html 52.2 KB 2026-09-26 current

Timeline

No crawl has recorded a snapshot of this site yet; snapshots are written by every crawl from now on.

Questions about thefreedomsproject.com

How does PageSourceSearch know what thefreedomsproject.com is built with?
From the site's own source code. The crawler stores the exact bytes of its pages and first-party scripts; the libraries are recognised by fingerprinting that code against known releases, the identifiers are read out of the tag snippets, and the third-party hosts are the script, iframe and stylesheet sources in the HTML and the absolute URLs inside the scripts. Nothing is inferred from headers or guessed.
How far back does the history of thefreedomsproject.com go?
To the first crawl the timeline lists. Every crawl records what the site looked like; when a file's content changes, its earlier version stays viewable because the stored chunks are never deleted, only mapped. A crawl that finds a file unchanged adds no copy.
Can I see an older version of a script from thefreedomsproject.com?
Yes. In the stored files list, every date under a file opens the version that was live at that crawl, with the same viewer as the current one. The raw bytes can be downloaded from there.
Which other websites use the same tracking IDs as thefreedomsproject.com?
Each identifier links to its reverse lookup, the list of every site in the index whose source carries the same id: the sites one analytics property or tag manager container is shared across.

Look up another site, browse sites by tracking ID, third-party host or technology. Site owners: see the crawler page for how stored pages are removed.